[sheet: Overview]
Field | Value
Document Title | Regulatory and Permitting Compliance Checklist — Solstice Portfolio
Matter No. | 1015-00005
Billing No. | 78204-001
Client | Calloway-Briggs Renewables Inc.
Prepared By | Derek Saunders, Sr. Associate, RE/Project Dev. & Robert Jansen, Associate, Tax — Calderwood & Harkness LLP
Date Prepared | December 5, 2023
Last Updated | December 8, 2023 (Closing Date)
Portfolio | Solstice Portfolio — 7 utility-scale solar PV projects, 420 MW(dc) aggregate
Partnership Vehicle | Solstice Holdings, LLC (EIN: 88-4071523)
Managing Member | CBR Solstice Manager, LLC (EIN: 88-4071597)
Tax-Equity Investor | Ridgeline Capital Partners, LLC
Transferable Credit Buyer | Pinehurst Insurance Group, Inc.
Construction Lender | Osprey National Bank, N.A.
EPC Contractor | Vasquez Brothers Construction, Inc.
Independent Engineer | Meridian Technical Advisors, LLC
Texas Offtaker | Lone Star Grid Solutions, LLC
New Mexico Offtaker | Enchantment Power Cooperative
Total Projects | 7
Total Capacity | 420 MW(dc)
States | Texas (5 projects), New Mexico (2 projects)
Signing Date | September 21, 2023
Closing Date | December 8, 2023
[sheet: Project Summary]
Project # | Project Name | Project Entity | Capacity MW(dc) | State | County | Target COD | Actual COD | EPC Cost $M | EPC Contractor | Offtaker | PPA Term | Interconnection Authority
1 | Pecos Sun | Pecos Sun Solar, LLC | 85 | Texas | Reeves | 2023-10-15 | 2023-10-15 | 78.2 | Vasquez Brothers Construction, Inc. | Lone Star Grid Solutions, LLC | 15 years | ERCOT
2 | Red Mesa | Red Mesa Solar, LLC | 70 | Texas | Pecos | 2023-10-28 | 2023-10-28 | 63.7 | Vasquez Brothers Construction, Inc. | Lone Star Grid Solutions, LLC | 15 years | ERCOT
3 | Coyote Flats | Coyote Flats Solar, LLC | 65 | Texas | Ward | 2023-11-05 | 2023-11-05 | 59.1 | Vasquez Brothers Construction, Inc. | Lone Star Grid Solutions, LLC | 15 years | ERCOT
4 | Llano Verde | Llano Verde Solar, LLC | 55 | Texas | Hudspeth | 2023-11-12 | 2023-11-12 | 50.4 | Vasquez Brothers Construction, Inc. | Lone Star Grid Solutions, LLC | 15 years | ERCOT
5 | Cimarron | Cimarron Solar, LLC | 50 | New Mexico | Lea | 2023-09-30 | 2023-09-30 | 45.8 | Vasquez Brothers Construction, Inc. | Enchantment Power Cooperative | 20 years | Northgate Corporation/WECC
6 | Sandoval Ridge | Sandoval Ridge Solar, LLC | 50 | New Mexico | Sandoval | 2023-10-20 | 2023-10-20 | 46.1 | Vasquez Brothers Construction, Inc. | Enchantment Power Cooperative | 20 years | Northgate Corporation/WECC
7 | Amistad | Amistad Solar, LLC | 45 | Texas | Val Verde | 2023-11-18 | 2023-11-18 | 41.3 | Vasquez Brothers Construction, Inc. | Lone Star Grid Solutions, LLC | 15 years | ERCOT
TOTAL | 420 | 384.6
[sheet: Interconnection Agreements]
