PRIVILEGED AND CONFIDENTIAL — ATTORNEY-CLIENT PRIVILEGED / ATTORNEY WORK PRODUCT This memorandum is protected by the attorney-client privilege and the work product doctrine. It is intended solely for the use of the individuals identified below and should not be disclosed, distributed, or discussed with any person or entity outside of Calderwood & Harkness LLP without the prior written consent of the undersigned.

MEMORANDUM

To: Sylvia Hartwell, Responsible Partner; Leonard Cross, Billing Partner; Simone Laroche, Lead Associate

From: Harold Wren, Of Counsel (Communications & Regulatory Practice Group)

Date: January 15, 2024

Re: FCC File No. 0010287-EX — Regulatory Timeline and Risk of Dismissal for Failure to Prosecute

Matter No.: 1018-00009

Client: Northgate Telecommunications PLC / Northgate Wireless Americas Inc.

I. Executive Summary

The purpose of this memorandum is to assess the risk that the Federal Communications Commission's Wireless Telecommunications Bureau ("WTB") will dismiss FCC File No. 0010287-EX — the currently pending application for the assignment of fourteen (14) Meridian Technologies-3 (Band 66) wireless radio service licenses (call signs WQAB201 through WQAB214) from Ridgeline Wireless Holdings LLC ("Ridgeline") to Northgate Wireless Americas Inc. ("NWA") — for failure to prosecute. This memorandum also identifies the procedural options available to preserve the application, evaluates the consequences of dismissal, and recommends an immediate course of action.

The application has been effectively dormant since approximately February 2023, when the last substantive filing was made — specifically, a response to a WTB information request, filed on February 10, 2023. In the nearly eleven months since that filing, neither the applicant nor Ridgeline has submitted any additional materials, status updates, or requests to the Commission. No further action has been taken by the WTB itself: the application has neither been granted, denied, nor dismissed.

Informal indications from WTB staff — communicated through regulatory counsel at Broadfield Whitaker LLP — suggest that the application may be subject to dismissal for failure to prosecute if the underlying transaction is not reactivated by approximately the fourth quarter of 2023. That informal threshold has now passed without any affirmative step by either party to reactivate or advance the proceeding.

The dormancy of the FCC application is directly attributable to the stalling of the underlying commercial transaction. The Asset Purchase Agreement between NWA and Ridgeline is currently in a state of suspended performance, having been stalled by a purchase price dispute that arose in December 2022. The extended Long-Stop Date of September 30, 2023 — negotiated pursuant to an Extension Agreement executed in April 2023 — has passed without the transaction closing and, critically, without either party issuing a formal termination notice under the APA.

Based on the analysis set forth below, the dismissal risk is assessed as significant and growing. Immediate action is recommended to mitigate this risk. Specifically, the team should take one or more of the following steps on an expedited basis:

(a) File a unilateral status update letter with the WTB, informing the Bureau that the underlying transaction remains under active consideration and requesting that the application be maintained on the pending docket;

(b) Negotiate a joint stipulation for abeyance with Ridgeline's counsel at Hargrove, Sato & Caldwell LLP, requesting that the FCC hold the application in abeyance for a defined period pending resolution of the commercial dispute; or

(c) Determine whether voluntary withdrawal of the application is the preferred path, if the client has concluded that the transaction is unlikely to proceed.

The analysis supporting these recommendations, and the trade-offs associated with each option, are discussed in detail in Sections IV through VIII below.

II. Factual Background

A. The Transaction and FCC Application

Northgate Telecommunications PLC ("NTP"), a United Kingdom-headquartered public telecommunications and software/SaaS company listed on the London Stock Exchange (LSE: NGTL; Companies House No. 08473291; principal office at 14 Cavendish Square, London W1G 0BX), determined in mid-2022 to expand its wireless infrastructure footprint in the western United States through the acquisition of spectrum assets in the Meridian Technologies-3 band. To effect that acquisition, NTP engaged its wholly owned U.S. subsidiary, Northgate Wireless Americas Inc. ("NWA"), a Delaware corporation (Delaware Secretary of State, File No. 7284619), with its principal place of business at 2200 Wilson Boulevard, Suite 1450, Arlington, Virginia 22201. NWA was formed as a special-purpose entity to hold FCC wireless radio service licenses in the United States and serves as the designated U.S. licensee for purposes of FCC compliance.

On September 22, 2022, NWA entered into an Asset Purchase Agreement (the "APA") with Ridgeline Wireless Holdings LLC ("Ridgeline"), a Nevada limited liability company (Nevada Secretary of State, Entity No. E0428716302), with its principal office at 450 South Virginia Street, Suite 800, Reno, Nevada 89501. The APA provides for the acquisition by NWA of fourteen (14) FCC Wireless Radio Service licenses in the Meridian Technologies-3 band (Band 66), authorized under Part 27 of the FCC's Rules, 47 C.F.R. Part 27. The licenses cover Economic Areas in the states of Nevada, eastern California, and southern Oregon, comprising approximately 39 MHz of paired spectrum (78 MHz total paired bandwidth) and covering approximately 3.84 million Pops (population covered). The agreed purchase price under the APA is $126,500,000, representing a per-MHz-POP price of approximately $0.845.

The corporate ownership chain through which NTP's foreign ownership interest flows to NWA is as follows: NWA (Delaware corporation) is wholly owned by Northgate US Holdings LLC ("NUS Holdings"), a Delaware limited liability company, which is in turn wholly owned by NTP (England & Wales PLC, publicly traded on the London Stock Exchange). As of the date of the original FCC filing, the significant shareholders of NTP were: Thornhill Asset Management LLP (9.7%), Sovereign Capital Partners AG (6.3%), Dunmore Pension Trust (5.1%), with the remaining 78.9% held by the general public float.

