1023-00001
· Ironside Capital Management LP · Transaction Documents/EPA
epa-issues-list-term-comparison.xlsx
DOCUMENT
Funds
[sheet: Cover]
| Field | Value |
| Document Title | Issues List / Term Sheet Comparison — Equity Purchase Agreement Key Terms vs. Ironside Capital Management LP Investment Parameters |
| Date | August 25, 2022 |
| Prepared By | Theresa Kim, Lead Associate, Funds & Asset Management |
| Reviewed By | Pamela Cross, Responsible Partner; Nicholas Stern, Billing Partner |
| Client | Ironside Capital Management LP |
| Matter | ICM Cascadia Co-Invest, LP — Cascadia Renewables Holdings, Inc. Acquisition |
| Matter Number | 1023-00001 |
| Confidentiality | ATTORNEY-CLIENT PRIVILEGED / ATTORNEY WORK PRODUCT |
| Purpose | Comparison of EPA key terms (BSP draft dated August 20, 2022 with C&H mark-up) against Ironside's investment parameters and risk tolerances for co-investment vehicle participation |
| EPA Parties | Selling Shareholders (Timberline Growth Equity Fund III, LP; Weir Family Trust; Management Rollover Pool), Cascadia Renewables Holdings, Inc., and Cascadia Acquisition Corp. |
| Co-Invest Vehicle | ICM Cascadia Co-Invest, LP (28.57% of total equity; $300M commitment) |
| Fund IV | Meridian Infrastructure Partners Fund IV, LP (71.43% of total equity; $750M commitment) |
| Enterprise Value | $1,950,000,000 |
| Equity Value | $1,050,000,000 |
| Sponsor Counsel | Breckenridge Sloane & Pratt LLP (Charles A. Delacroix) |
| Target Counsel | Ridgeway, Ashford & Malone PC (Nina R. Castellano) |
| Seller Counsel (Timberline) | Garvey Lennox LLP (Steven F. Yun) |
[sheet: Transaction Summary]
| Parameter | Value | Notes / Source |
| Target | Cascadia Renewables Holdings, Inc. | Oregon corporation; HQ: 1100 SW Sixth Avenue, Suite 1800, Portland, OR 97204 |
| Target Business | 14 hydroelectric facilities, 6 wind farms, 3 water-treatment concessions (OR, WA, ID) | Long-term PPAs and municipal water-service contracts; weighted-average remaining life ~22 years |
| Target CEO | Jonathan M. Weir | Also trustee of Weir Family Trust (18% equity holder) |
| Target CFO | Sandra K. Llewellyn | |
| Acquisition Type | 100% equity acquisition via Cascadia Acquisition Corp. (Delaware) | Newly formed acquisition subsidiary |
| Enterprise Value | $1,950,000,000 | Per EPA |
| Equity Value | $1,050,000,000 | EV less $900M net debt |
| Net Debt | $900,000,000 | Implied |
| FY 2021 Revenue | $487,000,000 | Per Halstead & Greer LLP audit |
| FY 2021 EBITDA | $138,000,000 | Per Halstead & Greer LLP audit |
| Implied EV/EBITDA | ~14.1x | $1,950M ÷ $138M = 14.13x |
| Bull Run Filtration Project Concession Revenue | ~$64,000,000 per annum | 40-year concession from ~2018 with Portland Metropolitan Water District |
| Fund IV Equity Commitment | $750,000,000 (71.43%) | Meridian Infrastructure Partners Fund IV, LP |
| ICM Co-Invest Equity Commitment | $300,000,000 (28.57%) | ICM Cascadia Co-Invest, LP |
| Total Equity | $1,050,000,000 | $750M + $300M |
| Senior Secured Term Loan | $975,000,000 | Atlas National Bank, N.A. ($650M) + Pinnacle Credit Partners LLC ($325M) |
| Revolving Credit Facility | $150,000,000 | Atlas National Bank (undrawn at close) |
| Total Sources | $2,025,000,000 | $1,050M equity + $975M term loan |
| Total Uses | $2,025,000,000 | $1,950M EV + $50M est. transaction costs + $25M WC escrow |
| Transaction Costs (est.) | $50,000,000 | |
| Working-Capital Adjustment Escrow | $25,000,000 | Per EPA |
| R&W Insurance Limit | $195,000,000 | 10% of EV; Northgate Specialty Insurance Co., Policy No. NSW-RI-2022-09814 |
| R&W Insurance Premium Deposit | $4,875,000 | 2.5% rate on $195M limit; paid Sept 2, 2022 |
| Governing Law (EPA) | Delaware |
| Selling Shareholders | Timberline Growth Equity Fund III, LP (62%), Weir Family Trust (18%), Management Rollover Pool (20%; 50% rollover = 10% of total) | |
| ICM Co-Invest Capital Called | $22,500,000 | 7.5% of $300M; single call August 15, 2022 |
| ICM Co-Invest Unfunded | $277,500,000 | $300M − $22.5M |
