Document TitleMaster Docket Sheet — OWS Patent Application Family
ClientOptiwave Semiconductor Corp.
Client Short NameOWS
Client Address4710 Ridgeview Parkway, Suite 300, Santa Clara, CA 95054
Client EIN83-2947105
Client Delaware File No.7284931
Client California SOS Entity No.C4195872
FirmCalderwood & Harkness LLP
Firm Address555 California Street, 42nd Floor, San Francisco, CA 94104
C&H Matter No.1014-00005
Engagement OpenedFebruary 14, 2022
Engagement Letter ExecutedFebruary 10, 2022
Responsible PartnerCatherine Bloom (USPTO Reg. No. 58,412)
Billing PartnerAlan Ngo (USPTO Reg. No. 61,877)
Lead AssociateChristy Bauer (USPTO Reg. No. 74,329)
Working AssociatePeter Vassiliev (USPTO Reg. No. 79,514)
Docket StatusDORMANT — Budget freeze effective August 11, 2023 (Project Lighthouse)
Last Billable ActivitySeptember 6, 2023 (2-month extension filed for A1, 17/672,204)
Last UpdatedJanuary 15, 2025
Updated ByChristy Bauer
Docketing AgentTrident intellectual Property Services, LLC (Account Mgr: Lisa Cheng)
Prior Patent CounselKessler & Morin LLP (Dr. Helen Kessler, lead partner)
Japanese Foreign AssociateNakashima & Togawa Patent Professional Corp. (Kenji Nakashima)
European Foreign AssociateBreitenfeld & Vogt Patentanwälte PartGmbB (Dr. Matthias Vogt)
PE SponsorHarborview Partners
LenderMeridian National Bank, N.A. — $55M Senior Secured Revolving Credit Facility (IP collateral pledge; $32.5M drawn as of Dec. 31, 2024)
IP Valuation (Graystone Valuation Advisors, Apr. 28, 2023)Total portfolio: $38.5M; Pending app. family: $12.2M
ClassificationPRIVILEGED AND CONFIDENTIAL — ATTORNEY WORK PRODUCT

[sheet: Priority Application]

Docket IDApplication No.Application TypeTitleFiling DateJurisdictionFiled ByNamed InventorsStatusExpiration DateNotes
PROV-163/297,841U.S. ProvisionalMulti-Channel Silicon-Photonic Mach-Zehnder Modulator with Segmented Traveling-Wave Electrode ArchitectureJanuary 10, 2022USPTOKessler & Morin LLP (Dr. Helen Kessler)Dr. Rajan Menon; Dr. Lena Strickland; Dr. Feng-Yi Chen; Dr. Arjun DasguptaEXPIREDJanuary 10, 2023 (12-month statutory term)Priority preserved through timely non-provisional filings (A1, A4, A5 filed Jan. 9, 2023). Originally filed by Kessler & Morin LLP prior to engagement transition to C&H.

[sheet: Pending Applications]

