I. STONEFIELD'S TERMINATION WAS VALID AND PROPER — SUMMARY POSITION High
⚑ Penalty / liquidated damages
I. STONEFIELD'S TERMINATION WAS VALID AND PROPER — SUMMARY POSITION At the outset, Stonefield wishes to state its position clearly and without ambiguity: Stonefield's termination of the TSA on March 4, 2022, was a valid termination for Cause pursuant to Section 13.1(a) of the TSA. That section provides Stonefield with the express right to terminate the TSA upon the occurrence of a material breach by VTS that remains
II. FACTUAL BASIS FOR TERMINATION — VTS'S MATERIAL BREACHES
II. FACTUAL BASIS FOR TERMINATION — VTS'S MATERIAL BREACHES Your demand letter conspicuously fails to address the well-documented and pervasive service failures by VTS that gave rise to Stonefield's termination of the TSA. These failures were not isolated incidents or minor, marginal deviations from VTS's contractual obligations. Rather, they represented a sustained, systemic, and severe pattern of underperformance t
1. On-Time Pickup Rate. VTS's on-time pickup rate during Q4 2021 fell to 78.2%, against t
1. On-Time Pickup Rate. VTS's on-time pickup rate during Q4 2021 fell to 78.2%, against the TSA-required SLO of ≥ 95%. This represents a shortfall of nearly seventeen (17) percentage points — a deficiency that is by no measure marginal or excusable.
2. On-Time Delivery Rate. VTS's on-time delivery rate during Q4 2021 fell to 81.6%, again
2. On-Time Delivery Rate. VTS's on-time delivery rate during Q4 2021 fell to 81.6%, against the TSA-required SLO of ≥ 93%. Nearly one in five shipments failed to arrive at the designated destination within the contractually specified delivery window, causing cascading disruptions to Stonefield's customers' supply chains and distribution operations.
3. Tender Acceptance Rate. VTS's tender acceptance rate during Q4 2021 dropped to 71.4%,
3. Tender Acceptance Rate. VTS's tender acceptance rate during Q4 2021 dropped to 71.4%, against the TSA-required SLO of ≥ 90%. This means that VTS rejected or failed to accept nearly three out of every ten freight tenders submitted by Stonefield, leaving Stonefield to scramble for alternative capacity on short notice and at significant additional cost.
4. Equipment Availability. VTS's equipment availability during Q4 2021 fell to approximat
4. Equipment Availability. VTS's equipment availability during Q4 2021 fell to approximately 62% of committed fleet capacity. Under the TSA, VTS committed to maintaining a minimum fleet of four hundred (400) tractors available for deployment in support of its obligations. VTS made available only approximately 248 tractors — a shortfall of approximately 152 units — against the TSA-required SLO of ≥ 85% fleet availabil
Section 7.4 of the TSA expressly requires VTS to provide substitute equipment or surge cap
Section 7.4 of the TSA expressly requires VTS to provide substitute equipment or surge capacity in the event that VTS is unable to meet Stonefield's freight volume requirements using its own fleet. This provision was a material inducement to Stonefield's entry into the TSA, as Stonefield's business model depends on reliable, consistent carrier capacity to meet its own contractual obligations to its customers. Through
III. RESPONSE TO VANTOR'S SPECIFIC ALLEGATIONS High
⚑ Non-compete / exclusivity restraint
III. RESPONSE TO VANTOR'S SPECIFIC ALLEGATIONS Your demand letter raises several specific allegations in support of the Vantor Parties' contention that Stonefield's termination was wrongful. Stonefield addresses and rejects each of these allegations in turn. A. Allegation: Stonefield Failed to Tender Minimum Annual Committed Volume Your demand letter asserts that Stonefield failed to meet its Annual Committed Volume
IV. REJECTION OF DAMAGES CLAIM High
⚑ Penalty / liquidated damages
IV. REJECTION OF DAMAGES CLAIM Stonefield rejects in its entirety the Vantor Parties' demand for payment of $95,400,000. The demand is without legal or factual basis, and each component of the claimed damages is addressed below. No Liquidated Damages Are Owed. The liquidated damages provision of the TSA is set forth in Section 14.2. By its express terms, Section 14.2 applies only to terminations "other than for Cause
V. INVOCATION OF SECTION 16 — MANDATORY EXECUTIVE NEGOTIATION
V. INVOCATION OF SECTION 16 — MANDATORY EXECUTIVE NEGOTIATION Without waiving any of Stonefield's rights, remedies, or defenses under the TSA, at law, or in equity, and without conceding liability of any kind or to any extent, Stonefield hereby invokes the mandatory executive negotiation procedure set forth in Section 16 of the TSA.
Section 16 of the TSA provides that, prior to the initiation of any litigation or other le
Section 16 of the TSA provides that, prior to the initiation of any litigation or other legal proceedings arising out of or relating to the TSA, the parties shall engage in a thirty (30) day executive negotiation period. During this period, senior representatives of each party, designated in writing, shall attempt in good faith to resolve any dispute through direct negotiation. This provision is a condition precedent
1. Stonefield's Designated Representative. Stonefield designates Marcus Denton, Chief Exe
1. Stonefield's Designated Representative. Stonefield designates Marcus Denton, Chief Executive Officer of Stonefield Logistics Group Inc., as its senior representative for purposes of the executive negotiation.
2. Vantor's Designated Representative. Stonefield proposes that Nikolai Vantorovich, Chie
2. Vantor's Designated Representative. Stonefield proposes that Nikolai Vantorovich, Chief Executive Officer and Founder of Vantor Holdings Corp., serve as Vantor's senior representative for purposes of the executive negotiation.
3. Proposed Timing. Stonefield proposes that the initial executive negotiation meeting ta
3. Proposed Timing. Stonefield proposes that the initial executive negotiation meeting take place within fifteen (15) business days of the date of this letter, at a mutually convenient location or, if preferred by the parties, via videoconference. Stonefield approaches the executive negotiation process in good faith and with a genuine willingness to explore whether the parties can reach a mutually acceptable resoluti
VI. RESERVATION OF RIGHTS High
⚑ Penalty / liquidated damages
VI. RESERVATION OF RIGHTS Stonefield expressly reserves all of its rights, remedies, and defenses under the TSA, at law, and in equity, including but not limited to the following: (a) The right to assert that the termination of the TSA was valid and effective for Cause pursuant to Section 13.1(a) of the TSA; (b) The right to challenge the enforceability of the liquidated damages provision set forth in Section 14.2 of
VII. FUTURE CORRESPONDENCE
VII. FUTURE CORRESPONDENCE All future correspondence regarding this matter should be directed to the undersigned at the address set forth below. If the Vantor Parties elect to proceed through outside counsel, I respectfully request that you or your designated colleague contact me directly at your earliest convenience to arrange the executive negotiation meeting contemplated by Section 16 of the TSA. Stonefield remain