[sheet: Cover]

FieldValue
Document TitleIssues List / Term Sheet Comparison — Equity Purchase Agreement Key Terms vs. Ironside Capital Management LP Investment Parameters
DateAugust 25, 2022
Prepared ByTheresa Kim, Lead Associate, Funds & Asset Management
Reviewed ByPamela Cross, Responsible Partner; Nicholas Stern, Billing Partner
ClientIronside Capital Management LP
MatterICM Cascadia Co-Invest, LP — Cascadia Renewables Holdings, Inc. Acquisition
Matter Number1023-00001
ConfidentialityATTORNEY-CLIENT PRIVILEGED / ATTORNEY WORK PRODUCT
PurposeComparison of EPA key terms (BSP draft dated August 20, 2022 with C&H mark-up) against Ironside's investment parameters and risk tolerances for co-investment vehicle participation
EPA PartiesSelling Shareholders (Timberline Growth Equity Fund III, LP; Weir Family Trust; Management Rollover Pool), Cascadia Renewables Holdings, Inc., and Cascadia Acquisition Corp.
Co-Invest VehicleICM Cascadia Co-Invest, LP (28.57% of total equity; $300M commitment)
Fund IVMeridian Infrastructure Partners Fund IV, LP (71.43% of total equity; $750M commitment)
Enterprise Value$1,950,000,000
Equity Value$1,050,000,000
Sponsor CounselBreckenridge Sloane & Pratt LLP (Charles A. Delacroix)
Target CounselRidgeway, Ashford & Malone PC (Nina R. Castellano)
Seller Counsel (Timberline)Garvey Lennox LLP (Steven F. Yun)

[sheet: Transaction Summary]

ParameterValueNotes / Source
TargetCascadia Renewables Holdings, Inc.Oregon corporation; HQ: 1100 SW Sixth Avenue, Suite 1800, Portland, OR 97204
Target Business14 hydroelectric facilities, 6 wind farms, 3 water-treatment concessions (OR, WA, ID)Long-term PPAs and municipal water-service contracts; weighted-average remaining life ~22 years
Target CEOJonathan M. WeirAlso trustee of Weir Family Trust (18% equity holder)
Target CFOSandra K. Llewellyn
Acquisition Type100% equity acquisition via Cascadia Acquisition Corp. (Delaware)Newly formed acquisition subsidiary
Enterprise Value$1,950,000,000Per EPA
Equity Value$1,050,000,000EV less $900M net debt
Net Debt$900,000,000Implied
FY 2021 Revenue$487,000,000Per Halstead & Greer LLP audit
FY 2021 EBITDA$138,000,000Per Halstead & Greer LLP audit
Implied EV/EBITDA~14.1x$1,950M ÷ $138M = 14.13x
Bull Run Filtration Project Concession Revenue~$64,000,000 per annum40-year concession from ~2018 with Portland Metropolitan Water District
Fund IV Equity Commitment$750,000,000 (71.43%)Meridian Infrastructure Partners Fund IV, LP
ICM Co-Invest Equity Commitment$300,000,000 (28.57%)ICM Cascadia Co-Invest, LP
Total Equity$1,050,000,000$750M + $300M
Senior Secured Term Loan$975,000,000Atlas National Bank, N.A. ($650M) + Pinnacle Credit Partners LLC ($325M)
Revolving Credit Facility$150,000,000Atlas National Bank (undrawn at close)
Total Sources$2,025,000,000$1,050M equity + $975M term loan
Total Uses$2,025,000,000$1,950M EV + $50M est. transaction costs + $25M WC escrow
Transaction Costs (est.)$50,000,000
Working-Capital Adjustment Escrow$25,000,000Per EPA
R&W Insurance Limit$195,000,00010% of EV; Northgate Specialty Insurance Co., Policy No. NSW-RI-2022-09814
R&W Insurance Premium Deposit$4,875,0002.5% rate on $195M limit; paid Sept 2, 2022
Governing Law (EPA)Delaware
Selling ShareholdersTimberline Growth Equity Fund III, LP (62%), Weir Family Trust (18%), Management Rollover Pool (20%; 50% rollover = 10% of total)
ICM Co-Invest Capital Called$22,500,0007.5% of $300M; single call August 15, 2022
ICM Co-Invest Unfunded$277,500,000$300M − $22.5M
Co-Invest Carried Interest10% above 8% preferred return (compounded quarterly)vs. 20% carry in Fund IV main partnership
Co-Invest Management Fee0%Per Side Letter dated July 29, 2022

[sheet: Representations & Warranties]

Issue #Rep CategoryEPA ProvisionBSP Draft TermIronside Parameter / Risk ToleranceGap AnalysisC&H Comment / RecommendationRisk LevelStatusCross-Reference
1Organization & Good StandingArt. III, §3.01Standard — Cascadia and each subsidiary duly organized and in good standing in jurisdiction of formation and each jurisdiction where requiredMarket; acceptableNo gapAcceptable as drafted; confirm list of jurisdictions includes OR, WA, IDLowResolvedDD Memo: Corporate Structure (Aug 8, 2022)