Docket IDSub-FamilyApplication No.Application TypeFiling DateJurisdictionPriority ClaimProsecution StatusNext DeadlineDeadline DescriptionExtensions PurchasedFurther Extensions AvailablePriority FlagResponsible AttorneyDrafter / Primary HandlerForeign AssociateEstimated Cost to Address Next ActionPinnacle Design-Around RelevanceGraystone Valuation NotesLender Covenant RelevanceNotes
A1A — Core Modulator Architecture17/672,204U.S. Non-ProvisionalJanuary 9, 2023USPTOClaims priority to Provisional 63/297,841 (filed Jan. 10, 2022)Non-final Office Action received; draft response in progress (incomplete — suspended Aug. 2023 due to budget freeze); 2-month extension of time filed Sep. 6, 2023 (fee: $640)March 9, 2025Final deadline to respond to non-final Office Action (6-month statutory period; 2-month extension purchased Sep. 6, 2023; remaining 4 months expire Mar. 9, 2025)2-month extension filed Sep. 6, 2023 ($640 small entity fee)NO — all extensions consumed; ABSOLUTE DEADLINEREDCatherine BloomChristy BauerN/A$22,000–$30,000 (40–55 attorney hours at blended rate + USPTO fees; ~$2,000 if RCE needed)CRITICAL — Claims tapered impedance-matching design-around feature to distinguish over Pinnacle Optics U.S. Pat. Nos. 10,823,417 and 11,105,662. Abandonment eliminates defensive patent position and exposes OWS to infringement assertion. FTO analysis (Oct. 14, 2022) rated risk as moderate-to-high absent design-around.Part of pending family valued at $12.2M by Graystone Valuation Advisors (Apr. 28, 2023 report). Foundational application of the family.Likely constitutes Material intellectual Property under Meridian Credit Facility Section 5.15; abandonment may trigger covenant default.HIGHEST PRIORITY. Foundational U.S. application for the entire family. Incomplete draft OA response prepared by Christy Bauer through Aug. 2023 — requires completion, partner review by Catherine Bloom, and filing before Mar. 9, 2025. No further extensions available.
A2A — Core Modulator Architecture17/672,311U.S. ContinuationMarch 15, 2023USPTOContinuation of 17/672,204; claims priority to Provisional 63/297,841Awaiting First Office ActionEst. Q2 2025Estimated first Office Action issuance (no response deadline yet set)N/AN/A — no deadline pendingGREENCatherine BloomChristy BauerN/ANo immediate cost; response cost TBD upon OA issuanceContinuation provides additional claim scope options for design-around strategyPart of $12.2M pending family valuationFalls within general IP covenant languageNo immediate action required. Continuation vehicle for alternative claim sets.
A3A — Core Modulator Architecture17/672,489U.S. Continuation-in-PartJune 22, 2023USPTOCIP of 17/672,204; claims priority to Provisional 63/297,841; includes new matterAwaiting First Office ActionEst. Q3 2025Estimated first Office Action issuanceN/AN/AGREENCatherine BloomChristy BauerN/ANo immediate cost; response cost TBD upon OA issuanceIMPORTANT — Contains additional tapered impedance-matching embodiments; key complement to A1 for Pinnacle design-around coveragePart of $12.2M pending family valuationFalls within general IP covenant languageCIP adds new matter beyond provisional disclosure. Important backup if A1 claims are narrowed during prosecution.
A4A — Core Modulator ArchitecturePCT/US2023/010584PCT InternationalJanuary 9, 2023WIPO / USPTO (Receiving Office)Claims priority to Provisional 63/297,841 (filed Jan. 10, 2022)International phase complete; Chapter I report (ISR/WO) issued Jul. 14, 2023. EP regional phase entered as B3 (EP 23 741 682.3) on Jul. 5, 2023; JP national phase entered as B4 (JP 2024-542197) on Jul. 3, 2023.July 9, 202530-month national phase entry deadline (30 months from Jan. 10, 2022 priority date) for any additional jurisdictions beyond EP and JP already entered (e.g., South Korea, China)N/AN/A — statutory deadline; no extensionsYELLOWPeter VassilievPeter VassilievJurisdiction-dependentNational phase entry costs vary by jurisdiction (~$3,000–$8,000 per jurisdiction for filing fees + foreign associate fees)Enables international protection for modulator architecturePart of $12.2M pending family valuationInternational filings may be encompassed by general covenant languageDecision needed by OWS on which additional national phases (if any) to enter beyond EP and JP already entered. If no additional jurisdictions desired, deadline is moot for this application.
A5A — Core Modulator ArchitecturePCT/US2023/010612PCT InternationalJanuary 9, 2023WIPO / USPTO (Receiving Office)Claims priority to Provisional 63/297,841 (filed Jan. 10, 2022)International phase complete; Chapter I report issued Aug. 2, 2023. EP regional phase entered as C2 (EP 23 765 901.7) on Jul. 8, 2023; JP national phase entered as C3 (JP 2024-542305) on Jul. 8, 2023.July 9, 202530-month national phase entry deadline for any additional jurisdictions beyond EP and JP already enteredN/AN/A — statutory deadline; no extensionsYELLOWPeter VassilievPeter VassilievJurisdiction-dependentNational phase entry costs vary by jurisdiction (~$3,000–$8,000 per jurisdiction)Enables international protection for packaging/thermal aspectsPart of $12.2M pending family valuationInternational filings may be encompassed by general covenant languageSame decision point as A4. Client instruction needed on additional jurisdictions.
B1B — Electrode Fabrication Process17/814,057U.S. Non-ProvisionalJuly 21, 2023USPTORelated to Sub-Family A; claims priority to Provisional 63/297,841Restriction Requirement received; original 2-month response deadline was Oct. 21, 2024; emergency 4-month extension filed Oct. 18, 2024 ($2,560 fee) extending deadline to Apr. 21, 2025April 21, 2025Deadline to respond to Restriction Requirement (extended by 4-month purchased extension)4-month extension filed Oct. 18, 2024 ($2,560 small entity fee; authorized by Sandra Koh under emergency exception to Project Lighthouse)2 additional months purchasable (max total 6 months); would extend to Jun. 21, 2025 if neededREDCatherine BloomChristy Bauer / Peter VassilievN/A$4,500–$6,750 (8–12 attorney hours at blended rate; $0 USPTO fee for restriction response)Electrode fabrication process claims complement modulator architecture claimsPart of $12.2M pending family valuationLikely Material intellectual Property under Meridian covenantResponse requires election among restricted groups. Divisional application B2 to be filed upon election. Relatively straightforward response but requires client input on group election.