Given the 100% indirect foreign ownership of NWA by NTP — a foreign entity — the transaction required FCC approval not only of the assignment of the licenses themselves, but also of the foreign ownership structure, pursuant to Section 310(b)(4) of the Communications Act of 1934, as amended, 47 U.S.C. § 310(b)(4).

B. FCC Application Filing and Processing History

The FCC application and associated filings progressed through several key milestones before entering the current period of dormancy. The following chronology sets forth the complete procedural history of FCC File No. 0010287-EX:

October 14, 2022: FCC Form 603 (Application for Assignment of Authorization) and a concurrent Section 310(b)(4) petition for declaratory ruling were filed with the FCC on behalf of NWA and Ridgeline. The application was assigned FCC File No. 0010287-EX. The Section 310(b)(4) petition sought FCC approval for up to 100% indirect foreign ownership of NWA by NTP through NUS Holdings LLC. The application was prepared by Broadfield Whitaker LLP (Annette Galvez and Daniel Fong, 1401 H Street NW, Suite 750, Washington, DC 20005), the firm retained as NWA's FCC regulatory counsel of record, and was reviewed by Calderwood & Harkness LLP (Harold Wren, 1875 K Street NW, Suite 600, Washington, DC 20006) in its capacity as transactional and regulatory coordinating counsel.

October 28, 2022: The application was accepted for filing by the FCC. Acceptance indicated that the application was facially complete and met the basic filing requirements for an assignment application under 47 C.F.R. § 1.948.

November 3, 2022: The FCC issued a public notice regarding the application, opening a thirty-day comment period for interested parties to file petitions to deny, informal objections, or other comments pursuant to 47 U.S.C. § 309(d) and 47 C.F.R. § 1.939.

November 28, 2022: An informal objection was filed by Great Basin Rural Broadband Cooperative ("Great Basin"), a Nevada cooperative providing broadband and telecommunications services in rural Nevada. The Great Basin objection alleged potential concerns regarding the foreign ownership of NWA under Section 310(b)(4) of the Communications Act, 47 U.S.C. § 310(b)(4), and questioned whether the proposed transaction would serve the public interest. The objection did not rise to the level of a formal petition to deny under Section 309(d), but was submitted as an informal objection under 47 C.F.R. § 1.41.

December 5, 2022: The thirty-day comment period closed. No formal petitions to deny were filed by any party. The Great Basin informal objection was the sole filing received during the comment period.

December 9, 2022: NWA, through Broadfield Whitaker LLP, filed an opposition to the Great Basin informal objection. The opposition argued that the Section 310(b)(4) petition adequately addressed all foreign-ownership concerns, noted the rebuttable presumption of compliance applicable to investments from World Trade Organization ("WTO") member countries — of which the United Kingdom is one — and argued that Great Basin had failed to identify any specific public interest harm arising from the proposed transaction.

January 19, 2023: The WTB issued an informal information request letter addressed to Broadfield Whitaker LLP, seeking additional information regarding NTP's corporate governance structure, shareholder register, and the mechanisms by which NTP exercises (or does not exercise) control over NWA's operations. The information request was consistent with standard WTB practice in processing Section 310(b)(4) petitions involving publicly traded foreign parent companies with dispersed ownership.

February 10, 2023: Broadfield Whitaker LLP, with input from Calderwood & Harkness LLP, filed a comprehensive response to the WTB's informal information request. The response provided detailed information regarding NTP's corporate governance, the roles and responsibilities of NUS Holdings LLC and NWA's board of directors, shareholder voting arrangements, and related matters.

This February 10, 2023 filing represents the last substantive filing in the docket of FCC File No. 0010287-EX. No further filings have been made by any party — including NWA, Ridgeline, or Great Basin — in the approximately eleven months since that date.

C. Committee for the Assessment of Foreign Participation Review

In addition to the WTB's substantive review of the FCC Form 603 and the Section 310(b)(4) petition, the application triggered a national security review by the Committee for the Assessment of Foreign Participation in the United States Telecommunications Services Sector (the "Committee"), established pursuant to Executive Order 13913 (April 4, 2020). The Committee, which succeeded the informal interagency review process formerly known as "Team Telecom," is responsible for reviewing applications involving foreign ownership of U.S. telecommunications assets for potential national security and law enforcement concerns.

A preliminary review conducted by the Committee as of approximately December 2022 identified no national security concerns associated with the proposed transaction or with NTP's ownership of NWA. However, formal clearance from the Committee has not yet been issued. It is our understanding that the Committee's review process has effectively paused, likely in response to the dormancy of the underlying transaction and the lack of activity in the FCC proceeding. The Committee typically coordinates its review timeline with the FCC and with the applicants, and extended inactivity in the FCC proceeding may signal to the Committee that the transaction is no longer being actively pursued by the parties. The absence of formal clearance remains a procedural prerequisite to FCC action on the application, and any reactivation of the application would likely require renewed engagement with the Committee.

D. The Purchase Price Dispute and APA Standstill

The dormancy of the FCC application is a direct consequence of a commercial dispute between the parties regarding the purchase price for the licenses. The key events are as follows:

December 14, 2022: Ridgeline notified NWA of a demand for an upward price adjustment of $14,200,000, seeking to increase the purchase price from $126,500,000 to $140,700,000. Ridgeline's demand was based on a purported post-signing revaluation of certain California licenses — specifically, those covering Economic Area Nos. 155 and 159 — citing an alleged competing bid from an unnamed third-party acquirer. Ridgeline contended that changed market conditions justified a renegotiation of the purchase price.