2Authority & EnforceabilityArt. III, §3.02Standard — binding obligations enforceable in accordance with terms, subject to customary enforceability exceptionsMarket; acceptableNo gapAcceptableLowResolved
3CapitalizationArt. III, §3.03Sellers represent as to ownership of Cascadia equity; cap table set forth in Schedule 3.03; no outstanding options/warrants except management rollover poolConfirm clean cap table; management rollover pool at 20% with 50% rollover (10% of total) must be specifically scheduledVerify rollover mechanics and anti-dilutionEnsure rollover pool participants individually identified in Schedule 3.03; confirm no drag-along issues with rolling managementMediumOpenDD Memo: Corporate Structure (Aug 8, 2022)
4SubsidiariesArt. III, §3.04Complete list of subsidiaries in Schedule 3.04; each duly organized; all equity interests owned free and clear of liensVerify subsidiary structure matches DD findings; confirm no minority interests or JV complicationsNo significant gap; confirm completeness of subsidiary listCross-check Schedule 3.04 against corporate structure chart from DD; verify no undisclosed subsidiaries or JV interestsLowResolvedDD Memo: Corporate Structure (Aug 8, 2022)
5Financial StatementsArt. III, §3.05Audited financials for FY 2019–2021 and interim unaudited financials through June 30, 2022; prepared in accordance with GAAP consistently applied; present fairly in all material respectsFY 2021 revenue $487M, EBITDA $138M per Halstead & Greer audit; require bring-down to most recent practicable dateRequest interim financials through latest month-end prior to closingRequest bring-down to within 30 days of closing; add specific rep that no material off-balance-sheet liabilities existMediumOpenSummary DD Report (Sep 1, 2022)
6No Undisclosed LiabilitiesArt. III, §3.06No liabilities except as reflected in financial statements or incurred in ordinary course since balance sheet dateStandard; acceptable with adequate disclosure schedulesNo significant gapAcceptable; verify adequacy of disclosure schedulesLowResolved
7Absence of Certain ChangesArt. III, §3.07Since December 31, 2021, no events that individually or in the aggregate have had or would reasonably be expected to have an MAEMust be carefully calibrated with MAE definition; interim period changes should be fully disclosedConfirm scope covers all material interim developments including Bull Run concession renegotiation noticeVerify disclosure of all interim period changes; ensure concession renegotiation notice is coveredMediumOpenMAE Analysis — separate memo
8Compliance with LawsArt. III, §3.08Cascadia and each subsidiary in compliance with all applicable laws in all material respects; no notice of violation receivedStandard; acceptable. Must specifically address FERC, OPUC, and state environmental regulationsNo significant gapAcceptable; verify cross-reference to regulatory permits representationLowResolved
9No Conflicts / ConsentsArt. III, §3.09Execution and delivery of EPA does not conflict with organizational documents, material contracts, or applicable law; required consents listed in Schedule 3.09Verify completeness of consent schedule; particularly concession agreements and PPAs requiring change-of-control consentsCritical — Bull Run concession may require consent from Portland Metropolitan Water DistrictCross-reference with closing condition re: third-party consents; ensure all change-of-control triggers identifiedMediumOpenDD Memo: Material Contracts (Aug 22, 2022)
10Material ContractsArt. III, §3.10All material contracts listed in Schedule 3.10; no breach or default; defined as contracts with annual value >$5MCritical — must cover all PPAs, water concessions (esp. Bull Run at ~$64M/yr), municipal contracts, O&M agreements; $5M threshold acceptable given portfolio scaleEnsure Bull Run Filtration Project concession (40-year term, ~$64M annual revenue) specifically scheduled and that pending concession issues are disclosedAdd specific requirement to schedule all government contracts, concession agreements, and PPAs regardless of dollar threshold; flag Bull Run concession for enhanced disclosure given Portland Metropolitan Water District relationshipHighOpenDD Memo: Material Contracts (Aug 22, 2022)
