Contract analysis
Clause-by-clause risk read on any document of the firm. Pick a contract, or open any document from a matter.
Contract analysis / strategic-assessment-litigation-recommendation.docx
strategic-assessment-litigation-recommendation.docx
High · 1
Medium · 5
Standard · 7
I. EXECUTIVE SUMMARY
I. EXECUTIVE SUMMARY The purpose of this memorandum is to provide Verimark Hospitality Group Inc. ("VHG" or the "Company") with a comprehensive evaluation of the merits, risks, and recommended course of action for pursuing insurance coverage claims against all four insurers in VHG's property and business-interruption insurance tower for approximately $60 million in business-interruption ("BI") losses arising from Hur
II. BACKGROUND AND FACTUAL SUMMARY
Standard
⚑ Commercial term
II. BACKGROUND AND FACTUAL SUMMARY A. The Insured — Verimark Hospitality Group Inc. Verimark Hospitality Group Inc. is a Delaware corporation, publicly traded on the Nasdaq Stock Exchange under the ticker symbol VMRK. The Company is headquartered at 1900 Brickell Avenue, Suite 3200, Miami, Florida 33129. VHG is a premier operator of luxury resort hotels and conference centers in the State of Florida, with a portfolio
1. Verimark Grand Key Resort — Marathon, Florida
Standard
⚑ Commercial term
1. Verimark Grand Key Resort — Marathon, Florida The Verimark Grand Key Resort is located at Mile Marker 48, Marathon, Florida 33050, in the Middle Florida Keys. The property is a 312-room luxury resort and marina, situated directly on the waterfront with extensive outdoor amenities, including pools, dining facilities, a full-service marina, and water-sports operations. Prior to Hurricane Callista, the Grand Key Reso
2. Verimark Harborview Hotel & Conference Center — Fort Myers Beach, Florida
Standard
⚑ Commercial term
2. Verimark Harborview Hotel & Conference Center — Fort Myers Beach, Florida The Verimark Harborview Hotel & Conference Center is located at 1400 Estero Boulevard, Fort Myers Beach, Florida 33931, on the Gulf Coast of Lee County. The property is a 224-room hotel with a 40,000-square-foot conference and event facility, which served as a significant revenue driver through group bookings, corporate events, and destinati
3. Verimark Sunset Shores — St. Pete Beach, Florida
Standard
⚑ Commercial term
3. Verimark Sunset Shores — St. Pete Beach, Florida The Verimark Sunset Shores is located at 7200 Gulf Boulevard, St. Pete Beach, Florida 33706, on the Gulf Coast of Pinellas County. The property is a 186-room boutique resort with a more intimate atmosphere and higher price point, catering to leisure travelers and small-group retreats. The Sunset Shores' pre-loss ADR was $342, with an average occupancy rate of approx
4. Total Aggregate Claimed Business-Interruption Loss
Medium
⚑ Notice / time limit to track
4. Total Aggregate Claimed Business-Interruption Loss The total aggregate BI loss claimed by VHG across all three properties is as follows: D. Insurance Program Structure VHG maintains an all-risk property and business-interruption insurance program with a common policy period of July 1, 2022, through July 1, 2023. The program was placed through VHG's insurance broker of record, Tidewater Risk Advisors LLC ("Tidewate
III. COVERAGE ISSUES — MERITS ASSESSMENT
III. COVERAGE ISSUES — MERITS ASSESSMENT This section provides a summary assessment of each contested coverage issue. For detailed legal analysis, including citation to controlling case law and policy language, the reader is referred to the Firm's prior memoranda on each issue, which are incorporated herein by reference. A. Issue 1: Named Windstorm Sub-Limit ($15 Million)
1. Ironclad's Position
Medium
⚑ Liability cap to check against exposure
1. Ironclad's Position Ironclad asserts that the primary policy, Policy No. IIC-PRP-2022-07541, contains a named-windstorm sub-limit of $15 million for business-interruption losses arising from named windstorm events. If this sub-limit is applied, VHG's maximum BI recovery under the primary layer would be capped at $15 million (less the $500,000 per-occurrence deductible), or $14.5 million net. More critically, the a
2. VHG's Position and Analysis
Medium
⚑ Liability cap to check against exposure
2. VHG's Position and Analysis VHG contends that the $15 million named-windstorm sub-limit was affirmatively deleted during the July 2022 renewal negotiations, as part of an overall restructuring of VHG's insurance program. VHG's position is supported by substantial evidence, which was analyzed in detail in the Firm's October 20, 2022 memorandum prepared by Tiffany Rosenthal and Andrew Fitzpatrick. The key evidence s
1. Ironclad's Position
1. Ironclad's Position Ironclad's second coverage defense is based on the policy's flood exclusion and its anti-concurrent causation ("ACC") clause. Ironclad argues that portions of the damage at the VHG properties — particularly at the Grand Key Resort in Marathon — resulted from storm surge, which Ironclad characterizes as "flood" within the meaning of the policy's flood exclusion. Ironclad contends that because th
2. VHG's Position and Analysis
Standard
⚑ Commercial term
2. VHG's Position and Analysis VHG's position on this issue was analyzed in detail in the Firm's November 1, 2022 memorandum (addressing Florida anti-concurrent causation jurisprudence) and December 2, 2022 memorandum (addressing the applicability of the flood exclusion to storm-surge damage associated with a named windstorm). VHG's arguments on this issue are multi-layered: First, under Florida law, the enforceabili