B2B — Electrode Fabrication Process17/814,103 (placeholder — not yet filed)U.S. Divisional (of B1)July 21, 2023 (placeholder filing date; actual divisional filing date TBD)USPTODivisional of 17/814,057 (B1); claims priority to Provisional 63/297,841PLACEHOLDER — Not yet filed; to be filed upon election/restriction response in B1Depends on B1 responseFiling deadline tracks B1 restriction response; divisional must be filed while B1 is pendingN/AN/AGREENCatherine BloomChristy BauerN/AIncluded in B1 response cost estimate; additional filing fees ~$1,600–$2,000Covers non-elected invention groups from B1 restrictionPart of $12.2M pending family valuationFalls within general covenant languageCannot file until B1 restriction response is submitted and election is made. Serial number 17/814,103 is a placeholder assigned at initial filing.
B3B — Electrode Fabrication ProcessEP 23 741 682.3European regional phase (derived from PCT A4, PCT/US2023/010584)July 5, 2023EPOClaims priority to Provisional 63/297,841 via PCT/US2023/010584Entered European regional phase; Extended European Search Report (EESR) received Nov. 17, 2023; response deadline set under EPO Rules 70a, 161, 162May 17, 2025Response to EESR due (6 months from deemed notification date of Nov. 17, 2023)N/AEPO further processing may be available if deadline missed (at additional cost/risk)YELLOWPeter VassilievPeter VassilievBreitenfeld & Vogt Patentanwälte PartGmbB (Dr. Matthias Vogt), Leopoldstrasse 44, 80802 Munich, Germany$15,000–$22,000 total (C&H fees $11,250–$16,875 for 20–30 hrs + B&V foreign associate fees €3,500–€5,000 + EPO examination fee ~€580 if not yet paid)European counterpart to electrode fabrication process claimsPart of $12.2M pending family valuationMay be encompassed by Meridian covenant depending on interpretation of 'Material intellectual Property'Status inquiry letter sent to B&V on Nov. 30, 2023 by Peter Vassiliev confirming EESR receipt and May 17, 2025 deadline. Requires coordination with B&V for response preparation.
B4B — Electrode Fabrication ProcessJP 2024-542197Japanese national phase (derived from PCT A4, PCT/US2023/010584)July 3, 2023JPOClaims priority to Provisional 63/297,841 via PCT/US2023/010584Entered Japanese national phase; awaiting examination request filing. Hold notice sent to Nakashima & Togawa on Sep. 20, 2023.January 9, 2026Examination request deadline (3 years from PCT international filing date of Jan. 9, 2023)N/AN/A — statutory deadline; no extensionsGREENPeter VassilievPeter VassilievNakashima & Togawa Patent Professional Corp. (Kenji Nakashima), 2-4-16 Toranomon, Minato-ku, Tokyo 105-0001, JapanJPO examination request fee ~¥150,000 + N&T associate fees ~¥200,000–¥350,000Japanese counterpart to electrode fabrication process claimsPart of $12.2M pending family valuationMay be encompassed by Meridian covenantHold notice sent to N&T Sep. 20, 2023 pending budget resolution. Deadline sufficiently distant but must be calendared.
C1C — Packaging & Thermal Management18/102,776U.S. Non-ProvisionalJanuary 29, 2024USPTORelated to Sub-Family A; claims benefit of earlier filingsFiled under pre-freeze budget authorization just before freeze fully took effect; awaiting First Office ActionEst. Q4 2025Estimated first Office Action issuanceN/AN/A — no deadline pendingGREENCatherine BloomChristy BauerN/ANo immediate cost; response cost TBD upon OA issuancePackaging/thermal claims are complementary but less directly relevant to Pinnacle design-aroundPart of $12.2M pending family valuationFalls within general covenant languageLast application filed in the family. Authorized under pre-freeze budget before Project Lighthouse fully implemented.
C2C — Packaging & Thermal ManagementEP 23 765 901.7European regional phase (derived from PCT A5, PCT/US2023/010612)July 8, 2023EPOClaims priority to Provisional 63/297,841 via PCT/US2023/010612Entered European regional phase; Rule 161/162 communication received; response filed Sep. 1, 2023 (by Peter Vassiliev via B&V). Awaiting EESR.Est. mid-2025Estimated EESR issuance; response deadline will be set upon receiptN/AN/A — no deadline pendingGREENPeter VassilievPeter VassilievBreitenfeld & Vogt Patentanwälte PartGmbB (Dr. Matthias Vogt)No immediate cost; EESR response costs TBDEuropean counterpart to packaging/thermal claimsPart of $12.2M pending family valuationMay be encompassed by Meridian covenantRule 161/162 response was the last substantive EPO filing before dormancy. Application is in good standing pending EESR.
C3C — Packaging & Thermal ManagementJP 2024-542305Japanese national phase (derived from PCT A5, PCT/US2023/010612)July 8, 2023JPOClaims priority to Provisional 63/297,841 via PCT/US2023/010612Entered Japanese national phase; awaiting examination request filing. Hold notice sent to Nakashima & Togawa on Sep. 20, 2023.January 9, 2026Examination request deadline (3 years from PCT international filing date of Jan. 9, 2023)N/AN/A — statutory deadline; no extensionsGREENPeter VassilievPeter VassilievNakashima & Togawa Patent Professional Corp. (Kenji Nakashima)JPO examination request fee ~¥150,000 + N&T associate fees ~¥200,000–¥350,000Japanese counterpart to packaging/thermal claimsPart of $12.2M pending family valuationMay be encompassed by Meridian covenantSame hold status as B4. Deadline sufficiently distant.