11Real PropertyArt. III, §3.11Fee-owned and leased real property listed in schedules; customary representations re: title, liens, condition14 hydroelectric facilities, 6 wind farms, 3 water-treatment facilities — significant real property portfolio; require title insurance commitmentsVerify easement and right-of-way coverage is comprehensiveRecommend title insurance for key properties; verify all FERC-licensed facility lands includedMediumOpenDD Memo: Real Property (Aug 25, 2022)
12Personal Property / AssetsArt. III, §3.12Cascadia owns or has valid rights to use all assets necessary for the conduct of the business as currently conductedStandard; acceptable for infrastructure portfolioNo significant gapAcceptable; confirm adequacy for turbine and generation equipmentLowResolved
13EnvironmentalArt. III, §3.13Compliance with Environmental Laws; no pending or threatened actions; all permits current; Phase I and Phase II reports deliveredZero tolerance for material unremediated contamination; require reliance on Clearwater Environmental Consulting Phase I/II reportsConfirm all 23 facilities covered by Phase I/II assessments; negotiate ability for co-invest to rely on Clearwater reportsAdd right to rely on Clearwater Phase I/II reports; consider environmental indemnity escrow for identified issues; verify all facilities assessedHighOpenDD Memo: Environmental (Aug 29, 2022)
14Regulatory Compliance / PermitsArt. III, §3.14All material permits and licenses held and in good standing; includes FERC licenses, state utility permits, water rightsCritical for infrastructure asset — FERC hydroelectric licenses and state utility permits are value driversEnsure FERC licenses specifically represented as transferable; address OPUC and Oregon regulatory requirementsRequire specific schedule of FERC licenses with expiration dates and transferability confirmation; tie to FERC §203 approval conditionHighOpenDD Memo: Regulatory Permits (Aug 18, 2022)
15Intellectual PropertyArt. III, §3.15Standard IP reps — ownership, no infringement, adequate licensesLow risk area for infrastructure platformNo significant gapAcceptable as draftedLowResolvedDD Memo: IP (Aug 23, 2022)
16Employment / BenefitsArt. III, §3.16Employee census, benefit plans, no pending labor disputes, WARN Act compliance~25 management members in rollover pool; verify CBA status; WARN Act analysis neededConfirm number of employees across jurisdictions for WARN analysis; CBA review neededAdd specific rep re: management rollover pool terms; confirm no CBA obstacles to closing; WARN Act analysis in progressMediumOpenDD Memo: Employment (Aug 26, 2022)
17LitigationArt. III, §3.17No pending or threatened actions, suits, or proceedings that would be material; scheduled exceptionsVerify current litigation profile; ensure Portland Water District concession dispute is NOT characterized as litigation but is fully disclosedConfirm whether concession renegotiation notice triggers disclosure under this representationRecommend carving the concession renegotiation out of litigation rep and addressing under Material Contracts or separate disclosure; monitor closelyMediumOpenDD Memo: Litigation (Aug 19, 2022)
18TaxArt. III, §3.18Standard tax reps — all returns filed, all taxes paid, no audits pending, no tax liensVerify with Halstead & Greer; state tax positions in OR, WA, ID need specific attentionConfirm adequacy of tax reps across multi-state operationsCoordinate with Sylvia Hartwell (C&H Tax) and Halstead & Greer; request tax opinion or representation on material tax positionsMediumOpenTax Structuring Memo (Jul 20, 2022)
19InsuranceArt. III, §3.19All material insurance policies current and in force; no pending claims that would reduce coverage below policy limitsStandard; verify adequate coverage for infrastructure assetsNo significant gapAcceptable; cross-check with environmental and property insurance coverageLowResolved
20Absence of Changes (Interim Covenant)Art. III, §3.20Since balance sheet date, business conducted in ordinary course consistent with past practice; no material adverse changeClosely tied to MAE definition — critical given Bull Run concession issueMust be carefully calibrated with MAE definition in §8.01Tie to MAE analysis; ensure interim period operations covenant is comprehensiveHighOpenMAE Analysis — separate memo