Item # | Project Name | Project Entity | State | County | MW(dc) | Interconnecting Utility / Grid Operator | Permit/Agreement Type | Agreement / Reference No. | Date Executed | Interconnection Study Completed | Facilities Study Completed | Interconnection Agreement Effective Date | Point of Interconnection | Voltage (kV) | Network Upgrades Required | Network Upgrade Cost Responsibility | Grid Confirmation / Permission to Operate Date | Status | Expiration / Termination Date | Notes
1 | Pecos Sun | Pecos Sun Solar, LLC | TX | Reeves | 85 | ERCOT | Standard Generation Interconnection Agreement (SGIA) | ERCOT-SGIA-2022-0478 | 2022-11-15 | 2022-06-20 | 2022-09-12 | 2022-11-15 | Pecos Substation 345kV Bus | 345 kV | Substation bay extension — completed | Developer (VBC) | 2023-10-12 | Obtained | Co-terminus with PPA | Grid confirmation received 3 days prior to COD
2 | Red Mesa | Red Mesa Solar, LLC | TX | Pecos | 70 | ERCOT | Standard Generation Interconnection Agreement (SGIA) | ERCOT-SGIA-2022-0512 | 2022-12-08 | 2022-07-15 | 2022-10-03 | 2022-12-08 | Fort Stockton Switching Station 138kV | 138 kV | Line tap and metering — completed | Developer (VBC) | 2023-10-25 | Obtained | Co-terminus with PPA
3 | Coyote Flats | Coyote Flats Solar, LLC | TX | Ward | 65 | ERCOT | Standard Generation Interconnection Agreement (SGIA) | ERCOT-SGIA-2022-0534 | 2023-01-18 | 2022-08-10 | 2022-11-22 | 2023-01-18 | Ward County 138kV Substation | 138 kV | Transformer upgrade — completed | Shared (50/50 Developer/Utility) | 2023-11-02 | Obtained | Co-terminus with PPA
4 | Llano Verde | Llano Verde Solar, LLC | TX | Hudspeth | 55 | ERCOT | Standard Generation Interconnection Agreement (SGIA) | ERCOT-SGIA-2023-0087 | 2023-02-22 | 2022-09-28 | 2023-01-05 | 2023-02-22 | Sierra Blanca 345kV Substation | 345 kV | None required | N/A | 2023-11-09 | Obtained | Co-terminus with PPA
5 | Cimarron | Cimarron Solar, LLC | NM | Lea | 50 | Northgate Corporation / WECC | Large Generator Interconnection Agreement (LGIA) | Northgate Corporation-LGIA-2022-0193 | 2022-10-05 | 2022-04-18 | 2022-08-07 | 2022-10-05 | Jal Substation 115kV | 115 kV | Relay upgrades — completed | Developer (VBC) | 2023-09-27 | Obtained | Co-terminus with PPA | First project to achieve COD (Sept 30, 2023)
6 | Sandoval Ridge | Sandoval Ridge Solar, LLC | NM | Sandoval | 50 | Northgate Corporation / WECC | Large Generator Interconnection Agreement (LGIA) | Northgate Corporation-LGIA-2022-0217 | 2022-11-20 | 2022-05-30 | 2022-09-15 | 2022-11-20 | Rio Rancho 115kV Substation | 115 kV | Capacitor bank addition — completed | Developer (VBC) | 2023-10-17 | Obtained | Co-terminus with PPA
7 | Amistad | Amistad Solar, LLC | TX | Val Verde | 45 | ERCOT | Standard Generation Interconnection Agreement (SGIA) | ERCOT-SGIA-2023-0112 | 2023-03-10 | 2022-10-15 | 2023-01-28 | 2023-03-10 | Del Rio 138kV Substation | 138 kV | Breaker replacement — completed | Developer (VBC) | 2023-12-05 | Obtained | Co-terminus with PPA | Final grid confirmation delayed; COD Nov 18, 2023 but ERCOT permission to operate not received until Dec 5, 2023. Caused 8-day closing delay from Nov 30 to Dec 8, 2023.