| Co-Invest Carried Interest | 10% above 8% preferred return (compounded quarterly) | vs. 20% carry in Fund IV main partnership |
| Co-Invest Management Fee | 0% | Per Side Letter dated July 29, 2022 |
[sheet: Representations & Warranties]
| Issue # | Rep Category | EPA Provision | BSP Draft Term | Ironside Parameter / Risk Tolerance | Gap Analysis | C&H Comment / Recommendation | Risk Level | Status | Cross-Reference |
| 1 | Organization & Good Standing | Art. III, §3.01 | Standard — Cascadia and each subsidiary duly organized and in good standing in jurisdiction of formation and each jurisdiction where required | Market; acceptable | No gap | Acceptable as drafted; confirm list of jurisdictions includes OR, WA, ID | Low | Resolved | DD Memo: Corporate Structure (Aug 8, 2022) |
| 2 | Authority & Enforceability | Art. III, §3.02 | Standard — binding obligations enforceable in accordance with terms, subject to customary enforceability exceptions | Market; acceptable | No gap | Acceptable | Low | Resolved | |
| 3 | Capitalization | Art. III, §3.03 | Sellers represent as to ownership of Cascadia equity; cap table set forth in Schedule 3.03; no outstanding options/warrants except management rollover pool | Confirm clean cap table; management rollover pool at 20% with 50% rollover (10% of total) must be specifically scheduled | Verify rollover mechanics and anti-dilution | Ensure rollover pool participants individually identified in Schedule 3.03; confirm no drag-along issues with rolling management | Medium | Open | DD Memo: Corporate Structure (Aug 8, 2022) |
| 4 | Subsidiaries | Art. III, §3.04 | Complete list of subsidiaries in Schedule 3.04; each duly organized; all equity interests owned free and clear of liens | Verify subsidiary structure matches DD findings; confirm no minority interests or JV complications | No significant gap; confirm completeness of subsidiary list | Cross-check Schedule 3.04 against corporate structure chart from DD; verify no undisclosed subsidiaries or JV interests | Low | Resolved | DD Memo: Corporate Structure (Aug 8, 2022) |
| 5 | Financial Statements | Art. III, §3.05 | Audited financials for FY 2019–2021 and interim unaudited financials through June 30, 2022; prepared in accordance with GAAP consistently applied; present fairly in all material respects | FY 2021 revenue $487M, EBITDA $138M per Halstead & Greer audit; require bring-down to most recent practicable date | Request interim financials through latest month-end prior to closing | Request bring-down to within 30 days of closing; add specific rep that no material off-balance-sheet liabilities exist | Medium | Open | Summary DD Report (Sep 1, 2022) |
| 6 | No Undisclosed Liabilities | Art. III, §3.06 | No liabilities except as reflected in financial statements or incurred in ordinary course since balance sheet date | Standard; acceptable with adequate disclosure schedules | No significant gap | Acceptable; verify adequacy of disclosure schedules | Low | Resolved | |
| 7 | Absence of Certain Changes | Art. III, §3.07 | Since December 31, 2021, no events that individually or in the aggregate have had or would reasonably be expected to have an MAE | Must be carefully calibrated with MAE definition; interim period changes should be fully disclosed | Confirm scope covers all material interim developments including Bull Run concession renegotiation notice | Verify disclosure of all interim period changes; ensure concession renegotiation notice is covered | Medium | Open | MAE Analysis — separate memo |
| 8 | Compliance with Laws | Art. III, §3.08 | Cascadia and each subsidiary in compliance with all applicable laws in all material respects; no notice of violation received | Standard; acceptable. Must specifically address FERC, OPUC, and state environmental regulations | No significant gap | Acceptable; verify cross-reference to regulatory permits representation | Low | Resolved | |