December 19, 2022: NWA, through Calderwood & Harkness, formally rejected the price adjustment demand, citing APA Section 3.1 (the fixed-price provision), which provides for a fixed aggregate purchase price with no contractual price-adjustment mechanism tied to post-signing market developments. The parties entered into what has been characterized as an informal "standstill," during which neither party has taken steps to consummate the transaction and neither has formally terminated the APA.

March 15, 2023: The original Long-Stop Date under the APA passed without the transaction closing. Under the terms of the APA, either party would have been entitled to terminate the agreement following the expiration of the Long-Stop Date, subject to certain conditions. Neither party exercised termination rights at that time.

April 22, 2023: The parties executed an Extension Agreement, extending the Long-Stop Date to September 30, 2023. The Extension Agreement was entered into without prejudice to either party's position on the purchase price dispute and expressly preserved both parties' rights and remedies under the APA.

September 30, 2023: The extended Long-Stop Date passed without the transaction closing. Once again, no termination notice was issued by either party. The APA appears to remain technically in effect, though in a state of suspended performance, with both parties having failed to meet their respective closing obligations and neither having taken the affirmative step of terminating the agreement.

November 8, 2023: The last substantive communication between the parties occurred on this date, in the form of a letter from Hargrove, Sato & Caldwell LLP (Kevin Sato, lead partner for Ridgeline) to Calderwood & Harkness LLP. The content of that letter addressed the status of the transaction and the parties' respective positions on the purchase price dispute but did not propose a resolution or demand termination.

As of the date of this memorandum, no formal termination of the APA has occurred. The agreement appears to be in a state of suspended performance, with neither party actively seeking to consummate the transaction and neither party having formally terminated the agreement. The analysis of APA termination rights and the implications of the passage of the Long-Stop Date is addressed in a separate memorandum being prepared by the Calderwood & Harkness transactional team.

E. Current Status of FCC Application

As of the date of this memorandum, the current status of FCC File No. 0010287-EX may be summarized as follows:

• The application has been dormant since approximately February 2023 — a period of nearly eleven (11) months.

• The FCC has not dismissed the application, nor has it issued any formal order or letter regarding the application's status since the January 19, 2023 information request.

• The FCC has not taken any affirmative action on the application — neither granting, denying, nor dismissing it.

• The Great Basin Rural Broadband Cooperative's informal objection, filed November 28, 2022, remains pending without FCC resolution.

• The Section 310(b)(4) petition for declaratory ruling remains pending.

• The Committee for the Assessment of Foreign Participation has not issued formal national security clearance.

• No further filings have been made by any party — NWA, Ridgeline, or Great Basin — since the February 10, 2023 response to the WTB information request.

In sum, the application is in a state of regulatory limbo: procedurally alive but substantively inactive, with no party or agency taking steps to advance or resolve it.

III. Legal Framework: FCC Dismissal for Failure to Prosecute

A. Applicable FCC Rules and Authority

The FCC's authority to dismiss applications for failure to prosecute is grounded in both its specific rules governing wireless radio service applications and its general administrative authority to manage its docket and proceedings.

47 C.F.R. § 1.934(a) provides that the FCC may dismiss applications that are defective, incomplete, or where the applicant has failed to provide requested information or to prosecute the application. This provision is broadly drafted and confers considerable discretion on the WTB to dismiss applications where the applicant has failed to take the steps necessary to advance the application toward a final determination. The regulation does not specify a fixed time period after which dismissal is automatic; rather, dismissal under this provision is a discretionary act based on the WTB's assessment of the circumstances.

47 C.F.R. § 1.934(d) provides that the Commission may dismiss applications without prejudice when the applicant requests voluntary withdrawal or fails to respond to official inquiries. The "without prejudice" standard is significant: it means that a dismissed application does not preclude the applicant from filing a new application for the same authorization at a later date, although a new application would be treated as a de novo filing and would need to comply with all current filing requirements.

Beyond these specific rules, the WTB's discretionary authority to manage its docket is well established. The Wireless Telecommunications Bureau has broad administrative discretion to dismiss applications that appear to be abandoned, where the underlying transaction has stalled, or where the applicant has failed to demonstrate continued interest in prosecuting the application to conclusion. This authority is inherent in the FCC's role as a licensing agency and is consistent with the general administrative principle that federal agencies may dismiss proceedings for want of prosecution when applicants fail to take the necessary steps to advance their applications within a reasonable period of time.

The WTB's docket management practices are not governed by any formal published schedule or "statute of limitations" for application dormancy. However, in practice, the Bureau monitors the status of pending applications and periodically undertakes docket-clearing exercises in which stale or abandoned applications are identified and subject to dismissal. Applications that have been inactive for twelve months or more are generally considered to be at heightened risk during such exercises.

B. FCC Precedent on Dormant Applications

Although specific precedents are not cited by name in this memorandum, a survey of FCC practice and publicly available WTB orders reveals a consistent pattern with respect to the treatment of dormant assignment and transfer applications:

Extended dormancy as a basis for dismissal. Applications left pending for extended periods — typically twelve months or more — without any applicant activity or communication to the Bureau have been dismissed for failure to prosecute. The WTB has treated extended inactivity as evidence that the applicant has effectively abandoned the application, particularly when the Bureau's own efforts to obtain information or status updates have gone unanswered.

"Come show cause" procedures. In a number of instances, the WTB has issued letters to applicants requiring them to "show cause" why a pending application should not be dismissed for failure to prosecute. These letters typically set a deadline — often thirty (30) days — for the applicant to respond and demonstrate that the underlying transaction remains viable and that the applicant intends to pursue the application to conclusion. Failure to respond to a "come show cause" letter almost invariably results in dismissal. It bears noting that the WTB is not required to issue such a letter before dismissing an application; it may do so as a matter of administrative courtesy, but dismissal without prior notice is within the Bureau's authority.

