Contract analysis / gallatin-corrective-measures-sow.docx
gallatin-corrective-measures-sow.docx
1039-00003 · 5 clauses
High · 1 Medium · 2 Standard · 2
I. INTRODUCTION AND PURPOSE High
⚑ Penalty / liquidated damages
I. INTRODUCTION AND PURPOSE 1.1 Background This document sets forth the Scope of Work and Schedule for the Corrective Measures Study ("CMS") to be conducted at the Gallatin Chemical Works facility (the "Gallatin Site" or "Facility") located at 8800 Industrial Park Lane, Belgrade, Gallatin County, Montana 59714. The CMS is being undertaken in accordance with the requirements of the Resource Conservation and Recovery A
II. SITE DESCRIPTION AND OPERATIONAL HISTORY Standard
⚑ Commercial term
II. SITE DESCRIPTION AND OPERATIONAL HISTORY 2.1 Site Location and Physical Description The Gallatin Chemical Works facility is located at 8800 Industrial Park Lane, Belgrade, Gallatin County, Montana 59714. The Facility occupies approximately 145 acres of industrially zoned land within the Belgrade Industrial Park, situated approximately 2.5 miles northwest of downtown Belgrade and approximately 9 miles west-northwe
III. NATURE AND EXTENT OF CONTAMINATION Standard
⚑ Commercial term
III. NATURE AND EXTENT OF CONTAMINATION 3.1 Summary of Contaminants of Concern Based on the results of the RCRA Facility Investigation ("RFI"), EPA Compliance Evaluation Inspections, historical groundwater and soil monitoring data, and MPDES discharge monitoring reports, the following contaminants of concern ("COCs") have been identified at the Gallatin Site: Carbon Disulfide (CS₂) in Groundwater. Carbon disulfide is
IV. CORRECTIVE MEASURES OBJECTIVES Medium
⚑ Liability cap to check against exposure
IV. CORRECTIVE MEASURES OBJECTIVES 4.1 Overall Objectives The corrective measures to be evaluated through the CMS shall be designed to achieve the following objectives: (a) Protect human health and the environment from further releases of hazardous waste and hazardous constituents from the SWMUs and other areas of contamination at the Gallatin Site, and mitigate the risks posed by existing contamination in soil, grou
V. SCOPE OF WORK — CMS ACTIVITIES Medium
⚑ Notice / time limit to track
V. SCOPE OF WORK — CMS ACTIVITIES 5.1 Phase 1: Data Gap Evaluation and Supplemental Investigation 5.1.1 Existing Data Review Pinnacle Creek Environmental will conduct a comprehensive review and evaluation of all existing environmental data for the Gallatin Site, including but not limited to: (a) RFI Final Report (Pinnacle Creek Environmental, LLC, September 2024) and all supporting data packages; (b) EPA Compliance E