| 9 | No Conflicts / Consents | Art. III, §3.09 | Execution and delivery of EPA does not conflict with organizational documents, material contracts, or applicable law; required consents listed in Schedule 3.09 | Verify completeness of consent schedule; particularly concession agreements and PPAs requiring change-of-control consents | Critical — Bull Run concession may require consent from Portland Metropolitan Water District | Cross-reference with closing condition re: third-party consents; ensure all change-of-control triggers identified | Medium | Open | DD Memo: Material Contracts (Aug 22, 2022) |
| 10 | Material Contracts | Art. III, §3.10 | All material contracts listed in Schedule 3.10; no breach or default; defined as contracts with annual value >$5M | Critical — must cover all PPAs, water concessions (esp. Bull Run at ~$64M/yr), municipal contracts, O&M agreements; $5M threshold acceptable given portfolio scale | Ensure Bull Run Filtration Project concession (40-year term, ~$64M annual revenue) specifically scheduled and that pending concession issues are disclosed | Add specific requirement to schedule all government contracts, concession agreements, and PPAs regardless of dollar threshold; flag Bull Run concession for enhanced disclosure given Portland Metropolitan Water District relationship | High | Open | DD Memo: Material Contracts (Aug 22, 2022) |
| 11 | Real Property | Art. III, §3.11 | Fee-owned and leased real property listed in schedules; customary representations re: title, liens, condition | 14 hydroelectric facilities, 6 wind farms, 3 water-treatment facilities — significant real property portfolio; require title insurance commitments | Verify easement and right-of-way coverage is comprehensive | Recommend title insurance for key properties; verify all FERC-licensed facility lands included | Medium | Open | DD Memo: Real Property (Aug 25, 2022) |
| 12 | Personal Property / Assets | Art. III, §3.12 | Cascadia owns or has valid rights to use all assets necessary for the conduct of the business as currently conducted | Standard; acceptable for infrastructure portfolio | No significant gap | Acceptable; confirm adequacy for turbine and generation equipment | Low | Resolved | |
| 13 | Environmental | Art. III, §3.13 | Compliance with Environmental Laws; no pending or threatened actions; all permits current; Phase I and Phase II reports delivered | Zero tolerance for material unremediated contamination; require reliance on Clearwater Environmental Consulting Phase I/II reports | Confirm all 23 facilities covered by Phase I/II assessments; negotiate ability for co-invest to rely on Clearwater reports | Add right to rely on Clearwater Phase I/II reports; consider environmental indemnity escrow for identified issues; verify all facilities assessed | High | Open | DD Memo: Environmental (Aug 29, 2022) |
| 14 | Regulatory Compliance / Permits | Art. III, §3.14 | All material permits and licenses held and in good standing; includes FERC licenses, state utility permits, water rights | Critical for infrastructure asset — FERC hydroelectric licenses and state utility permits are value drivers | Ensure FERC licenses specifically represented as transferable; address OPUC and Oregon regulatory requirements | Require specific schedule of FERC licenses with expiration dates and transferability confirmation; tie to FERC §203 approval condition | High | Open | DD Memo: Regulatory Permits (Aug 18, 2022) |
| 15 | Intellectual Property | Art. III, §3.15 | Standard IP reps — ownership, no infringement, adequate licenses | Low risk area for infrastructure platform | No significant gap | Acceptable as drafted | Low | Resolved | DD Memo: IP (Aug 23, 2022) |
| 16 | Employment / Benefits | Art. III, §3.16 | Employee census, benefit plans, no pending labor disputes, WARN Act compliance | ~25 management members in rollover pool; verify CBA status; WARN Act analysis needed | Confirm number of employees across jurisdictions for WARN analysis; CBA review needed | Add specific rep re: management rollover pool terms; confirm no CBA obstacles to closing; WARN Act analysis in progress | Medium | Open | DD Memo: Employment (Aug 26, 2022) |