1. Ironclad's Position
1. Ironclad's Position Ironclad's third coverage defense challenges the reasonableness of VHG's claimed periods of restoration at each of the three properties. The business-interruption coverage provision in the Ironclad policy provides that BI loss is measured during the "period of restoration," which the policy defines as: "The period of time that: (a) begins with the date of direct physical loss or damage caused b
2. VHG's Position and Analysis
Standard
⚑ Commercial term
2. VHG's Position and Analysis VHG contends that its claimed restoration periods are entirely reasonable under the circumstances and are well within the range of what constitutes repair "with reasonable speed" given the unprecedented devastation caused by Hurricane Callista. The Firm's November 10, 2022 memorandum analyzed this issue in detail. VHG's restoration timelines were reasonable and, in many respects, aggres
1. Ironclad's Position
1. Ironclad's Position Ironclad's fourth and final stated coverage defense is that VHG failed to take reasonable steps to reduce the period of business interruption and thereby mitigate its BI losses. Specifically, Ironclad has alleged that VHG: (a) did not engage restoration contractors soon enough after the storm; (b) failed to pursue temporary or partial operations at the affected properties; and (c) did not diver
2. VHG's Position and Analysis
2. VHG's Position and Analysis VHG's mitigation efforts were prompt, reasonable, and extensive under the catastrophic circumstances. The Company took numerous affirmative steps to reduce the period and extent of business interruption, including: (a) Immediate Engagement of Emergency Contractors. Within 48 hours of Hurricane Callista's passage, VHG's facilities management team mobilized emergency remediation contracto
IV. POTENTIAL CAUSES OF ACTION
High
⚑ Indemnity / guarantee obligation
IV. POTENTIAL CAUSES OF ACTION Based on the foregoing analysis, we recommend that VHG's complaint assert the following causes of action against the defendant insurers: A. Breach of Contract (All Defendants) VHG holds valid, enforceable all-risk property and business-interruption insurance policies with each of the four carriers in its insurance tower. Hurricane Callista constitutes a covered occurrence under each pol
V. FORUM SELECTION AND JURISDICTIONAL ANALYSIS
Standard
⚑ Commercial term
V. FORUM SELECTION AND JURISDICTIONAL ANALYSIS A. Recommended Forum We recommend that VHG file this action in the Eleventh Judicial Circuit of Florida, in and for Miami-Dade County (state court). This recommendation is based on the following considerations: Policyholder-Favorable Jurisprudence. Florida state courts have a well-established body of pro-policyholder insurance jurisprudence. Florida courts consistently a
VI. DEFENDANTS' ANTICIPATED AFFIRMATIVE DEFENSES
VI. DEFENDANTS' ANTICIPATED AFFIRMATIVE DEFENSES Based on the insurers' communications to date, including Ironclad's reservation of rights letter, Pinnacle's follow-form correspondence, and the Firm's experience in insurance coverage litigation, we anticipate the following affirmative defenses from each defendant: A. Ironclad Indemnity Corporation Ironclad is expected to assert the following defenses in its answer to
1. Named Windstorm Sub-Limit. Ironclad will contend that the $15 million named-windstorm
Medium
⚑ Liability cap to check against exposure
1. Named Windstorm Sub-Limit. Ironclad will contend that the $15 million named-windstorm sub-limit was not deleted from the 2022–2023 policy and that VHG's BI recovery is capped at $15 million. For the reasons discussed in Section III.A above, we believe this defense will not prevail.
2. Flood Exclusion / Anti-Concurrent Causation. Ironclad will argue that the flood exclus
2. Flood Exclusion / Anti-Concurrent Causation. Ironclad will argue that the flood exclusion, as amplified by the ACC clause, bars or substantially reduces recovery for storm-surge-related losses. For the reasons discussed in Section III.B above, we believe this defense has limited merit, particularly in light of the forensic engineering evidence.
3. Period of Restoration. Ironclad will argue that VHG's claimed restoration periods are
3. Period of Restoration. Ironclad will argue that VHG's claimed restoration periods are unreasonable and overstated, and that BI losses should be calculated using the shorter restoration periods estimated by Arbor Claims Services. For the reasons discussed in Section III.C above, we believe VHG's restoration timelines are reasonable and defensible.
4. Failure to Mitigate. Ironclad will argue that VHG failed to take reasonable steps to r
4. Failure to Mitigate. Ironclad will argue that VHG failed to take reasonable steps to reduce the period and extent of its business interruption. For the reasons discussed in Section III.D above, this is a weak defense that is unlikely to succeed.
5. Late Notice. Ironclad may raise a late-notice defense, although this is unlikely to su
Medium
⚑ Notice / time limit to track
5. Late Notice. Ironclad may raise a late-notice defense, although this is unlikely to succeed. VHG provided notice of loss on September 22, 2022 — only four days after Hurricane Callista's landfall on September 18, 2022. Given the catastrophic conditions in the immediate aftermath of the storm, including power outages, road closures, and communications disruptions, four-day notice is not only reasonable but commenda