Abeyance as a limited remedy. Where both the assignor and the assignee have indicated that the underlying transaction is on hold — typically due to a commercial dispute, financing contingency, or other impediment — the WTB has in some instances agreed to hold applications in abeyance for limited periods, typically ninety (90) to one hundred eighty (180) days. However, the WTB has ultimately dismissed applications where no resolution of the underlying impediment is reached within the abeyance period, or where repeated requests for extension of the abeyance period suggest that the transaction is unlikely to close.

Dismissal without prejudice as the standard. Dismissal of dormant assignment applications is typically "without prejudice," meaning that the applicant retains the right to file a new application for the same authorization if the underlying transaction is later reactivated. However, a dismissal without prejudice does not preserve any of the processing progress achieved on the original application. A new application would require new filing fees, a new public notice, a new thirty-day comment period, and — in the case of applications involving foreign ownership — potentially a new Section 310(b)(4) petition and a new Committee for the Assessment of Foreign Participation review.

C. Informal Staff Indications

Calderwood & Harkness understands, based on informal communications between Broadfield Whitaker LLP (Annette Galvez) and WTB staff, that Bureau staff members assigned to the processing of FCC File No. 0010287-EX have indicated that the application may be subject to dismissal for failure to prosecute if the underlying transaction is not reactivated by approximately the fourth quarter of 2023. This indication was communicated informally and does not constitute an official FCC position or ruling; however, it is consistent with the WTB's general docket management practices described above and should be treated as a meaningful signal of the Bureau's posture.

The informal Q4 2023 deadline identified by WTB staff has now passed. As of the date of this memorandum, neither NWA nor Ridgeline has taken any step to reactivate the application or to communicate with the WTB regarding the status of the transaction or the proceeding.

It is important to note that the WTB has not yet issued a formal dismissal notice or a written "come show cause" inquiry. However, the absence of such action should not be interpreted as assurance that the application will remain on the docket indefinitely. The WTB's workload, staffing levels, and docket management priorities may result in periods of administrative lag between the identification of a dormant application and the issuance of a formal dismissal action. The FCC's docket management practices suggest that applications inactive for more than twelve months are at heightened risk of administrative dismissal, and FCC File No. 0010287-EX is approaching that threshold.

IV. Analysis: Current Dismissal Risk Assessment

A. Factors Increasing Dismissal Risk

The following factors weigh in favor of an elevated risk of dismissal for failure to prosecute:

1. Duration of dormancy. Approximately eleven (11) months have elapsed since the last filing in the docket (the February 10, 2023 response to the WTB information request). Moreover, approximately fourteen (14) months have elapsed since the application was accepted for filing (October 28, 2022). This period of inactivity significantly exceeds the timeframe in which the WTB would typically expect to see either applicant-initiated progress toward closing or affirmative communication regarding the status of the transaction. The duration of dormancy alone places the application squarely within the zone of heightened dismissal risk under the WTB's docket management practices.

2. Expiration of the APA Long-Stop Date. The extended Long-Stop Date of September 30, 2023 has passed without the transaction closing. Although the parties have not formally terminated the APA, the expiration of the Long-Stop Date may be interpreted by WTB staff as an indication that the underlying transaction has effectively lapsed. The WTB routinely reviews the commercial status of underlying transactions as part of its assessment of whether a pending application remains viable, and the passage of a contractual deadline for consummation without closing is a strong negative indicator.

3. No applicant-initiated status updates. Neither NWA nor Ridgeline has filed any status update, request for extension, or request for abeyance with the FCC since February 2023. The absence of any affirmative communication from either applicant party is likely to reinforce the WTB's impression that the application has been abandoned. Proactive communication with the Bureau — even informal communication through regulatory counsel — is an important signal of an applicant's continued interest in prosecuting an application, and the complete absence of such communication for nearly a year is a significant risk factor.

4. Informal WTB staff signals. As discussed in Section III.C above, WTB staff have already informally indicated concern about the application's viability and suggested an approximate Q4 2023 deadline for reactivation. While these indications are informal and do not bind the Bureau, they reflect the judgment of the staff members responsible for processing the application and should be accorded substantial weight in assessing dismissal risk.

5. Pending Committee for the Assessment of Foreign Participation review. The Committee's national security review appears to have paused, likely in response to the dormancy of the FCC proceeding and the underlying transaction. If the Committee's review is also stalled, this compounds the impression across the interagency review process that the application is abandoned. Restarting the Committee's review — whether in connection with the current application or a new filing — would require renewed engagement and potentially additional processing time.

6. Unresolved informal objection. The Great Basin Rural Broadband Cooperative's informal objection, filed November 28, 2022, remains pending without FCC resolution. While the objection is informal in nature and does not constitute a formal petition to deny, its continued pendency adds a layer of unresolved procedural complexity to the docket. The FCC has had no occasion to rule on the objection, and the combination of an unresolved objection and an inactive application may contribute to the WTB's inclination to clear the docket through dismissal.

B. Factors Mitigating Dismissal Risk

Certain factors weigh against an imminent dismissal, though their mitigating effect should not be overstated:

1. No formal dismissal action yet. The WTB has not issued a formal "come show cause" letter, dismissal notice, or any other written communication indicating an intent to dismiss the application. This suggests that the application remains in the WTB's queue and has not yet been flagged for imminent administrative action. However, as noted above, the absence of formal action may reflect administrative lag rather than an affirmative decision to maintain the application on the docket.

2. No petitions to deny. The comment period closed on December 5, 2022 without any formal petitions to deny being filed. The only filing was the Great Basin informal objection, to which NWA filed a timely and substantive response. The absence of formal petitions to deny is favorable to the application, as it means there is no contested proceeding requiring the WTB to adjudicate competing claims. In the FCC's processing framework, uncontested applications — even dormant ones — are generally subject to less intensive scrutiny than contested proceedings.