| 17 | Litigation | Art. III, §3.17 | No pending or threatened actions, suits, or proceedings that would be material; scheduled exceptions | Verify current litigation profile; ensure Portland Water District concession dispute is NOT characterized as litigation but is fully disclosed | Confirm whether concession renegotiation notice triggers disclosure under this representation | Recommend carving the concession renegotiation out of litigation rep and addressing under Material Contracts or separate disclosure; monitor closely | Medium | Open | DD Memo: Litigation (Aug 19, 2022) |
| 18 | Tax | Art. III, §3.18 | Standard tax reps — all returns filed, all taxes paid, no audits pending, no tax liens | Verify with Halstead & Greer; state tax positions in OR, WA, ID need specific attention | Confirm adequacy of tax reps across multi-state operations | Coordinate with Sylvia Hartwell (C&H Tax) and Halstead & Greer; request tax opinion or representation on material tax positions | Medium | Open | Tax Structuring Memo (Jul 20, 2022) |
| 19 | Insurance | Art. III, §3.19 | All material insurance policies current and in force; no pending claims that would reduce coverage below policy limits | Standard; verify adequate coverage for infrastructure assets | No significant gap | Acceptable; cross-check with environmental and property insurance coverage | Low | Resolved | |
| 20 | Absence of Changes (Interim Covenant) | Art. III, §3.20 | Since balance sheet date, business conducted in ordinary course consistent with past practice; no material adverse change | Closely tied to MAE definition — critical given Bull Run concession issue | Must be carefully calibrated with MAE definition in §8.01 | Tie to MAE analysis; ensure interim period operations covenant is comprehensive | High | Open | MAE Analysis — separate memo |
| 21 | Anti-Corruption / FCPA | Art. III, §3.21 | Standard FCPA/anti-bribery reps — no payments to government officials; compliance policies in place | Standard; acceptable given domestic US operations primarily with municipal/state counterparties | No significant gap | Acceptable as drafted; verify scope covers municipal concession relationships | Low | Resolved | |
| 22 | Related Party Transactions | Art. III, §3.22 | All related party transactions disclosed in Schedule 3.22; Weir Family Trust relationships fully disclosed | Verify all Weir family and management relationships are disclosed; particular attention to any service agreements or leases with related parties | Confirm completeness of related party disclosure given CEO's dual role as Weir Family Trust trustee | Review Schedule 3.22 against DD findings; ensure all Weir family relationships disclosed including personal guarantees and management service arrangements | Medium | Open | DD Memo: Corporate Structure (Aug 8, 2022) |
| 23 | Brokers / Finders | Art. III, §3.23 | No broker or finder entitled to fees in connection with transaction except Whitfield Bancorp LLC (seller's advisor) | Standard; acceptable — seller's advisor fees are seller's responsibility | No gap | Acceptable | Low | Resolved | |
| 24 | Data Privacy / Cybersecurity | Art. III, §3.24 | Compliance with applicable data privacy laws; no material data breaches in last 3 years; adequate cybersecurity measures in place | Standard for infrastructure company; low-risk area given limited consumer data | No significant gap | Acceptable; confirm scope covers SCADA and operational technology systems | Low | Resolved |
25
[sheet: Indemnification]
| Issue # | Indemnification Term | EPA Provision | BSP Draft Term | Ironside Parameter / Risk Tolerance | Gap Analysis | C&H Comment / Recommendation | Risk Level | Status | Cross-Reference |
| 1 | General Indemnification Cap | Art. VII, §7.02(a) | 10% of enterprise value = $195,000,000 | Matches R&W insurance coverage limit ($195M); acceptable if R&W insurance provides back-stop | Aligned with R&W insurance; confirm no gaps | Acceptable; coordinate with Northgate Specialty policy to ensure seamless coverage transition from contractual indemnity to insurance | Medium | Open | R&W Insurance Coverage Memo (Aug 31, 2022) |