[sheet: Environmental Permits]
Item # | Project Name | Project Entity | State | County | Permit / Approval Type | Issuing Authority | Reference / Permit No. | Application Date | Issuance Date | Expiration Date | Status | Conditions / Notes
1 | Pecos Sun | Pecos Sun Solar, LLC | TX | Reeves | NEPA Categorical Exclusion (CatEx) | U.S. Department of Energy / Bureau of Land Management | DOE-CX-2022-0891 | 2022-03-10 | 2022-05-22 | N/A | Obtained | No further environmental review required; no federal nexus beyond interconnection
2 | Pecos Sun | Pecos Sun Solar, LLC | TX | Reeves | Texas Pollutant Discharge Elimination System (TPDES) — Construction Stormwater General Permit | Texas Commission on Environmental Quality (TCEQ) | TXR150000-2022-PCS-4412 | 2022-04-01 | 2022-04-28 | 2027-04-28 | Obtained | SWPPP prepared and on file at project site
3 | Pecos Sun | Pecos Sun Solar, LLC | TX | Reeves | Biological Survey / Threatened & Endangered Species Consultation | U.S. Fish & Wildlife Service | USFWS-TX-2022-1287 | 2022-02-15 | 2022-06-10 | N/A | Obtained | No listed species habitat identified; concurrence letter received
4 | Pecos Sun | Pecos Sun Solar, LLC | TX | Reeves | Cultural Resources / Section 106 Review | Texas Historical Commission / State Historic Preservation Office | THC-106-2022-0654 | 2022-02-20 | 2022-07-15 | N/A | Obtained | Phase I survey complete; no significant cultural resources identified
5 | Pecos Sun | Pecos Sun Solar, LLC | TX | Reeves | Air Quality — Standard Exemption (Construction Equipment) | Texas Commission on Environmental Quality (TCEQ) | TCEQ-AQ-SE-2022-0891 | 2022-03-20 | 2022-04-15 | N/A | Obtained | Standard exemption for temporary construction equipment emissions
6 | Red Mesa | Red Mesa Solar, LLC | TX | Pecos | NEPA Categorical Exclusion (CatEx) | U.S. Department of Energy / Bureau of Land Management | DOE-CX-2022-0923 | 2022-03-25 | 2022-06-01 | N/A | Obtained | No federal nexus beyond interconnection
7 | Red Mesa | Red Mesa Solar, LLC | TX | Pecos | Texas Pollutant Discharge Elimination System (TPDES) — Construction Stormwater General Permit | Texas Commission on Environmental Quality (TCEQ) | TXR150000-2022-RDM-4478 | 2022-04-15 | 2022-05-12 | 2027-05-12 | Obtained | SWPPP on file
8 | Red Mesa | Red Mesa Solar, LLC | TX | Pecos | Biological Survey / Threatened & Endangered Species Consultation | U.S. Fish & Wildlife Service | USFWS-TX-2022-1315 | 2022-03-01 | 2022-06-28 | N/A | Obtained | No listed species habitat identified; concurrence letter received
9 | Red Mesa | Red Mesa Solar, LLC | TX | Pecos | Cultural Resources / Section 106 Review | Texas Historical Commission / State Historic Preservation Office | THC-106-2022-0698 | 2022-03-05 | 2022-07-28 | N/A | Obtained | Phase I survey complete; no significant cultural resources identified
10 | Red Mesa | Red Mesa Solar, LLC | TX | Pecos | Air Quality — Standard Exemption (Construction Equipment) | Texas Commission on Environmental Quality (TCEQ) | TCEQ-AQ-SE-2022-0934 | 2022-04-01 | 2022-04-28 | N/A | Obtained | Standard exemption
11 | Coyote Flats | Coyote Flats Solar, LLC | TX | Ward | NEPA Categorical Exclusion (CatEx) | U.S. Department of Energy / Bureau of Land Management | DOE-CX-2022-0958 | 2022-04-02 | 2022-06-15 | N/A | Obtained