3. Substantive progress made. The application progressed through several significant milestones: acceptance for filing, public notice, completion of the comment period, the filing and response to the Great Basin informal objection, and a substantive WTB information request and response cycle. This processing history indicates that the application was substantially complete as of February 2023 and that the WTB had already invested significant staff resources in reviewing the application. This may weigh against dismissal to the extent the Bureau recognizes the sunk cost of its own review efforts, though this factor should not be overestimated.

4. No adverse national security findings. The preliminary Committee review identified no national security concerns associated with the proposed transaction. While formal clearance has not been issued, the absence of any adverse findings or indications of concern is a positive factor that may reduce the WTB's inclination to dismiss the application outright.

5. Dismissal without prejudice. Even if the application is dismissed, the dismissal would likely be without prejudice under 47 C.F.R. § 1.934(d), preserving the option to file a new application if the transaction is later reactivated. While this does not eliminate the consequences of dismissal — which are substantial, as discussed in Section V below — it does mean that dismissal would not permanently foreclose the transaction from a regulatory perspective.

C. Overall Risk Assessment

Weighing the factors identified above, the risk of dismissal is assessed as moderate to high and trending upward. The passage of the informal Q4 2023 deadline identified by WTB staff, combined with the extended period of dormancy (now approaching the twelve-month threshold) and the expiration of the APA's Long-Stop Date, creates a confluence of factors that significantly elevates the risk profile. The WTB could act to dismiss the application at any time, with or without prior notice, and the risk increases with each passing month of inactivity.

Particular attention should be paid to the possibility that the WTB may undertake a periodic docket-clearing exercise in the first or second quarter of 2024, during which stale and dormant applications are identified and subject to batch dismissal. Such exercises are a routine part of the WTB's docket management and are not typically preceded by individualized notice to applicants.

In summary, while the application has not yet been dismissed, and while there are factors that militate against immediate dismissal, the overall trajectory of risk is clearly unfavorable. Prompt action is warranted to preserve the application and the significant processing progress achieved to date.

V. Consequences of Dismissal

A. Regulatory Consequences

Dismissal of FCC File No. 0010287-EX would result in the loss of the pending application and all associated processing progress. The regulatory consequences would be significant and would include the following:

Loss of processing progress. All progress achieved on the current application — including acceptance for filing, completion of the public notice and comment period, disposition of the Great Basin informal objection, and the WTB's substantive information request and response cycle — would be forfeited. None of this processing history would carry over to a new application.

Requirement to file a new FCC Form 603. If the transaction is later reactivated, a new FCC Form 603 (Application for Assignment of Authorization) would need to be filed. The new application would be treated as a de novo filing and would need to comply with all current filing requirements as of the date of submission, including any changes to FCC rules, policies, or processing standards adopted since the original October 2022 filing.

New filing fees. New FCC filing fees would be required for the new application. The applicable fee schedule would be the schedule in effect at the time of refiling, which may differ from the fees paid in October 2022.

New public notice and comment period. A new public notice would be issued by the FCC, opening a new thirty-day comment period. This would provide an opportunity for Great Basin or other parties to file new petitions to deny or informal objections. There is no assurance that the comment period for a new application would be uneventful; changed circumstances or new market entrants could give rise to additional opposition.

New Section 310(b)(4) petition. A new Section 310(b)(4) petition for declaratory ruling would need to be filed, reflecting NTP's shareholder structure as of the new filing date. As discussed in Section VII.C below, changes in NTP's shareholder register since October 2022 would need to be identified, verified, and disclosed. Any new shareholders exceeding FCC reporting thresholds could trigger additional review.

New Committee for the Assessment of Foreign Participation review. A new filing would likely trigger a new national security review by the Committee. While the Committee's prior preliminary finding of no national security concerns is favorable, the Committee would not be bound by that preliminary assessment in connection with a new application, and the review process would effectively restart. The Committee's review timeline — which can extend from ninety (90) days to over a year in complex cases — would add materially to the overall regulatory approval timeline.

Timeline impact. The cumulative effect of these requirements is that a new application cycle could add six (6) to twelve (12) months or more to the regulatory approval timeline. This estimate accounts for application preparation, filing, acceptance, public notice, comment period, potential opposition, WTB review, Committee review, and final action by the FCC. In a contested proceeding, the timeline could be even longer.

B. Transactional and Strategic Consequences

Beyond the direct regulatory consequences, dismissal of the FCC application would carry significant transactional and strategic implications:

Weakened negotiating position. The loss of the FCC application would remove a key element of transactional momentum. The existence of a pending, substantially processed FCC application represents tangible progress toward consummation of the transaction and is a factor that weighs in NWA's favor in the ongoing purchase price dispute with Ridgeline. Dismissal could signal to Ridgeline that Northgate's commitment to the transaction has waned, potentially weakening Northgate's bargaining position and emboldening Ridgeline to press for more aggressive terms in any renewed negotiations.

Earnest money deposit risk. Ridgeline may interpret dismissal of the FCC application as evidence that NWA has abandoned the transaction. This interpretation, if accepted, could strengthen Ridgeline's position regarding the disposition of the $4,500,000 earnest money deposit currently held by Meridian National Bank, N.A. as escrow agent under the APA. If Ridgeline were to assert that NWA has abandoned the transaction, it might seek forfeiture of the earnest money deposit under the APA's provisions governing breach or abandonment. The analysis of earnest money deposit recovery and forfeiture risk is addressed in a separate memorandum.