[sheet: Deadline Summary]

Priority RankDocket IDApplication No.JurisdictionDeadline DateDeadline TypePriority FlagAbsolute?Extensions RemainingEstimated CostConsequence of Missing DeadlineAction Required
1A117/672,204USPTOMarch 9, 2025Non-final Office Action response (6-month statutory; all extensions consumed)REDYes — ABSOLUTENone — 2-month extension already purchased; no further extensions available$22,000–$30,000ABANDONMENT of foundational U.S. application. Irrevocable loss of tapered impedance-matching design-around claims. OWS left exposed to Pinnacle Optics infringement assertion (moderate-to-high risk per FTO). Potential Meridian Credit Facility Section 5.15 covenant default. Loss of ~$12.2M in portfolio value attributed to pending family.Complete and file draft OA response (Christy Bauer to finalize; Catherine Bloom partner review). Urgent budget authorization needed from OWS/Veltrano.
2B117/814,057USPTOApril 21, 2025Restriction Requirement response (4-month extension purchased Oct. 18, 2024)REDNo — 2 additional months purchasable (max extends to Jun. 21, 2025)2 months remaining (at additional fee)$4,500–$6,750ABANDONMENT of electrode fabrication process application. Loss of B2 divisional filing vehicle. Potential covenant default.Prepare restriction response with group election; file divisional B2 for non-elected groups. Client instruction needed on election.
3B3EP 23 741 682.3EPOMay 17, 2025Response to Extended European Search Report (EPO Rules 70a, 161, 162)YELLOWNo — EPO further processing may be availableFurther processing potentially available under EPC (at additional cost/risk)$15,000–$22,000Deemed withdrawal of European application under EPC rules. Loss of European electrode fabrication process patent protection.Coordinate with B&V (Dr. Matthias Vogt) to prepare EESR response. C&H to draft substantive amendments/arguments; B&V to file.
4A4PCT/US2023/010584WIPO (national phases)July 9, 202530-month national phase entry deadline (additional jurisdictions beyond EP/JP already entered)YELLOWYes — statutory; no extensionsNone~$3,000–$8,000 per additional jurisdictionPermanent forfeiture of patent rights in all unselected jurisdictions (e.g., South Korea, China, etc.).Client to identify desired additional national phase jurisdictions (if any). If none desired beyond EP (B3) and JP (B4) already entered, no action needed.
5A5PCT/US2023/010612WIPO (national phases)July 9, 202530-month national phase entry deadline (additional jurisdictions beyond EP/JP already entered)YELLOWYes — statutory; no extensionsNone~$3,000–$8,000 per additional jurisdictionPermanent forfeiture of patent rights in all unselected jurisdictions.Same as A4 — client instruction needed on additional jurisdictions. If none desired beyond EP (C2) and JP (C3) already entered, no action needed.
6B4JP 2024-542197JPOJanuary 9, 2026Examination request deadline (3 years from PCT international filing date)GREENYes — statutory; no extensionsNoneJPO exam request fee ~¥150,000 + N&T fees ~¥200,000–¥350,000Application deemed withdrawn at JPO. Loss of Japanese electrode fabrication process protection.File examination request through Nakashima & Togawa. Hold notice currently in place (sent Sep. 20, 2023); lift hold and instruct N&T when budget permits.
7C3JP 2024-542305JPOJanuary 9, 2026Examination request deadline (3 years from PCT international filing date)GREENYes — statutory; no extensionsNoneJPO exam request fee ~¥150,000 + N&T fees ~¥200,000–¥350,000Application deemed withdrawn at JPO. Loss of Japanese packaging/thermal protection.File examination request through Nakashima & Togawa. Same hold status as B4.

