FR EA
1026-00003 · Calderwood & Harkness LLP · Diligence
diligence-coordination-memo.docx DOCUMENT Real Estate
18 / 37 ← → ✕
Contract analysis Extract to table

MEMORANDUM

PRIVILEGED & CONFIDENTIAL / ATTORNEY WORK PRODUCT

TO: Angela Fontaine, Partner Douglas Fairchild, Partner

FROM: Cynthia Ho, Lead Associate

CC: Grace Nakamura, Associate

DATE: March 15, 2026

RE: Due Diligence Coordination — Workstream Assignments Acquisition of 450 West 34th Street, New York, NY 10001 by BFO 450 West 34th LLC from Meridian Gateway Holdings LLC

MATTER NO.: 1026-00003

CLIENT: Briarwood Family Office LLC

Right-click to update Table of Contents

I. PURPOSE AND OVERVIEW

The purpose of this memorandum is to memorialize the assignment of due diligence workstreams among the Calderwood & Harkness LLP team and to coordinate with outside consultants and advisors in connection with Briarwood Family Office LLC's ("Briarwood" or the "Client") prospective acquisition of the property located at 450 West 34th Street, New York, NY 10001, designated as Block 754, Lot 42, Borough of Manhattan (the "Property"), a 14-story mixed-use building, from Meridian Gateway Holdings LLC ("Seller" or "Meridian") for a purchase price of One Hundred Twenty Million Dollars ($120,000,000) (the "Purchase Price"). The acquisition will be effectuated through BFO 450 West 34th LLC ("Buyer SPV"), a Delaware limited liability company to be formed, as the purchasing entity.

The executed Letter of Intent (the "LOI") was signed on March 14, 2026, by Theodore R. Ashworth on behalf of Briarwood and by Victor S. Papadopoulos on behalf of Meridian Gateway Holdings LLC. The LOI contemplates a target date for execution of a definitive Purchase and Sale Agreement (the "PSA") of April 11, 2026, which would commence a forty-five (45) calendar day due diligence period ending on May 26, 2026. Accordingly, time is of the essence in organizing and executing the various diligence workstreams described herein.

All due diligence document requests will be directed to Seller's counsel, Hargrove, Pettigrew & Sloane LLP ("HPS"), Attention: Jonathan D. Hargrove, Partner, and Rebecca Tran, Associate, located at 399 Park Avenue, 18th Floor, New York, NY 10022. As of the date of this memorandum, the preliminary due diligence request list (the "DD Request List") has been transmitted to HPS with a ten (10) business day response deadline, making the expected date for receipt of Seller's initial document production March 31, 2026.

This memorandum identifies responsible team members for each workstream, deadlines for preliminary analyses, and critical coordination points with external consultants. It is intended to serve as the central organizational document for the Calderwood & Harkness LLP team throughout the due diligence process. All team members should familiarize themselves with the full scope of the memorandum, as many workstreams have interdependencies that require close coordination.

II. PROPERTY SUMMARY

The following is a summary of the key attributes of the Property based on information available as of the date of this memorandum. Certain data points are derived from the Seller's offering memorandum, preliminary title information, and publicly available records and are subject to verification during due diligence.

Address: 450 West 34th Street, New York, NY 10001

Block/Lot: Block 754, Lot 42, Borough of Manhattan

Building Class: Mixed-use (retail, office, residential)

Gross Building Area: Approximately 186,400 square feet ("SF")

Structure: 14 stories plus cellar; originally constructed in 1928; subject to a substantial renovation program from 2016 through 2020, during which Seller reports approximately $14,200,000 in capital improvements were made to the building systems, common areas, and individual tenant spaces.

Zoning District: C6-4 (as-of-right mixed-use)

Building Composition:

• Floors 1–2 (Retail): Approximately 28,600 SF

• Floors 3–9 (Office): Approximately 97,300 SF

• Floors 10–14 (Residential): 38 units, approximately 42,500 SF

• Cellar (Storage/Mechanical): Approximately 18,000 SF

Current Occupancy: 87.4% overall, broken down as follows:

• Retail: 100% occupied

• Office: 81.2% occupied

• Residential: 94.7% occupied (36 of 38 units)

Financial Overview:

• Annualized In-Place Net Operating Income ("NOI"): $6,960,000

• Implied Capitalization Rate at Purchase Price: 5.80%

• Purchase Price: $120,000,000

• Price Per SF (GBA): Approximately $643.78

Seller Information: Meridian Gateway Holdings LLC, a New York limited liability company. Victor S. Papadopoulos serves as Managing Member and Elena K. Rosenberg serves as Co-Managing Member. Seller acquired the Property on April 14, 2011, for a purchase price of $68,500,000.