Competitive risk. During any gap period between dismissal of the current application and the filing of a new application, competitors or other potential acquirers could approach Ridgeline with competing offers for the licenses. While Ridgeline's ability to enter into an alternative transaction would depend on the status of the APA and any surviving exclusivity obligations, the absence of a pending FCC application would eliminate one procedural barrier to a competing transaction.

C. Cost Consequences

Dismissal of the application and subsequent refiling would impose additional costs on the client:

Broadfield Whitaker LLP fees. Broadfield Whitaker's fees for the original application cycle total $318,750 to date. This amount covers the preparation and filing of the FCC Form 603, the Section 310(b)(4) petition, the opposition to the Great Basin informal objection, the response to the WTB information request, and related regulatory counsel services. Refiling would require additional legal fees for the preparation of a new application, a new Section 310(b)(4) petition, and any new opposition filings. While some of the substantive work from the original filing could be recycled, significant updating and re-drafting would be required.

Calderwood & Harkness LLP fees. Calderwood & Harkness fees billed through January 2024 total $847,320, against the Phase 1 fee cap of $1,250,000, representing 67.8% utilization. An additional $23,450 in work-in-progress charges is pending. The remaining fee cap headroom is therefore approximately $379,230. Additional regulatory work associated with preserving the current application — or, in the event of dismissal, preparing and coordinating a new application — would consume a portion of this remaining headroom. If the scope of additional regulatory work is substantial, renegotiation of the Phase 1 fee cap may be necessary.

FCC filing fees. New FCC filing fees would be required for any refiled application. The applicable fees are set by the FCC's fee schedule and would be determined based on the schedule in effect at the time of refiling.

Spectrum valuation update. An updated spectrum valuation report from Vantage Spectrum Consultants may be needed to support a new application. The original valuation report, dated September 12, 2022, was prepared at a cost of $175,000. Market conditions in the Meridian Technologies-3 band may have changed since that date, and an updated report would be necessary to support any purchase price analysis or FCC showings in connection with a new application.

VI. Procedural Options to Avoid or Mitigate Dismissal

The following procedural options are available to NWA to address the current dismissal risk. Each option is evaluated in terms of its advantages, disadvantages, timing, and likelihood of success.

A. Option 1: Unilateral Status Update Filing

Under this option, Broadfield Whitaker LLP, on behalf of NWA, would file a letter with the WTB providing a status update on FCC File No. 0010287-EX. The letter would inform the WTB that the underlying transaction remains under active consideration by the parties, that a commercial dispute has temporarily delayed closing, and that the applicant respectfully requests that the application be maintained on the pending docket while the parties work to resolve the commercial impediment.

Advantages:

• This option can be implemented without Ridgeline's cooperation or consent, as it is a unilateral filing by the applicant.

• The filing demonstrates applicant diligence and continued interest in prosecuting the application, which may buy additional time — potentially ninety (90) to one hundred eighty (180) days — before the WTB takes further action.

• The cost of preparing and filing a status update letter is relatively low, requiring only modest attorney time from Broadfield Whitaker.

• The filing creates a record of affirmative engagement with the Bureau, which could be cited in any subsequent discussion with the WTB regarding the application's status.

Disadvantages:

• The filing may prompt the WTB to set a firm deadline for action — for example, requiring the applicant to demonstrate within sixty (60) or ninety (90) days that the transaction remains viable and that closing is reasonably anticipated.

• A status update letter does not resolve the underlying transaction stall and may be viewed by the WTB as a temporizing measure if the applicant cannot identify a concrete path to closing.

• There is a risk that the letter could be viewed as misleading if the APA has effectively lapsed — a characterization that Ridgeline might advance. If Ridgeline were to file a contradictory statement with the WTB asserting that the transaction has been abandoned, the WTB might dismiss the application notwithstanding NWA's status update.

• The filing is not a permanent solution and does not eliminate dismissal risk; it merely defers the risk.

Timing: This filing should be prepared and submitted immediately if this option is selected. A draft status update letter has been prepared by Broadfield Whitaker in coordination with Calderwood & Harkness and is available for review (see separate draft letter to FCC, circulated under separate cover).

B. Option 2: Joint Stipulation for Abeyance

Under this option, counsel for both NWA (Broadfield Whitaker LLP and Calderwood & Harkness LLP) and Ridgeline (Hargrove, Sato & Caldwell LLP) would jointly file a stipulation with the WTB requesting that the FCC hold the application in abeyance pending resolution of the purchase price dispute. The stipulation would typically include a proposed timeline — for example, a six-month abeyance period with an option to request a single extension — and would confirm that both parties continue to support the application and intend to pursue the transaction to conclusion.

Advantages:

• A joint stipulation provides the strongest procedural protection against dismissal, as it demonstrates that both parties to the transaction — not just the applicant — continue to support the application and have a good-faith intention to resolve the commercial dispute and close the transaction.

• The FCC has precedent for granting abeyance in similar circumstances, particularly where both parties consent and where the impediment to closing is commercial rather than regulatory.

• A joint stipulation could be paired with a specific proposed timeline (e.g., six months), providing the WTB with a concrete basis for maintaining the application on the docket and establishing clear expectations for the parties.

• The filing signals to the WTB and the Committee that the transaction remains viable, which may facilitate the Committee's decision to maintain its review in a ready-to-resume posture rather than closing its file.

Disadvantages:

• This option requires the cooperation of Ridgeline and its counsel, Kevin Sato and Mariana Quelibo at Hargrove, Sato & Caldwell LLP. Given the current status of the purchase price dispute and the strain in the parties' relationship, Ridgeline may refuse to cooperate or may condition its cooperation on concessions in the price dispute.

• The last substantive inter-party communication was on November 8, 2023 (the Sato letter), and the relationship between the parties is understood to be strained. Outreach to Hargrove, Sato & Caldwell would require careful diplomatic handling.