12 | Coyote Flats | Coyote Flats Solar, LLC | TX | Ward | Texas Pollutant Discharge Elimination System (TPDES) — Construction Stormwater General Permit | Texas Commission on Environmental Quality (TCEQ) | TXR150000-2022-CFT-4501 | 2022-04-20 | 2022-05-18 | 2027-05-18 | Obtained | SWPPP on file
13 | Coyote Flats | Coyote Flats Solar, LLC | TX | Ward | Biological Survey / Threatened & Endangered Species Consultation | U.S. Fish & Wildlife Service | USFWS-TX-2022-1348 | 2022-03-10 | 2022-07-05 | N/A | Obtained | No listed species habitat identified
14 | Coyote Flats | Coyote Flats Solar, LLC | TX | Ward | Cultural Resources / Section 106 Review | Texas Historical Commission / State Historic Preservation Office | THC-106-2022-0721 | 2022-03-15 | 2022-08-02 | N/A | Obtained | Phase I survey complete; no significant findings
15 | Coyote Flats | Coyote Flats Solar, LLC | TX | Ward | Air Quality — Standard Exemption (Construction Equipment) | Texas Commission on Environmental Quality (TCEQ) | TCEQ-AQ-SE-2022-0967 | 2022-04-12 | 2022-05-08 | N/A | Obtained | Standard exemption
16 | Llano Verde | Llano Verde Solar, LLC | TX | Hudspeth | NEPA Categorical Exclusion (CatEx) | U.S. Department of Energy / Bureau of Land Management | DOE-CX-2022-0991 | 2022-04-18 | 2022-07-01 | N/A | Obtained
17 | Llano Verde | Llano Verde Solar, LLC | TX | Hudspeth | Texas Pollutant Discharge Elimination System (TPDES) — Construction Stormwater General Permit | Texas Commission on Environmental Quality (TCEQ) | TXR150000-2022-LLV-4523 | 2022-05-01 | 2022-05-30 | 2027-05-30 | Obtained | SWPPP on file
18 | Llano Verde | Llano Verde Solar, LLC | TX | Hudspeth | Biological Survey / Threatened & Endangered Species Consultation | U.S. Fish & Wildlife Service | USFWS-TX-2022-1392 | 2022-03-22 | 2022-07-18 | N/A | Obtained | No listed species habitat identified
19 | Llano Verde | Llano Verde Solar, LLC | TX | Hudspeth | Cultural Resources / Section 106 Review | Texas Historical Commission / State Historic Preservation Office | THC-106-2022-0756 | 2022-03-28 | 2022-08-15 | N/A | Obtained | Phase I survey complete; no significant findings
20 | Llano Verde | Llano Verde Solar, LLC | TX | Hudspeth | Air Quality — Standard Exemption (Construction Equipment) | Texas Commission on Environmental Quality (TCEQ) | TCEQ-AQ-SE-2022-1004 | 2022-04-25 | 2022-05-20 | N/A | Obtained | Standard exemption
21 | Cimarron | Cimarron Solar, LLC | NM | Lea | NEPA Categorical Exclusion (CatEx) | Bureau of Land Management — New Mexico | BLM-NM-CX-2022-0334 | 2022-01-20 | 2022-03-28 | N/A | Obtained | Private land; limited federal nexus
22 | Cimarron | Cimarron Solar, LLC | NM | Lea | NM Environment Department — Construction Stormwater General Permit | New Mexico Environment Department (NMED) | NMED-CGP-2022-LEA-0078 | 2022-02-10 | 2022-03-15 | 2027-03-15 | Obtained | SWPPP on file
23 | Cimarron | Cimarron Solar, LLC | NM | Lea | Biological Assessment / ESA Section 7 Consultation | U.S. Fish & Wildlife Service | USFWS-NM-2022-0412 | 2022-01-25 | 2022-05-05 | N/A | Obtained | Lesser prairie-chicken habitat assessed; no adverse effect determination
24 | Cimarron | Cimarron Solar, LLC | NM | Lea | Cultural Resources / Section 106 Review | New Mexico Historic Preservation Division / State Historic Preservation Office | NMHPD-106-2022-0287 | 2022-02-01 | 2022-06-15 | N/A | Obtained | Phase I survey complete; no significant cultural resources