21Anti-Corruption / FCPAArt. III, §3.21Standard FCPA/anti-bribery reps — no payments to government officials; compliance policies in placeStandard; acceptable given domestic US operations primarily with municipal/state counterpartiesNo significant gapAcceptable as drafted; verify scope covers municipal concession relationshipsLowResolved
22Related Party TransactionsArt. III, §3.22All related party transactions disclosed in Schedule 3.22; Weir Family Trust relationships fully disclosedVerify all Weir family and management relationships are disclosed; particular attention to any service agreements or leases with related partiesConfirm completeness of related party disclosure given CEO's dual role as Weir Family Trust trusteeReview Schedule 3.22 against DD findings; ensure all Weir family relationships disclosed including personal guarantees and management service arrangementsMediumOpenDD Memo: Corporate Structure (Aug 8, 2022)
23Brokers / FindersArt. III, §3.23No broker or finder entitled to fees in connection with transaction except Whitfield Bancorp LLC (seller's advisor)Standard; acceptable — seller's advisor fees are seller's responsibilityNo gapAcceptableLowResolved
24Data Privacy / CybersecurityArt. III, §3.24Compliance with applicable data privacy laws; no material data breaches in last 3 years; adequate cybersecurity measures in placeStandard for infrastructure company; low-risk area given limited consumer dataNo significant gapAcceptable; confirm scope covers SCADA and operational technology systemsLowResolved

25

[sheet: Indemnification]

Issue #Indemnification TermEPA ProvisionBSP Draft TermIronside Parameter / Risk ToleranceGap AnalysisC&H Comment / RecommendationRisk LevelStatusCross-Reference
1General Indemnification CapArt. VII, §7.02(a)10% of enterprise value = $195,000,000Matches R&W insurance coverage limit ($195M); acceptable if R&W insurance provides back-stopAligned with R&W insurance; confirm no gapsAcceptable; coordinate with Northgate Specialty policy to ensure seamless coverage transition from contractual indemnity to insuranceMediumOpenR&W Insurance Coverage Memo (Aug 31, 2022)
2Fundamental Reps CapArt. VII, §7.02(b)100% of equity purchase price (aggregate seller cap)Market for fundamental reps (organization, authority, capitalization, tax, brokers)No gapAcceptableLowResolved
3Deductible / BasketArt. VII, §7.03Tipping basket: 1% of enterprise value = $19,500,000; once exceeded, recovery from dollar oneIronside prefers first-dollar coverage above basket; 1% = $19.5M is market for this deal sizeAcceptable threshold; confirm whether R&W insurance retention alignsVerify R&W insurance retention amount aligns with or is lower than basket; negotiate if misalignedMediumOpenR&W Insurance Coverage Memo (Aug 31, 2022)
4Mini-Basket / De MinimisArt. VII, §7.03(b)Individual claims below $250,000 do not count toward basketStandard; acceptableNo gapAcceptableLowResolved
5Survival — General RepsArt. VII, §7.04(a)18 months from closingIronside prefers 24 months; 18 months is within market rangePotential gap; negotiate upward if possiblePush for 24-month survival; if 18 months accepted, ensure R&W insurance policy period extends beyondMediumOpen
6Survival — Fundamental RepsArt. VII, §7.04(b)Full statute of limitations + 60 daysMarket; acceptableNo gapAcceptableLowResolved
7Survival — Tax RepsArt. VII, §7.04(c)Full statute of limitations + 60 daysMarket; acceptableNo gapAcceptableLowResolved
8Survival — Environmental RepsArt. VII, §7.04(d)36 months from closingIronside prefers full statute of limitations given infrastructure asset profileGap — 36 months may be insufficient for latent environmental claimsPush for extended survival (statute of limitations or at minimum 60 months) given 23-facility portfolio; coordinate with Clearwater Phase II findingsHighOpenDD Memo: Environmental (Aug 29, 2022)
9Special Indemnity — Bull Run ConcessionArt. VII, §7.05BSP draft silent on specific indemnity for concession renegotiation riskIronside requires specific indemnity or escrow for potential revenue reduction from Bull Run concession renegotiation (~$64M/yr at risk)Significant gap — no specific protection for known concession riskPropose special indemnity for losses arising from Bull Run concession renegotiation with separate cap and extended survival; alternative: escrow mechanismHighOpenDD Memo: Material Contracts (Aug 22, 2022)