• If Ridgeline refuses to cooperate, the attempt to negotiate a joint stipulation may have consumed valuable time without achieving the desired procedural protection.

• Even if a joint stipulation is granted, the abeyance period would be finite, and the WTB would ultimately expect the parties to either close the transaction or withdraw the application.

Timing: Implementation of this option would require outreach to Hargrove, Sato & Caldwell LLP to negotiate the terms of a joint stipulation. A draft stipulation has been prepared and is available for review (see separate draft stipulation, circulated under separate cover). The outreach process could take several weeks, depending on Ridgeline's responsiveness and willingness to engage.

C. Option 3: Request for Extension of Time

Under this option, NWA would file a formal request with the WTB for an extension of time to consummate the underlying transaction. The request would invoke 47 C.F.R. § 1.946(e) — which governs extension requests for construction requirements — by analogy, or would rely on the WTB's general discretionary authority to manage its docket and accommodate reasonable requests for additional time.

Advantages:

• A formal extension request creates an affirmative record of applicant diligence and places the Bureau on notice that the applicant is actively seeking to preserve the application.

• The request would formalize the ask and, if granted, would provide a defined period of protection against dismissal.

Disadvantages:

• Extension-of-time requests for assignment applications are not a standard procedural vehicle under the FCC's rules. The regulatory framework for extension requests — specifically 47 C.F.R. § 1.946(e) — was designed for construction extension requests, not for assignment applications. While the WTB has general discretionary authority to grant such requests, the procedural novelty of this approach may result in uncertainty or an unfavorable response.

• The WTB may view a formal extension request as unusual in the context of a pending assignment application and may respond with questions about the viability of the transaction rather than simply granting the extension.

• If the WTB grants only a short extension (e.g., 30–60 days), the benefit of this option may be marginal.

D. Option 4: Voluntary Withdrawal and Potential Refiling

Under this option, NWA would voluntarily withdraw FCC File No. 0010287-EX, with the understanding that a new application could be filed at a later date if and when the underlying transaction is reactivated.

Advantages:

• Voluntary withdrawal eliminates the uncertainty associated with potential WTB dismissal action and allows NWA to control the timing and circumstances of the application's termination.

• Voluntary withdrawal avoids the negative precedent and potential reputational implications of an involuntary dismissal for failure to prosecute.

• Withdrawal preserves goodwill with WTB staff, which may be valuable in connection with any future NWA filings at the FCC.

• Withdrawal is a clean procedural step that closes out the pending docket entry and any associated administrative overhead.

Disadvantages:

• Voluntary withdrawal results in the loss of all processing progress achieved on the application, including the completed comment period, the substantive information request and response, and the progress on the Section 310(b)(4) petition.

• A new application would require a full new application cycle, estimated at six (6) to twelve (12) or more months, including new filing fees, a new public notice, a new comment period, a new Section 310(b)(4) petition, and a new Committee review.

• Withdrawal may be premature if there is a viable path to resolving the purchase price dispute and consummating the transaction. Withdrawing the application would remove a significant element of transactional momentum and could make it more difficult to justify the time and expense of refiling if the transaction is later reactivated.

• Withdrawal would likely be interpreted by Ridgeline as evidence that NWA has abandoned the transaction, with potentially adverse consequences for the earnest money deposit dispute.

Recommendation: This option should be considered only if the client has determined, based on a comprehensive assessment of the commercial dynamics and the likelihood of resolving the purchase price dispute, that the transaction is unlikely to proceed. Until that determination is made, voluntary withdrawal is not recommended.

E. Option 5: Reactivate the Transaction

The most effective means of avoiding dismissal of the FCC application is to resolve the purchase price dispute with Ridgeline and move promptly to close the transaction. If the underlying transaction is reactivated and the parties demonstrate to the WTB that closing is imminent, the FCC application could be actively prosecuted to conclusion on its existing track, without the need for any of the procedural measures described above.

Advantages:

• Resolution of the commercial dispute and reactivation of the transaction is the single most effective step that can be taken to eliminate the dismissal risk and allow the application to proceed to grant.

• The application would proceed on its existing processing track, preserving all progress achieved to date and avoiding the costs and delays associated with refiling.

• Reactivation of the transaction would also likely prompt the Committee for the Assessment of Foreign Participation to resume its review and issue formal clearance.

Disadvantages:

• This option depends entirely on the resolution of the commercial dispute between NWA and Ridgeline, which involves a $14,200,000 gap between the parties' respective positions on the purchase price.

• Resolution of the commercial dispute is outside the scope of this regulatory analysis, and the timing and likelihood of such resolution are uncertain.

While this option is flagged as the ideal outcome from a regulatory perspective, it is recognized that the commercial dynamics driving the dispute are complex and are being addressed through separate workstreams within the Calderwood & Harkness engagement team.

VII. Interaction with Other Regulatory Considerations

A. Buildout Compliance for Oregon Licenses

Three of the fourteen licenses that are the subject of the pending assignment application — specifically, licenses WQAB212, WQAB213, and WQAB214, covering southern Oregon Economic Areas — have not met interim construction benchmarks required by the FCC. The applicable interim benchmark deadline is March 2025. Under the FCC's rules governing construction requirements for wireless radio service licenses (47 C.F.R. § 27.14), failure to meet interim construction benchmarks can result in enforcement action by the FCC, including the imposition of additional conditions on the license, a reduction in the licensed spectrum, or — in extreme cases — license cancellation.

If the transaction remains stalled and Ridgeline, as the current licensee, fails to meet the March 2025 interim benchmarks for these three licenses, those licenses could become subject to FCC enforcement action. This would complicate any future assignment application — whether under the current filing or a refiled application — because the buildout status of the licenses at the time of the assignment would need to be fully disclosed to the FCC and could affect the WTB's public interest analysis.