| 2 | Fundamental Reps Cap | Art. VII, §7.02(b) | 100% of equity purchase price (aggregate seller cap) | Market for fundamental reps (organization, authority, capitalization, tax, brokers) | No gap | Acceptable | Low | Resolved | |
| 3 | Deductible / Basket | Art. VII, §7.03 | Tipping basket: 1% of enterprise value = $19,500,000; once exceeded, recovery from dollar one | Ironside prefers first-dollar coverage above basket; 1% = $19.5M is market for this deal size | Acceptable threshold; confirm whether R&W insurance retention aligns | Verify R&W insurance retention amount aligns with or is lower than basket; negotiate if misaligned | Medium | Open | R&W Insurance Coverage Memo (Aug 31, 2022) |
| 4 | Mini-Basket / De Minimis | Art. VII, §7.03(b) | Individual claims below $250,000 do not count toward basket | Standard; acceptable | No gap | Acceptable | Low | Resolved | |
| 5 | Survival — General Reps | Art. VII, §7.04(a) | 18 months from closing | Ironside prefers 24 months; 18 months is within market range | Potential gap; negotiate upward if possible | Push for 24-month survival; if 18 months accepted, ensure R&W insurance policy period extends beyond | Medium | Open | |
| 6 | Survival — Fundamental Reps | Art. VII, §7.04(b) | Full statute of limitations + 60 days | Market; acceptable | No gap | Acceptable | Low | Resolved | |
| 7 | Survival — Tax Reps | Art. VII, §7.04(c) | Full statute of limitations + 60 days | Market; acceptable | No gap | Acceptable | Low | Resolved | |
| 8 | Survival — Environmental Reps | Art. VII, §7.04(d) | 36 months from closing | Ironside prefers full statute of limitations given infrastructure asset profile | Gap — 36 months may be insufficient for latent environmental claims | Push for extended survival (statute of limitations or at minimum 60 months) given 23-facility portfolio; coordinate with Clearwater Phase II findings | High | Open | DD Memo: Environmental (Aug 29, 2022) |
| 9 | Special Indemnity — Bull Run Concession | Art. VII, §7.05 | BSP draft silent on specific indemnity for concession renegotiation risk | Ironside requires specific indemnity or escrow for potential revenue reduction from Bull Run concession renegotiation (~$64M/yr at risk) | Significant gap — no specific protection for known concession risk | Propose special indemnity for losses arising from Bull Run concession renegotiation with separate cap and extended survival; alternative: escrow mechanism | High | Open | DD Memo: Material Contracts (Aug 22, 2022) |
| 10 | R&W Insurance Interaction | Art. VII, §7.06 | Buyer agrees to pursue R&W insurance before seeking contractual indemnity from sellers for covered reps | Standard for R&W-backed deals; acceptable provided policy has adequate coverage | Confirm policy exclusions do not create uncovered gaps between contractual indemnity limitations and R&W policy exclusions | Map EPA indemnification provisions against Northgate policy exclusions to identify coverage gaps; prepare gap analysis | High | Open | R&W Insurance Coverage Memo (Aug 31, 2022) |
| 11 | Co-Invest Allocation of Indemnification Rights | Art. VII, §7.07 | Pro rata allocation between Fund IV (71.43%) and ICM Co-Invest (28.57%) | Ironside requires clear pro rata allocation; no joint and several exposure beyond its 28.57% share | Confirm no joint and several liability provisions that would expose ICM Co-Invest beyond its pro rata share | Ensure EPA and Co-Investment Allocation Agreement provide explicit pro rata cap on ICM Co-Invest indemnification exposure at 28.57% | High | Open | Reps & Warranties Risk Allocation Memo (Sep 2, 2022) |
| 12 | Exclusive Remedy | Art. VII, §7.08 | Indemnification is exclusive post-closing remedy (except fraud) | Market; acceptable with fraud carve-out | No gap | Acceptable; confirm fraud carve-out is broadly defined | Low | Resolved | |