10R&W Insurance InteractionArt. VII, §7.06Buyer agrees to pursue R&W insurance before seeking contractual indemnity from sellers for covered repsStandard for R&W-backed deals; acceptable provided policy has adequate coverageConfirm policy exclusions do not create uncovered gaps between contractual indemnity limitations and R&W policy exclusionsMap EPA indemnification provisions against Northgate policy exclusions to identify coverage gaps; prepare gap analysisHighOpenR&W Insurance Coverage Memo (Aug 31, 2022)
11Co-Invest Allocation of Indemnification RightsArt. VII, §7.07Pro rata allocation between Fund IV (71.43%) and ICM Co-Invest (28.57%)Ironside requires clear pro rata allocation; no joint and several exposure beyond its 28.57% shareConfirm no joint and several liability provisions that would expose ICM Co-Invest beyond its pro rata shareEnsure EPA and Co-Investment Allocation Agreement provide explicit pro rata cap on ICM Co-Invest indemnification exposure at 28.57%HighOpenReps & Warranties Risk Allocation Memo (Sep 2, 2022)
12Exclusive RemedyArt. VII, §7.08Indemnification is exclusive post-closing remedy (except fraud)Market; acceptable with fraud carve-outNo gapAcceptable; confirm fraud carve-out is broadly definedLowResolved
13Indemnification Procedures — Notice RequirementsArt. VII, §7.09Written notice of claim within 30 days of becoming aware; failure to provide timely notice does not waive right unless prejudicial to indemnifying partyStandard; acceptable — non-prejudicial late notice carve-out is importantNo gapAcceptable; ensure co-invest vehicle receives copies of all indemnification noticesLowResolved
14Third-Party Claim DefenseArt. VII, §7.10Indemnifying party has right to assume defense of third-party claims; buyer consent required for settlement involving non-monetary relief or admission of liabilityStandard; acceptable with buyer consent requirement for non-monetary settlementsNo gapAcceptable; verify consent right extends to co-invest vehicle for claims disproportionately affecting co-investLowResolved
15Mitigation ObligationArt. VII, §7.11Buyer has obligation to use commercially reasonable efforts to mitigate losses; insurance recoveries offset indemnification paymentsStandard; acceptable — mitigation obligation should not be overly burdensomeConfirm mitigation standard is commercially reasonable (not best efforts)Acceptable as drafted; verify insurance offset provisions do not create perverse incentives to delay insurance claimsLowResolved

[sheet: Closing Conditions]

Issue #Closing ConditionEPA ProvisionBSP Draft TermIronside Parameter / Risk ToleranceGap AnalysisC&H Comment / RecommendationRisk LevelCurrent StatusExpected Timeline
1FERC §203 ApprovalArt. VI, §6.01(a)Condition to all parties — receipt of FERC approval under Federal Power Act §203 for transfer of hydroelectric licensesCritical condition; non-waivable for IronsideNo gap in condition itself; FERC Docket No. EC22-143-000; application to be filed Oct 19, 2022Track FERC timeline; note 18-month lapse provision in FERC orders — if not closed within 18 months, approval lapses and must be re-filedHighApplication to be filed Oct 19, 2022Expected review period 60–120 days
2OPUC ApprovalArt. VI, §6.01(b)Condition to all parties — receipt of Oregon Public Utility Commission approval for transfer of utility assetsCritical condition; non-waivableOPUC Docket No. UM-2287; application to be filed Oct 14, 2022Track OPUC timeline; review precedent for similar infrastructure transfers in OregonHighApplication to be filed Oct 14, 2022Expected review period 90–180 days
3CFIUS ClearanceArt. VI, §6.01(c)Condition to all parties — CFIUS clearance or expiration of applicable review periodStandard for infrastructure assets; no foreign ownership issues identifiedVoluntary notice recommended; no foreign ownership issues expectedVoluntary notice filed; expect acknowledgment by Sept 20, 2022; low risk of adverse findingLowVoluntary notice filed30–45 day review expected
