[sheet: Cover & Summary]

FieldValue
Document TitleITC Claim Support Schedules and Workpapers — Solstice Portfolio
Prepared ByRobert Jansen, Associate, Tax — Calderwood & Harkness LLP
Reviewed ByLeila Nazari, Associate, Tax — Calderwood & Harkness LLP
Supervising PartnerLeonard Cross, Partner, Tax — Calderwood & Harkness LLP
Billing PartnerSylvia Hartwell, Partner, Tax — Calderwood & Harkness LLP
C&H Matter No.1015-00005
C&H Billing No.78204-001
ClientCalloway-Briggs Renewables Inc. (EIN: 84-3291076)
Partnership VehicleSolstice Holdings, LLC (EIN: 88-4071523)
Managing MemberCBR Solstice Manager, LLC (EIN: 88-4071597)
Tax-Equity InvestorRidgeline Capital Partners, LLC (EIN: 13-4827651)
Transferable Credit BuyerPinehurst Insurance Group, Inc. (EIN: 06-1938274)
Independent Tax Advisor / AppraiserGreystone Worthington, LLC
CBR Accounting FirmLarchmont & Associates, PLLC
EPC ContractorVasquez Brothers Construction, Inc. (EIN: 75-2648103)
Number of Projects7
Total Portfolio Capacity420 MW(dc)
Aggregate Eligible Basis (EPC Cost)$384,600,000
Applicable ITC Rate40% (30% base + 10% domestic content)
Total ITCs Generated$153,840,000
ITCs Allocated to Partnership (Ridgeline)$89,040,000
ITCs Transferred Under § 6418$64,800,000
— Sold to Pinehurst$60,000,000
— Retained by CBR$4,800,000
5-Year MACRS Depreciable Basis (Post-ITC Reduction)$307,680,000
Signing DateSeptember 21, 2023
Closing DateDecember 8, 2023
Date PreparedDecember 6, 2023
VersionFinal — Closing Set

[sheet: Project Detail — Eligible Basis]

Project #Project NameEntity NameStateCountyCapacity MW(dc)EPC ContractorEPC Contract Cost ($)Adjustments ($)Total Eligible Basis ($)Placed-in-Service DateCOD ConfirmedPrevailing Wage Compliance CertifiedApprenticeship Compliance CertifiedPPA OfftakerPPA Term (years)PPA Price ($/MWh)PPA Escalator (%/yr)
1Pecos SunPecos Sun Solar, LLCTXReeves85Vasquez Brothers Construction, Inc.78,200,000078,200,0002023-10-15YesYesYesLone Star Grid Solutions, LLC1532.501.5%
2Red MesaRed Mesa Solar, LLCTXPecos70Vasquez Brothers Construction, Inc.63,700,000063,700,0002023-10-28YesYesYesLone Star Grid Solutions, LLC1532.501.5%
3Coyote FlatsCoyote Flats Solar, LLCTXWard65Vasquez Brothers Construction, Inc.59,100,000059,100,0002023-11-05YesYesYesLone Star Grid Solutions, LLC1532.501.5%
4Llano VerdeLlano Verde Solar, LLCTXHudspeth55Vasquez Brothers Construction, Inc.50,400,000050,400,0002023-11-12YesYesYesLone Star Grid Solutions, LLC1532.501.5%
5CimarronCimarron Solar, LLCNMLea50Vasquez Brothers Construction, Inc.45,800,000045,800,0002023-09-30YesYesYesEnchantment Power Cooperative2029.752.0%
6Sandoval RidgeSandoval Ridge Solar, LLCNMSandoval50Vasquez Brothers Construction, Inc.46,100,000046,100,0002023-10-20YesYesYesEnchantment Power Cooperative2029.752.0%
7AmistadAmistad Solar, LLCTXVal Verde45Vasquez Brothers Construction, Inc.41,300,000041,300,0002023-11-18YesYesYesLone Star Grid Solutions, LLC1532.501.5%
TOTAL420384,600,0000384,600,000

[sheet: ITC Rate Analysis]

ComponentRate / QualificationNotes
Statutory Base ITC Rate (§ 48(a))6%Default rate for energy property placed in service after 2022
Prevailing Wage Requirement Met?YesAll 7 projects — VBC certified compliance per Master EPC Agreement; certifications on file with Larchmont & Associates
Apprenticeship Requirement Met?YesAll 7 projects — VBC certified compliance; apprenticeship hours documented
Increased Credit Rate Multiplier5×Prevailing wage + apprenticeship requirements satisfied → 6% × 5 = 30%
Base ITC Rate (After Multiplier)30%6% × 5 = 30%
Domestic Content Bonus Adder (§ 48(a)(12))10%Projects qualify — steel, iron, and manufactured products meet domestic content thresholds per Greystone Worthington analysis
Energy Community Bonus Adder (§ 48(a)(14))0%Projects do not qualify for energy community adder
Low-Income Community Bonus Adder0%Not applicable — utility-scale projects
TOTAL APPLICABLE ITC RATE40%30% base + 10% domestic content + 0% energy community = 40%

[sheet: ITC Calculation by Project]

Project #Project NameEntity NameEligible Basis ($)ITC Rate (%)Total ITC Generated ($)Placed-in-Service DateTax Year
1Pecos SunPecos Sun Solar, LLC78,200,00040%31,280,0002023-10-152023
2Red MesaRed Mesa Solar, LLC63,700,00040%25,480,0002023-10-282023
3Coyote FlatsCoyote Flats Solar, LLC59,100,00040%23,640,0002023-11-052023
4Llano VerdeLlano Verde Solar, LLC50,400,00040%20,160,0002023-11-122023
5CimarronCimarron Solar, LLC45,800,00040%18,320,0002023-09-302023
6Sandoval RidgeSandoval Ridge Solar, LLC46,100,00040%18,440,0002023-10-202023
7AmistadAmistad Solar, LLC41,300,00040%16,520,0002023-11-182023
TOTAL384,600,00040%153,840,000

[sheet: ITC Allocation — Partnership vs]

Project #Project NameTotal ITC ($)ITCs Allocated to Partnership ($)ITCs Transferred Under § 6418 — Total ($)§ 6418 — Sold to Pinehurst ($)§ 6418 — Retained by CBR ($)
1Pecos Sun31,280,00018,130,66713,149,33312,173,333976,000
2Red Mesa25,480,00014,770,66710,709,3339,917,333792,000
3Coyote Flats23,640,00013,704,0009,936,0009,200,000736,000
4Llano Verde20,160,00011,686,4008,473,6007,848,000625,600
5Cimarron18,320,00010,619,7337,700,2677,130,667569,600
6Sandoval Ridge18,440,00010,689,2677,750,7337,177,333573,400
7Amistad16,520,0009,579,2676,940,7336,427,333513,400
TOTAL153,840,00089,040,00064,800,00060,000,0004,800,000

[sheet: Partnership ITC Allocation Deta]

Allocation ItemTotal Partnership ITCs ($)Ridgeline (99%) ($)CBR Manager (1%) ($)Notes
Partnership-Allocated ITCs — Pre-Flip89,040,00088,149,600890,400Per LLCA § [X]; 99%/1% tax allocation
Post-Flip ITC Allocation (if any)000All ITCs placed in service in Year 1; no post-flip ITCs expected
TOTAL89,040,00088,149,600890,400