Buyer Information: Briarwood Family Office LLC, through acquisition SPV BFO 450 West 34th LLC, a Delaware limited liability company to be formed, with Briarwood Family Office LLC as sole member.

III. TEAM MEMBERS AND GENERAL ROLES

A. Calderwood & Harkness LLP Internal Team

The following table sets forth the Calderwood & Harkness LLP team members assigned to this matter and their respective general roles and primary responsibilities. Detailed workstream assignments for the two associate-level team members are set forth in Sections IV and V below.

Each team member is expected to manage their assigned workstreams proactively, escalating issues to Angela Fontaine as they arise rather than deferring them until the completion of a workstream memorandum. Cynthia Ho will serve as the day-to-day point of coordination for the team and will maintain the master due diligence checklist. Grace Nakamura will report primarily to Cynthia Ho on workstream progress, with direct access to Angela Fontaine on any urgent matters.

B. Client Contacts

The following individuals at Briarwood Family Office LLC are the primary client contacts for this engagement:

• Theodore R. Ashworth, Founder & Managing Principal, Briarwood Family Office LLC, 680 Park Avenue, 9th Floor, New York, NY 10065. Mr. Ashworth is the ultimate decision-maker on the acquisition and will be the signatory on the PSA and closing documents.

• Margaux Ashworth-Levine, Principal & Head of Real Estate Investments, Briarwood Family Office LLC. Ms. Ashworth-Levine oversees the real estate investment portfolio and will be the day-to-day client contact for operational diligence questions, underwriting assumptions, and property management transition matters.

All client communications should be directed to both Mr. Ashworth and Ms. Ashworth-Levine unless otherwise instructed by Angela Fontaine. Substantive communications with the Client should be reviewed by Angela Fontaine before transmission, consistent with the communication protocols set forth in Section XII below.

IV. WORKSTREAM ASSIGNMENTS — CYNTHIA HO

A. Title Review

Cynthia Ho is responsible for obtaining and analyzing the preliminary title report (the "Preliminary Title Report" or "PTR") from Granite State Title Insurance Company ("Granite State"). The assigned title officer is Martin Clearfield, whose office is located at 140 Broadway, 22nd Floor, New York, NY 10005. Cynthia Ho should contact Mr. Clearfield promptly upon issuance of this memorandum to confirm the order for the PTR and establish a timeline for delivery.

The existing owner's title insurance policy is Policy No. GST-2011-04872, issued by Granite State, dated April 14, 2011, with an insured amount of $68,500,000. This policy was issued in connection with Seller's acquisition of the Property. A copy of the existing policy should be requested from Seller's counsel as part of the DD Request List, and the policy should be reviewed in conjunction with the PTR to identify any changes in the state of title since Seller's acquisition.

Based on information currently available, the following key encumbrances are known and will require careful review and analysis:

1. Existing Mortgage. Mortgage in favor of Eastbridge Commercial Bank, N.A. ("Eastbridge"), recorded April 14, 2011, with an original principal amount of $41,100,000. The estimated current payoff balance is approximately $28,700,000. This mortgage is expected to be satisfied at or prior to closing, unless a CEMA transaction is consummated (see Section IV.E below). Cynthia Ho should confirm the precise payoff amount and any prepayment penalties or yield maintenance obligations.

2. UCC-1 Financing Statement. UCC-1 Financing Statement in favor of Eastbridge Commercial Bank, N.A., filed in connection with the existing mortgage. This filing will need to be terminated at or prior to closing, or assigned in connection with a CEMA transaction.

3. Ashford Partners LLC Easement. Easement for vault space in favor of Consolidated Edison Company of New York, Inc. ("Ashford Partners LLC"), recorded at Liber 4823, Page 112. The scope, location, and any operational restrictions imposed by this easement must be carefully reviewed and compared to the survey. This easement is expected to be a standard utility easement but must be confirmed as non-objectionable.