4No Material Adverse EffectArt. VI, §6.02(a)Condition to buyer — no MAE shall have occurred since date of EPACritical; see MAE definition analysis (separate issue)MAE definition must be carefully negotiated — see Reps & Warranties sheet, Issue #20, and separate MAE memoCross-reference MAE definition; ensure adequate carve-outs do not swallow the condition (particularly re: regulatory changes and concession renegotiation)HighOpenN/A
5Accuracy of Reps & Warranties (Bring-Down)Art. VI, §6.02(b)Condition to buyer — seller reps accurate in all material respects at closing (double-materiality scrub where reps are already qualified by materiality)Standard; acceptableNo gapVerify bring-down standard is appropriate; monitor for changes during interim periodMediumOpenAt closing
6Compliance with CovenantsArt. VI, §6.02(c)Condition to buyer — sellers have complied with all covenants in all material respectsStandard; acceptableNo gapAcceptableLowOpenAt closing
7No InjunctionArt. VI, §6.03Mutual condition — no law, order, or injunction prohibiting the transactionStandard; acceptableNo gapAcceptableLowOpenAt closing
8Financing ConditionArt. VI, §6.02(d)Condition to buyer — receipt of debt financing on terms substantially consistent with commitment letterCritical; debt commitment from Atlas National Bank ($650M) and Pinnacle Credit Partners ($325M); commitment letter executed Aug 30, 2022Ironside requires certainty of financing; confirm SunGard/limited-conditionality provisions in commitment letterCoordinate with debt commitment letter review; ensure financing condition in EPA is reverse-break-fee backstopped if financing fails for reasons not attributable to buyerHighCommitment letter executed Aug 30, 2022Commitment valid through Dec 31, 2022 (initial period)
9Third-Party ConsentsArt. VI, §6.02(e)Condition to buyer — receipt of specified third-party consents (including counterparty consents under material PPAs and concession agreements)May be challenging for Bull Run concession given renegotiation notice; verify which consents are closing conditions vs. post-closing covenantsSignificant risk — if Bull Run concession counterparty withholds consent or conditions it on renegotiated termsIdentify all required third-party consents; assess risk of consent failure for Bull Run and other municipal contracts; consider whether consent requirement should be post-closing covenant for certain contractsHighOpenOngoing
10Officer's CertificateArt. VI, §6.02(f)Condition to buyer — delivery of officer's certificate by Cascadia CEO and CFO certifying satisfaction of closing conditionsStandard; acceptableNo gapAcceptableLowOpenAt closing
11R&W Insurance PolicyArt. VI, §6.02(g)Condition to buyer — R&W insurance policy bound and in effectPolicy bound Sept 1, 2022 (Northgate Specialty Insurance Co.); $195M limitConfirm policy will remain in effect through closing; address tolling if closing is delayedPolicy bound; monitor for any premium adjustments if closing delayed beyond initial coverage periodMediumBound Sept 1, 2022In effect
12Working Capital Escrow FundingArt. VI, §6.02(h)Condition to buyer — sellers to deposit $25M into escrow account at Atlas National Bank for working-capital adjustmentStandard; $25M escrow aligns with transaction summaryNo gapAcceptable; verify escrow agreement terms including release mechanics and dispute resolutionLowOpenAt closing
13Idaho Public Utilities Commission NotificationArt. VI, §6.01(d)Condition to all parties — filing of notification with Idaho PUC (no approval required; notification only for two Idaho wind farms)Standard notification; lower regulatory risk than FERC/OPUC approvalsNo gap; notification requirement onlyFile notification concurrently with FERC/OPUC applications; monitor for any Idaho PUC inquiryLowOpenTo be filed Oct 14, 2022
14HSR Act ClearanceArt. VI, §6.01(e)Condition to all parties — expiration or early termination of HSR Act waiting periodStandard for deal above $101M threshold; filing expected promptly after signingNo antitrust concerns identified; expect early terminationFile within 5 business days of signing; request early terminationLowOpen30-day waiting period; early termination expected

[sheet: MAE Definition]

Issue #MAE ComponentEPA ProvisionBSP Draft LanguageIronside PositionGap AnalysisC&H Comment / RecommendationRisk LevelStatus