Moreover, if the current application is dismissed and later refiled, the buildout status of these Oregon licenses at the time of refiling would need to be disclosed in the new application. Any adverse buildout history — including missed benchmarks or pending enforcement action — could become a basis for additional scrutiny, delay, or opposition in connection with the new filing.

A separate memorandum on FCC Buildout Compliance Risk Assessment is being prepared and will be circulated under separate cover.

B. Anti-Trafficking / Unjust Enrichment Rules

The FCC's anti-trafficking and unjust enrichment rules, codified at 47 C.F.R. § 1.2111, apply to certain wireless radio service licenses originally acquired through FCC auction processes. These rules are designed to prevent licensees from acquiring spectrum at auction at favorable prices (e.g., through bidding credits or set-aside provisions) and then quickly reselling the spectrum at market prices, thereby capturing an unearned windfall. Several of the licenses at issue in this transaction were originally acquired by Ridgeline's predecessor-in-interest at auction, and the anti-trafficking rules may apply to certain of those licenses depending on the applicable holding periods and the terms of the original auction.

The current period of delay does not directly implicate the anti-trafficking rules. However, prolonged dormancy and a potential dismissal-and-refiling cycle could require an updated analysis of the anti-trafficking implications, particularly if the refiling occurs after the expiration of applicable holding periods or if market conditions have changed materially since the original analysis was conducted.

A separate memorandum on Anti-Trafficking / Unjust Enrichment Analysis is being prepared and will be circulated under separate cover.

C. Section 310(b)(4) Considerations

If the current application is dismissed and a new application is filed, a new Section 310(b)(4) petition for declaratory ruling would need to be prepared and filed. The new petition would need to reflect NTP's shareholder structure as of the new filing date, which may have changed since the original filing date of October 2022.

As of the original filing, NTP's significant shareholders were: Thornhill Asset Management LLP (9.7%), Sovereign Capital Partners AG (6.3%), Dunmore Pension Trust (5.1%), with the remaining 78.9% held by the public float. It has been approximately fifteen months since the original filing, and NTP's shareholder register may have experienced changes during that period. Any new shareholders exceeding FCC reporting thresholds — typically five percent (5%) or ten percent (10%), depending on the nature of the ownership interest — would need to be identified, disclosed, and analyzed in the new Section 310(b)(4) petition.

Additionally, if the ownership percentage of any existing disclosed shareholder has changed materially, those changes would need to be reflected in the updated petition. The FCC's foreign-ownership review is a snapshot analysis conducted as of the filing date, and any discrepancies between the original petition and the updated petition could prompt additional WTB inquiries or delays.

VIII. Recommended Course of Action

Based on the analysis set forth in this memorandum, the following course of action is recommended:

Immediate priority: File a unilateral status update letter with the WTB (Option A). This step should be taken immediately to forestall the imminent risk of dismissal. The status update letter can be filed promptly and without Ridgeline's cooperation. It will demonstrate NWA's continued interest in prosecuting the application and may buy additional time — estimated at ninety (90) to one hundred eighty (180) days — before the WTB takes further action. Calderwood & Harkness should coordinate with Broadfield Whitaker LLP (Annette Galvez and Daniel Fong) for preparation and filing of the letter. A draft has been prepared and is available for review.

Concurrent action: Initiate outreach to Hargrove, Sato & Caldwell LLP regarding a joint stipulation for abeyance (Option B). In parallel with the unilateral status update filing, Calderwood & Harkness should initiate outreach to Kevin Sato at Hargrove, Sato & Caldwell LLP to explore the possibility of a joint stipulation requesting that the FCC hold the application in abeyance pending resolution of the purchase price dispute. If Ridgeline cooperates, a joint stipulation would provide substantially stronger protection against dismissal than a unilateral status update. A draft stipulation has been prepared and is available for review. The outreach should be conducted carefully, given the strained relationship between the parties, and should be framed as a mutual interest in preserving the FCC application irrespective of the parties' respective positions on the price dispute.

Client consultation: Arrange a call with the Northgate team. A call should be scheduled promptly with the following individuals to discuss the regulatory timeline, the dismissal risk assessment, and the recommended options, and to obtain client direction on the preferred strategic path:

• Priya Dasgupta, General Counsel, Northgate Telecommunications PLC

• Thomas Brennan, Senior Vice President, Regulatory Affairs, Northgate Telecommunications PLC

• Claire Matsuda, Vice President, U.S. Operations, Northgate Wireless Americas Inc.

The call should address, at a minimum, the client's current assessment of the likelihood of resolving the purchase price dispute, the client's appetite for maintaining the FCC application versus voluntary withdrawal, and any developments in the commercial negotiations that may bear on the regulatory strategy.

Decision timeline: It is recommended that a decision on the long-term approach — whether to maintain the application, proceed with refiling, or voluntarily withdraw — be made no later than the end of Q1 2024, and ideally within thirty (30) days of the date of this memorandum. Each additional month of inactivity increases the likelihood of WTB action and narrows the window for effective procedural intervention.

Cost considerations: The cost implications of the recommended immediate actions are manageable. The unilateral status update letter is a minimal-cost filing, likely requiring no more than a few hours of Broadfield Whitaker attorney time and modest Calderwood & Harkness coordination time. The joint stipulation for abeyance, if pursued, would involve additional legal fees for negotiation and drafting, but these would be modest. Both actions are well within the remaining Phase 1 fee cap headroom. Based on current utilization ($847,320 billed plus $23,450 work-in-progress, against a $1,250,000 cap), the remaining available headroom is approximately $379,230 — more than sufficient to cover the immediate recommended actions and a reasonable period of ongoing regulatory monitoring and strategy.