4. Standard NYC Zoning Lot Restrictions. Standard restrictions and declarations related to the zoning lot configuration, if any, must be reviewed for compliance and any limitations on development or transfer of air rights.

Cynthia Ho shall prepare a comprehensive Title Review Memorandum identifying all exceptions appearing on the PTR, classifying each as either (a) a standard or non-objectionable exception, (b) an exception requiring further investigation or clarification, or (c) an objectionable exception requiring clearance prior to closing. The memorandum should also set forth recommended endorsements for the Buyer's title insurance policy at an insured amount of $120,000,000, including but not limited to: comprehensive, access, survey, zoning, contiguity (if applicable), tax lot, and any additional endorsements customarily obtained in transactions of this type and size in New York City. Cynthia Ho should coordinate with Martin Clearfield at Granite State on title clearance requirements, the availability and cost of requested endorsements, and the procedures for a CEMA title endorsement if the CEMA workstream proceeds.

Target Completion: Title Review Memorandum to be completed within ten (10) business days of receipt of the Preliminary Title Report.

B. Survey Review

Cynthia Ho is responsible for reviewing the existing ALTA survey of the Property prepared by Clearview Land Surveyors Inc. ("Clearview"), dated March 2, 2011 (the "Existing Survey"). However, it is noted that the Existing Survey is approximately fifteen (15) years old and is stale for purposes of this transaction. It does not reflect the substantial renovation work performed from 2016 through 2020, and it may not accurately depict current conditions, improvements, or encroachments. Accordingly, it is recommended that the team commission an updated ALTA/NSPS Land Title Survey with Table A items (the "Updated Survey") in accordance with the 2021 Minimum Standard Detail Requirements for ALTA/NSPS Land Title Surveys.

Cynthia Ho should coordinate with Clearview Land Surveyors Inc. to engage them for the Updated Survey as promptly as possible, given that survey work in Manhattan typically requires four to six weeks for completion. The contact at Clearview is to be confirmed; Cynthia Ho should reach out to Clearview's office directly to identify the appropriate project manager for this engagement.

The Updated Survey should be reviewed for the following items, among others:

• Lot area (reported as 20,125 SF) and lot dimensions

• Building footprint and building height

• Encroachments (if any) by or onto the Property, including any encroachments into the public right-of-way

• Location and extent of the Ashford Partners LLC vault space easement referenced in the title report

• Any gap issues between the title description and the survey (metes and bounds versus tax lot description)

• Curb cuts, sidewalk conditions, and access points

• Flood zone classification and designation

• Location of utilities, signage, and any other physical conditions observable from a survey inspection

• Table A items as selected based on lender and title company requirements

Cynthia Ho shall prepare a Survey Review Memorandum upon receipt and review of the Updated Survey, identifying any discrepancies, encroachments, or other issues that may require further investigation or resolution.

Target Completion: Updated Survey to be ordered immediately (engagement to be initiated by March 20, 2026). Survey Review Memorandum to be completed within five (5) business days of receipt of the Updated Survey.

C. Lease Review and Abstraction

Cynthia Ho is responsible for obtaining and reviewing all commercial and residential leases, amendments, assignments, subleases, and related correspondence for the Property. The lease files should be requested from Seller's counsel as part of the DD Request List and should include, at a minimum, all executed leases, amendments, commencement date agreements, landlord consents, estoppel certificates, and subordination, non-disturbance, and attornment agreements ("SNDAs") currently in effect.

Cynthia Ho shall prepare detailed lease abstraction summaries for each of the major commercial tenants. The following table sets forth the key commercial tenancies based on information available from the Seller's offering materials:

Each lease abstraction summary should identify and analyze the following key terms, at a minimum:

• Base rent, percentage rent (if applicable), and rent escalation provisions (including fixed increases, CPI adjustments, or fair market value resets)

• Renewal options (terms, notice requirements, and renewal rent determination)

• Assignment and subletting provisions (consent requirements, recapture rights, profit-sharing)

• Tenant improvement allowances (amount, disbursement conditions, claw-back provisions)

• Co-tenancy clauses (particularly for retail tenants — Harmon & Voss and Solstice Wellness)