| 13 | Indemnification Procedures — Notice Requirements | Art. VII, §7.09 | Written notice of claim within 30 days of becoming aware; failure to provide timely notice does not waive right unless prejudicial to indemnifying party | Standard; acceptable — non-prejudicial late notice carve-out is important | No gap | Acceptable; ensure co-invest vehicle receives copies of all indemnification notices | Low | Resolved | |
| 14 | Third-Party Claim Defense | Art. VII, §7.10 | Indemnifying party has right to assume defense of third-party claims; buyer consent required for settlement involving non-monetary relief or admission of liability | Standard; acceptable with buyer consent requirement for non-monetary settlements | No gap | Acceptable; verify consent right extends to co-invest vehicle for claims disproportionately affecting co-invest | Low | Resolved | |
| 15 | Mitigation Obligation | Art. VII, §7.11 | Buyer has obligation to use commercially reasonable efforts to mitigate losses; insurance recoveries offset indemnification payments | Standard; acceptable — mitigation obligation should not be overly burdensome | Confirm mitigation standard is commercially reasonable (not best efforts) | Acceptable as drafted; verify insurance offset provisions do not create perverse incentives to delay insurance claims | Low | Resolved |
[sheet: Closing Conditions]
| Issue # | Closing Condition | EPA Provision | BSP Draft Term | Ironside Parameter / Risk Tolerance | Gap Analysis | C&H Comment / Recommendation | Risk Level | Current Status | Expected Timeline |
| 1 | FERC §203 Approval | Art. VI, §6.01(a) | Condition to all parties — receipt of FERC approval under Federal Power Act §203 for transfer of hydroelectric licenses | Critical condition; non-waivable for Ironside | No gap in condition itself; FERC Docket No. EC22-143-000; application to be filed Oct 19, 2022 | Track FERC timeline; note 18-month lapse provision in FERC orders — if not closed within 18 months, approval lapses and must be re-filed | High | Application to be filed Oct 19, 2022 | Expected review period 60–120 days |
| 2 | OPUC Approval | Art. VI, §6.01(b) | Condition to all parties — receipt of Oregon Public Utility Commission approval for transfer of utility assets | Critical condition; non-waivable | OPUC Docket No. UM-2287; application to be filed Oct 14, 2022 | Track OPUC timeline; review precedent for similar infrastructure transfers in Oregon | High | Application to be filed Oct 14, 2022 | Expected review period 90–180 days |
| 3 | CFIUS Clearance | Art. VI, §6.01(c) | Condition to all parties — CFIUS clearance or expiration of applicable review period | Standard for infrastructure assets; no foreign ownership issues identified | Voluntary notice recommended; no foreign ownership issues expected | Voluntary notice filed; expect acknowledgment by Sept 20, 2022; low risk of adverse finding | Low | Voluntary notice filed | 30–45 day review expected |
| 4 | No Material Adverse Effect | Art. VI, §6.02(a) | Condition to buyer — no MAE shall have occurred since date of EPA | Critical; see MAE definition analysis (separate issue) | MAE definition must be carefully negotiated — see Reps & Warranties sheet, Issue #20, and separate MAE memo | Cross-reference MAE definition; ensure adequate carve-outs do not swallow the condition (particularly re: regulatory changes and concession renegotiation) | High | Open | N/A |
| 5 | Accuracy of Reps & Warranties (Bring-Down) | Art. VI, §6.02(b) | Condition to buyer — seller reps accurate in all material respects at closing (double-materiality scrub where reps are already qualified by materiality) | Standard; acceptable | No gap | Verify bring-down standard is appropriate; monitor for changes during interim period | Medium | Open | At closing |
| 6 | Compliance with Covenants | Art. VI, §6.02(c) | Condition to buyer — sellers have complied with all covenants in all material respects | Standard; acceptable | No gap | Acceptable | Low | Open | At closing |