[sheet: Named Inventors]

Inventor NameTitleAffiliationEducationApplications Named On
Dr. Rajan MenonCEOOptiwave Semiconductor Corp.Ph.D. Electrical Engineering, UC BerkeleyA1, A2, A3, A4, A5, B1, B2, B3, B4, C1, C2, C3
Dr. Lena StricklandVP EngineeringOptiwave Semiconductor Corp.Ph.D. Photonics, MITA1, A2, A3, A4, A5, B1, B2, B3, B4, C1, C2, C3
Dr. Feng-Yi ChenPrincipal EngineerOptiwave Semiconductor Corp.Ph.D. Materials Science, StanfordA1, A2, A3, A4, A5, B1, B2, B3, B4, C1, C2, C3
Dr. Arjun DasguptaSenior Design EngineerOptiwave Semiconductor Corp.Ph.D. Electrical Engineering, Georgia TechA1, A2, A3, A4, A5, B1, B2, B3, B4, C1, C2, C3

[sheet: Budget & Financials]

ItemAmount / ValueNotes
C&H Partner Rate (standard)$895/hrCatherine Bloom, Alan Ngo
C&H Partner Rate (Discounted, 10% volume discount)$805.50/hrPer engagement letter dated Feb. 10, 2022
C&H Senior Associate Rate (standard)$625/hrChristy Bauer
C&H Senior Associate Rate (Discounted)$562.50/hr10% volume discount
C&H Associate Rate (standard)$475/hrPeter Vassiliev
C&H Associate Rate (Discounted)$427.50/hr10% volume discount
Pre-Freeze Avg. Quarterly C&H Spend$87,400/quarterAverage of 4 quarters preceding Aug. 11, 2023 freeze
Project Lighthouse Quarterly IP Spend Cap$25,000/quarterImposed by Harborview Partners effective Aug. 11, 2023; applies to all outside counsel discretionary IP spend
Quarterly Spend Overage vs. Cap$62,400=$87,400 – $25,000
C&H Outstanding Unbilled WIP$34,218.50As of dormancy
C&H Unpaid Invoices$22,740.00Invoice Nos. 2023-07-04187 and 2023-08-04187
C&H Total Outstanding (WIP + A/R)$56,958.50=$34,218.50 + $22,740.00
Extension Fee Paid — A1 (2-month, Sep. 6, 2023)$640Small entity rate; last billable activity
Extension Fee Paid — B1 (4-month, Oct. 18, 2024)$2,560Small entity rate; emergency authorization from Sandra Koh
Est. Cost — A1 OA Response$22,000–$30,00040–55 hrs × blended rate + USPTO fees (~$2,000 if RCE needed)
Est. Cost — B1 Restriction Response$4,500–$6,7508–12 hrs × blended rate; $0 USPTO fee for restriction response
Est. Cost — B3 EESR Response (total)$15,000–$22,000C&H fees ($11,250–$16,875) + B&V fees (€3,500–€5,000) + EPO fees (~€580)
Est. Full Docket Reactivation — Attorney Fees$185,000–$245,000Through mid-2026
Est. Full Docket Reactivation — Govt/Foreign Assoc. Fees$35,000–$50,000Through mid-2026
Est. Full Docket Reactivation — TOTAL$220,000–$295,000Attorney fees + govt/foreign associate fees through mid-2026
Graystone Portfolio Valuation — Total (Apr. 28, 2023)$38.5MGraystone Valuation Advisors, LLC (Rebecca Thornton, lead partner)
Graystone — Issued Patents Value$26.3M31 issued U.S. utility patents
Graystone — Pending Application Family Value$12.2M12 pending applications (~31.7% of total portfolio value)
Meridian Revolving Credit Facility — Total Size$55MSenior secured; IP collateral pledge; Section 5.15 IP covenant
Meridian Facility — Amount Drawn (Dec. 31, 2024)$32.5M$22.5M undrawn capacity
OWS FY 2022 Revenue$68.1M
OWS FY 2023 Revenue$47.3MDown $20.8M (–30.5%) YoY; triggered sector downturn and budget freeze