25 | Cimarron | Cimarron Solar, LLC | NM | Lea | Air Quality — Construction Permit Registration | New Mexico Environment Department (NMED) — Air Quality Bureau | NMED-AQ-2022-LEA-0156 | 2022-02-15 | 2022-03-20 | N/A | Obtained | Registration for temporary construction equipment
26 | Cimarron | Cimarron Solar, LLC | NM | Lea | Groundwater Discharge Permit — Construction Dewatering | New Mexico Environment Department (NMED) — Ground Water Quality Bureau | NMED-GW-2022-LEA-0034 | 2022-02-20 | 2022-04-10 | 2027-04-10 | Obtained | Minor dewatering during foundation work; permit obtained as precaution
27 | Sandoval Ridge | Sandoval Ridge Solar, LLC | NM | Sandoval | NEPA Categorical Exclusion (CatEx) | Bureau of Land Management — New Mexico | BLM-NM-CX-2022-0378 | 2022-02-15 | 2022-04-22 | N/A | Obtained | Private land; limited federal nexus
28 | Sandoval Ridge | Sandoval Ridge Solar, LLC | NM | Sandoval | NM Environment Department — Construction Stormwater General Permit | New Mexico Environment Department (NMED) | NMED-CGP-2022-SAN-0091 | 2022-03-05 | 2022-04-10 | 2027-04-10 | Obtained | SWPPP on file
29 | Sandoval Ridge | Sandoval Ridge Solar, LLC | NM | Sandoval | Biological Assessment / ESA Section 7 Consultation | U.S. Fish & Wildlife Service | USFWS-NM-2022-0445 | 2022-02-20 | 2022-05-28 | N/A | Obtained | No listed species habitat identified; concurrence letter received
30 | Sandoval Ridge | Sandoval Ridge Solar, LLC | NM | Sandoval | Cultural Resources / Section 106 Review | New Mexico Historic Preservation Division / State Historic Preservation Office | NMHPD-106-2022-0312 | 2022-02-28 | 2022-07-02 | N/A | Obtained | Phase I survey complete; no significant findings
31 | Sandoval Ridge | Sandoval Ridge Solar, LLC | NM | Sandoval | Air Quality — Construction Permit Registration | New Mexico Environment Department (NMED) — Air Quality Bureau | NMED-AQ-2022-SAN-0178 | 2022-03-10 | 2022-04-15 | N/A | Obtained | Registration for temporary construction equipment
32 | Sandoval Ridge | Sandoval Ridge Solar, LLC | NM | Sandoval | Floodplain Development Permit | Sandoval County Floodplain Administrator | SC-FDP-2022-0045 | 2022-03-15 | 2022-05-10 | N/A | Obtained | Project site partially within 500-year floodplain; no-rise certification provided
33 | Amistad | Amistad Solar, LLC | TX | Val Verde | NEPA Categorical Exclusion (CatEx) | Bureau of Land Management — Texas | BLM-TX-CX-2022-0567 | 2022-04-10 | 2022-06-30 | N/A | Obtained
34 | Amistad | Amistad Solar, LLC | TX | Val Verde | Texas Pollutant Discharge Elimination System (TPDES) — Construction Stormwater General Permit | Texas Commission on Environmental Quality (TCEQ) | TXR150000-2022-AMS-4589 | 2022-05-15 | 2022-06-12 | 2027-06-12 | Obtained | SWPPP on file
35 | Amistad | Amistad Solar, LLC | TX | Val Verde | Biological Survey / Threatened & Endangered Species Consultation | U.S. Fish & Wildlife Service | USFWS-TX-2022-1428 | 2022-04-05 | 2022-08-01 | N/A | Obtained | Golden-cheeked warbler and black-capped vireo assessed; no adverse effect
36 | Amistad | Amistad Solar, LLC | TX | Val Verde | Cultural Resources / Section 106 Review | Texas Historical Commission / State Historic Preservation Office | THC-106-2022-0789 | 2022-04-12 | 2022-08-28 | N/A | Obtained | Phase I survey complete; no significant findings