| 7 | No Injunction | Art. VI, §6.03 | Mutual condition — no law, order, or injunction prohibiting the transaction | Standard; acceptable | No gap | Acceptable | Low | Open | At closing |
| 8 | Financing Condition | Art. VI, §6.02(d) | Condition to buyer — receipt of debt financing on terms substantially consistent with commitment letter | Critical; debt commitment from Atlas National Bank ($650M) and Pinnacle Credit Partners ($325M); commitment letter executed Aug 30, 2022 | Ironside requires certainty of financing; confirm SunGard/limited-conditionality provisions in commitment letter | Coordinate with debt commitment letter review; ensure financing condition in EPA is reverse-break-fee backstopped if financing fails for reasons not attributable to buyer | High | Commitment letter executed Aug 30, 2022 | Commitment valid through Dec 31, 2022 (initial period) |
| 9 | Third-Party Consents | Art. VI, §6.02(e) | Condition to buyer — receipt of specified third-party consents (including counterparty consents under material PPAs and concession agreements) | May be challenging for Bull Run concession given renegotiation notice; verify which consents are closing conditions vs. post-closing covenants | Significant risk — if Bull Run concession counterparty withholds consent or conditions it on renegotiated terms | Identify all required third-party consents; assess risk of consent failure for Bull Run and other municipal contracts; consider whether consent requirement should be post-closing covenant for certain contracts | High | Open | Ongoing |
| 10 | Officer's Certificate | Art. VI, §6.02(f) | Condition to buyer — delivery of officer's certificate by Cascadia CEO and CFO certifying satisfaction of closing conditions | Standard; acceptable | No gap | Acceptable | Low | Open | At closing |
| 11 | R&W Insurance Policy | Art. VI, §6.02(g) | Condition to buyer — R&W insurance policy bound and in effect | Policy bound Sept 1, 2022 (Northgate Specialty Insurance Co.); $195M limit | Confirm policy will remain in effect through closing; address tolling if closing is delayed | Policy bound; monitor for any premium adjustments if closing delayed beyond initial coverage period | Medium | Bound Sept 1, 2022 | In effect |
| 12 | Working Capital Escrow Funding | Art. VI, §6.02(h) | Condition to buyer — sellers to deposit $25M into escrow account at Atlas National Bank for working-capital adjustment | Standard; $25M escrow aligns with transaction summary | No gap | Acceptable; verify escrow agreement terms including release mechanics and dispute resolution | Low | Open | At closing |
| 13 | Idaho Public Utilities Commission Notification | Art. VI, §6.01(d) | Condition to all parties — filing of notification with Idaho PUC (no approval required; notification only for two Idaho wind farms) | Standard notification; lower regulatory risk than FERC/OPUC approvals | No gap; notification requirement only | File notification concurrently with FERC/OPUC applications; monitor for any Idaho PUC inquiry | Low | Open | To be filed Oct 14, 2022 |
| 14 | HSR Act Clearance | Art. VI, §6.01(e) | Condition to all parties — expiration or early termination of HSR Act waiting period | Standard for deal above $101M threshold; filing expected promptly after signing | No antitrust concerns identified; expect early termination | File within 5 business days of signing; request early termination | Low | Open | 30-day waiting period; early termination expected |
[sheet: MAE Definition]
| Issue # | MAE Component | EPA Provision | BSP Draft Language | Ironside Position | Gap Analysis | C&H Comment / Recommendation | Risk Level | Status |
| 1 | Core MAE Definition | §8.01(a) | Any event, change, or effect that, individually or in the aggregate, has had or would reasonably be expected to have a material adverse effect on the business, results of operations, financial condition, or assets of Cascadia and its subsidiaries, taken as a whole | Standard formulation; acceptable | No gap on core definition | Acceptable; focus negotiation on carve-outs | Low | Resolved |