1Core MAE Definition§8.01(a)Any event, change, or effect that, individually or in the aggregate, has had or would reasonably be expected to have a material adverse effect on the business, results of operations, financial condition, or assets of Cascadia and its subsidiaries, taken as a wholeStandard formulation; acceptableNo gap on core definitionAcceptable; focus negotiation on carve-outsLowResolved
2General Economic Conditions Carve-Out§8.01(a)(i)Changes in general economic or business conditions (unless disproportionately affecting Cascadia relative to comparably situated companies)Standard; acceptable with disproportionate-impact exceptionConfirm disproportionate-impact exception is includedAcceptable with disproportionate-impact exceptionLowResolved
3Industry Conditions Carve-Out§8.01(a)(ii)Changes affecting the renewable energy or water infrastructure industry generally (unless disproportionately affecting Cascadia)Standard; acceptable with disproportionate-impact exceptionNo gapAcceptableLowResolved
4Regulatory/Legal Changes Carve-Out§8.01(a)(iii)Changes in applicable law or regulations (unless disproportionately affecting Cascadia)Critical — Oregon SB 1567 (2022) cited by Portland Metropolitan Water District as basis for concession renegotiationMust ensure that specific regulatory changes triggering the Bull Run concession renegotiation are NOT carved out, or that disproportionate-impact exception appliesNegotiate to exclude from carve-out any regulatory change that specifically and disproportionately affects Cascadia's concession agreements; alternative: add specific reference to Oregon SB 1567HighOpen
5Pending Concession Renegotiation§8.01(a)(vi) (proposed)BSP draft does not address concession renegotiation specificallyIronside requires either (a) specific exclusion of Bull Run renegotiation from MAE carve-outs, or (b) separate closing condition addressing concession statusSignificant gap — concession renegotiation is known risk with ~$64M annual revenue impact (13.1% of FY 2021 revenue)Propose specific provision that material adverse changes in terms of the Bull Run Filtration Project concession (or any concession representing >5% of revenue) are not carved out of MAE definitionHighOpen
6Transaction-Related Carve-Out§8.01(a)(iv)Effects arising from the announcement or pendency of the transactionStandard; acceptable — prevents seller from arguing that customer/employee reactions to the deal itself constitute an MAENo gapAcceptableLowResolved
7Quantitative Threshold§8.01(b) (proposed)BSP draft does not include quantitative threshold for MAEIronside would benefit from quantitative guidance but acknowledges this is typically not includedNo specific gap; market practice is qualitative standardDo not propose quantitative threshold (unlikely to be accepted); instead focus on carve-out negotiations, particularly around concession riskLowResolved
8Force Majeure / Natural Disaster Carve-Out§8.01(a)(v)Changes arising from natural disasters, pandemics, acts of war, terrorism (unless disproportionately affecting Cascadia)Standard; acceptable given Pacific Northwest natural disaster exposure (seismic, wildfire); disproportionate-impact exception criticalConfirm disproportionate-impact exception covers events affecting Cascadia's specific geographic concentrations (OR, WA, ID)Acceptable with disproportionate-impact exception; monitor wildfire season risk during interim period given facility locationsMediumResolved
9Seasonality / Weather Pattern Carve-Out§8.01(a)(vii) (proposed)BSP draft includes carve-out for variations in weather patterns affecting hydroelectric generation outputIronside opposes broad weather carve-out — sustained drought would materially impair hydroelectric revenue (~60% of portfolio)Gap — carve-out is overly broad; could mask material decline in hydroelectric outputNarrow weather carve-out to exclude only normal seasonal variations consistent with historical patterns; sustained drought or material water supply reduction should NOT be carved outMediumOpen
10Buyer Actions Carve-Out§8.01(a)(viii)Changes resulting from any action taken or omitted to be taken by buyer or its affiliatesStandard; acceptableNo gapAcceptableLowResolved