37 | Amistad | Amistad Solar, LLC | TX | Val Verde | Air Quality — Standard Exemption (Construction Equipment) | Texas Commission on Environmental Quality (TCEQ) | TCEQ-AQ-SE-2022-1045 | 2022-05-05 | 2022-06-01 | N/A | Obtained | Standard exemption
[sheet: County Building Permits]
Item # | Project Name | Project Entity | State | County | Permit Type | Issuing Authority | Permit No. | Application Date | Issuance Date | Expiration / Completion Date | Status | Inspection Completed | Final Inspection Date | Notes
1 | Pecos Sun | Pecos Sun Solar, LLC | TX | Reeves | Commercial Building Permit — Solar Generation Facility | Reeves County Permits Office | RC-BP-2022-1134 | 2022-06-01 | 2022-07-15 | 2024-07-15 | Obtained | Yes | 2023-10-10 | Final inspection passed; Certificate of Occupancy issued
2 | Pecos Sun | Pecos Sun Solar, LLC | TX | Reeves | Electrical Permit — Utility-Scale Solar | Reeves County Permits Office | RC-EP-2022-1135 | 2022-06-01 | 2022-07-20 | 2024-07-20 | Obtained | Yes | 2023-10-10
3 | Red Mesa | Red Mesa Solar, LLC | TX | Pecos | Commercial Building Permit — Solar Generation Facility | Pecos County Building Department | PC-BP-2022-0873 | 2022-06-20 | 2022-08-05 | 2024-08-05 | Obtained | Yes | 2023-10-24
4 | Red Mesa | Red Mesa Solar, LLC | TX | Pecos | Electrical Permit — Utility-Scale Solar | Pecos County Building Department | PC-EP-2022-0874 | 2022-06-20 | 2022-08-10 | 2024-08-10 | Obtained | Yes | 2023-10-24
5 | Coyote Flats | Coyote Flats Solar, LLC | TX | Ward | Commercial Building Permit — Solar Generation Facility | Ward County Permits Office | WC-BP-2022-0561 | 2022-07-01 | 2022-08-15 | 2024-08-15 | Obtained | Yes | 2023-11-01
6 | Coyote Flats | Coyote Flats Solar, LLC | TX | Ward | Electrical Permit — Utility-Scale Solar | Ward County Permits Office | WC-EP-2022-0562 | 2022-07-01 | 2022-08-18 | 2024-08-18 | Obtained | Yes | 2023-11-01
7 | Coyote Flats | Coyote Flats Solar, LLC | TX | Ward | Grading / Land Disturbance Permit | Ward County Permits Office | WC-GP-2022-0563 | 2022-07-05 | 2022-08-20 | 2024-08-20 | Obtained | Yes | 2023-11-01 | Required due to drainage considerations on site
8 | Llano Verde | Llano Verde Solar, LLC | TX | Hudspeth | Commercial Building Permit — Solar Generation Facility | Hudspeth County Permits Office | HC-BP-2022-0234 | 2022-07-15 | 2022-08-28 | 2024-08-28 | Obtained | Yes | 2023-11-08
9 | Llano Verde | Llano Verde Solar, LLC | TX | Hudspeth | Electrical Permit — Utility-Scale Solar | Hudspeth County Permits Office | HC-EP-2022-0235 | 2022-07-15 | 2022-09-01 | 2024-09-01 | Obtained | Yes | 2023-11-08
10 | Cimarron | Cimarron Solar, LLC | NM | Lea | Commercial Building Permit — Solar Generation Facility | Lea County Planning & Zoning | LC-BP-2022-0456 | 2022-04-15 | 2022-05-28 | 2024-05-28 | Obtained | Yes | 2023-09-26 | First project to receive final inspection
11 | Cimarron | Cimarron Solar, LLC | NM | Lea | Electrical Permit — Utility-Scale Solar | Lea County Planning & Zoning | LC-EP-2022-0457 | 2022-04-15 | 2022-06-01 | 2024-06-01 | Obtained | Yes | 2023-09-26
12 | Sandoval Ridge | Sandoval Ridge Solar, LLC | NM | Sandoval | Commercial Building Permit — Solar Generation Facility | Sandoval County Building & Planning | SC-BP-2022-0712 | 2022-05-10 | 2022-06-22 | 2024-06-22 | Obtained | Yes | 2023-10-17
13 | Sandoval Ridge | Sandoval Ridge Solar, LLC | NM | Sandoval | Electrical Permit — Utility-Scale Solar | Sandoval County Building & Planning | SC-EP-2022-0713 | 2022-05-10 | 2022-06-28 | 2024-06-28 | Obtained | Yes | 2023-10-17