| 2 | General Economic Conditions Carve-Out | §8.01(a)(i) | Changes in general economic or business conditions (unless disproportionately affecting Cascadia relative to comparably situated companies) | Standard; acceptable with disproportionate-impact exception | Confirm disproportionate-impact exception is included | Acceptable with disproportionate-impact exception | Low | Resolved |
| 3 | Industry Conditions Carve-Out | §8.01(a)(ii) | Changes affecting the renewable energy or water infrastructure industry generally (unless disproportionately affecting Cascadia) | Standard; acceptable with disproportionate-impact exception | No gap | Acceptable | Low | Resolved |
| 4 | Regulatory/Legal Changes Carve-Out | §8.01(a)(iii) | Changes in applicable law or regulations (unless disproportionately affecting Cascadia) | Critical — Oregon SB 1567 (2022) cited by Portland Metropolitan Water District as basis for concession renegotiation | Must ensure that specific regulatory changes triggering the Bull Run concession renegotiation are NOT carved out, or that disproportionate-impact exception applies | Negotiate to exclude from carve-out any regulatory change that specifically and disproportionately affects Cascadia's concession agreements; alternative: add specific reference to Oregon SB 1567 | High | Open |
| 5 | Pending Concession Renegotiation | §8.01(a)(vi) (proposed) | BSP draft does not address concession renegotiation specifically | Ironside requires either (a) specific exclusion of Bull Run renegotiation from MAE carve-outs, or (b) separate closing condition addressing concession status | Significant gap — concession renegotiation is known risk with ~$64M annual revenue impact (13.1% of FY 2021 revenue) | Propose specific provision that material adverse changes in terms of the Bull Run Filtration Project concession (or any concession representing >5% of revenue) are not carved out of MAE definition | High | Open |
| 6 | Transaction-Related Carve-Out | §8.01(a)(iv) | Effects arising from the announcement or pendency of the transaction | Standard; acceptable — prevents seller from arguing that customer/employee reactions to the deal itself constitute an MAE | No gap | Acceptable | Low | Resolved |
| 7 | Quantitative Threshold | §8.01(b) (proposed) | BSP draft does not include quantitative threshold for MAE | Ironside would benefit from quantitative guidance but acknowledges this is typically not included | No specific gap; market practice is qualitative standard | Do not propose quantitative threshold (unlikely to be accepted); instead focus on carve-out negotiations, particularly around concession risk | Low | Resolved |
| 8 | Force Majeure / Natural Disaster Carve-Out | §8.01(a)(v) | Changes arising from natural disasters, pandemics, acts of war, terrorism (unless disproportionately affecting Cascadia) | Standard; acceptable given Pacific Northwest natural disaster exposure (seismic, wildfire); disproportionate-impact exception critical | Confirm disproportionate-impact exception covers events affecting Cascadia's specific geographic concentrations (OR, WA, ID) | Acceptable with disproportionate-impact exception; monitor wildfire season risk during interim period given facility locations | Medium | Resolved |
| 9 | Seasonality / Weather Pattern Carve-Out | §8.01(a)(vii) (proposed) | BSP draft includes carve-out for variations in weather patterns affecting hydroelectric generation output | Ironside opposes broad weather carve-out — sustained drought would materially impair hydroelectric revenue (~60% of portfolio) | Gap — carve-out is overly broad; could mask material decline in hydroelectric output | Narrow weather carve-out to exclude only normal seasonal variations consistent with historical patterns; sustained drought or material water supply reduction should NOT be carved out | Medium | Open |
| 10 | Buyer Actions Carve-Out | §8.01(a)(viii) | Changes resulting from any action taken or omitted to be taken by buyer or its affiliates | Standard; acceptable | No gap | Acceptable | Low | Resolved |