14 | Amistad | Amistad Solar, LLC | TX | Val Verde | Commercial Building Permit — Solar Generation Facility | Val Verde County Permits Office | VVC-BP-2022-0389 | 2022-07-12 | 2022-08-30 | 2024-08-30 | Obtained | Yes | 2023-11-15 | Final project for county inspection
15 | Amistad | Amistad Solar, LLC | TX | Val Verde | Electrical Permit — Utility-Scale Solar | Val Verde County Permits Office | VVC-EP-2022-0390 | 2022-07-12 | 2022-09-05 | 2024-09-05 | Obtained | Yes | 2023-11-15
16 | Amistad | Amistad Solar, LLC | TX | Val Verde | Grading / Land Disturbance Permit | Val Verde County Permits Office | VVC-GP-2022-0391 | 2022-07-18 | 2022-09-10 | 2024-09-10 | Obtained | Yes | 2023-11-15 | Required due to site topography near Amistad reservoir drainage area
[sheet: FAA Determinations]
Item # | Project Name | Project Entity | State | County | FAA Case / Aeronautical Study No. | Filing Type | Maximum Structure Height (ft AGL) | Nearest Airport / Airstrip | Distance to Airport (miles) | Application Date | Determination Date | Determination Type | Expiration Date | Status | Notes
1 | Pecos Sun | Pecos Sun Solar, LLC | TX | Reeves | 2022-ASW-12457-OE | Form 7460-1 (Notice of Proposed Construction) | 15 | Pecos Municipal Airport (PEQ) | 8.2 | 2022-03-15 | 2022-05-10 | Determination of No Hazard to Air Navigation | 2024-05-10 | Obtained | Standard no-hazard determination; no marking/lighting required
2 | Red Mesa | Red Mesa Solar, LLC | TX | Pecos | 2022-ASW-12891-OE | Form 7460-1 | 15 | Fort Stockton-Pecos County Airport (FST) | 11.5 | 2022-04-10 | 2022-06-15 | Determination of No Hazard to Air Navigation | 2024-06-15 | Obtained
3 | Coyote Flats | Coyote Flats Solar, LLC | TX | Ward | 2022-ASW-13204-OE | Form 7460-1 | 15 | Monahans-Wickett-Pyote Airport (MIF) | 6.8 | 2022-04-25 | 2022-07-01 | Determination of No Hazard to Air Navigation | 2024-07-01 | Obtained | Glare study requested and submitted; no adverse findings
4 | Llano Verde | Llano Verde Solar, LLC | TX | Hudspeth | 2022-ASW-13678-OE | Form 7460-1 | 15 | No public airport within 15 miles | 18 | 2022-05-15 | 2022-07-20 | Determination of No Hazard to Air Navigation | 2024-07-20 | Obtained
5 | Cimarron | Cimarron Solar, LLC | NM | Lea | 2022-ASW-11998-OE | Form 7460-1 | 15 | Lea County-Jal Airport (E26) | 5.4 | 2022-02-10 | 2022-04-15 | Determination of No Hazard to Air Navigation | 2024-04-15 | Obtained
6 | Sandoval Ridge | Sandoval Ridge Solar, LLC | NM | Sandoval | 2022-ASW-14102-OE | Form 7460-1 | 15 | Double Eagle II Airport (AEG) | 9.1 | 2022-05-28 | 2022-08-05 | Determination of No Hazard to Air Navigation | 2024-08-05 | Obtained
7 | Amistad | Amistad Solar, LLC | TX | Val Verde | 2022-ASW-14556-OE | Form 7460-1 | 15 | Del Rio-Laughlin AFB (DLF) | 12.3 | 2022-06-15 | 2022-08-28 | Determination of No Hazard to Air Navigation | 2024-08-28 | Obtained | Proximity to military airfield required supplemental review; no adverse finding
8 | Amistad | Amistad Solar, LLC | TX | Val Verde | 2022-ASW-14557-OE | Form 7460-1 (Supplemental — Southern Array) | 15 | Del Rio-Laughlin AFB (DLF) | 10.8 | 2022-06-20 | 2022-09-05 | Determination of No Hazard to Air Navigation | 2024-09-05 | Obtained | Supplemental filing for southern array section closer to Laughlin AFB approach corridor