• Estoppel certificate and SNDA requirements

• Security deposits (amount, form — cash or letter of credit — and conditions for application or return)

• Free rent or other concession periods (including any outstanding or unexpired concessions)

• Exclusive use provisions (particularly for retail tenants)

• Operating expense and real estate tax pass-through provisions (base year, expense stops, exclusions)

• Casualty and condemnation provisions

• Landlord's maintenance and repair obligations

• Tenant default and cure provisions

• Early termination rights or kick-out clauses

• Right of first refusal or right of first offer for additional space

• Guaranty provisions (personal or corporate guarantees)

Near-Term Rollover Risk: It should be noted that the Calderon Specialty Insurance Digital Media Corp. lease on Floors 6–7 (27,800 SF; $1,529,000 in annual base rent) expires on January 31, 2028, which is less than two years from the anticipated closing date. This represents a significant near-term rollover risk and should be flagged for the Client's attention in the lease abstraction summary and in any discussions regarding underwriting assumptions. Cynthia Ho should investigate whether any renewal discussions or indications of renewal intent have been communicated and request any relevant correspondence from Seller's counsel.

Additionally, the office space on Floors 8–9 has various lease expirations ranging from 2027 to 2029, and the blended nature of the tenancy information suggests multiple smaller tenancies that may present administrative and rollover complexity. Detailed abstractions of each individual lease on these floors should be prepared.

Cynthia Ho should also coordinate the preparation of the form of estoppel certificate to be attached as an exhibit to the PSA and discuss with Angela Fontaine the scope of estoppel delivery requirements (e.g., percentage of tenants by rentable area, specific named tenants).

Target Completion: Lease abstraction summaries to be completed within fifteen (15) business days of receipt of the lease files from Seller's counsel.

D. PSA Drafting

Cynthia Ho is responsible for preparing a buyer's form Purchase and Sale Agreement for the acquisition of the Property. The initial draft should be prepared for review by Angela Fontaine, who will serve as the lead negotiator on the PSA terms with Seller's counsel.

The PSA should incorporate the following key terms, as reflected in the LOI:

• Purchase Price: $120,000,000.

• Deposit Structure: An initial deposit of $6,000,000 to be deposited with the escrow agent within three (3) business days of PSA execution; an additional deposit of $3,000,000 to be deposited upon expiration of the forty-five (45) day due diligence period; total deposits of $9,000,000. The escrow agent shall be Prestige Escrow Services LLC, located at 1 Penn Plaza, Suite 4500, New York, NY 10119. The deposits shall be held in an interest-bearing escrow account, with interest to follow the deposit.

• Due Diligence Period: Forty-five (45) calendar days from PSA execution. Buyer shall have the right to terminate the PSA for any reason or no reason during the due diligence period, in which event the initial deposit (together with all accrued interest) shall be returned to Buyer.

• Target Closing Date: June 30, 2026.

• Outside Closing Date: July 31, 2026.

• Governing Law: State of New York.

Cynthia Ho should prepare the following exhibits to the PSA, among any others that may be required:

1. Form of Bargain and Sale Deed with Covenant Against Grantor's Acts

2. Assignment and Assumption of Leases

3. Bill of Sale (personal property)

4. FIRPTA Non-Foreign Person Certificate (Seller's EIN: 27-6831044)

5. Form of Tenant Estoppel Certificate

6. Title Affidavit (standard New York form for title company requirements)

7. Rent Roll (to be attached as an exhibit based on Seller-provided information)

8. List of Service Contracts

9. Schedule of Permitted Exceptions

The PSA should contain customary buyer-protective provisions, including but not limited to: comprehensive representations and warranties regarding the Property, leases, environmental matters, litigation, and compliance with law; robust indemnification provisions surviving closing; customary conditions to closing (including title, survey, estoppel delivery, absence of material adverse change, and lender approval); Seller's pre-closing operating covenants (including restrictions on new leases, lease modifications, and capital expenditures without Buyer's consent); casualty and condemnation provisions; and assignment rights permitting Buyer to assign the PSA to its SPV or an affiliated entity.

Cynthia Ho should also incorporate provisions addressing the CEMA transaction structure if the CEMA feasibility analysis (Section IV.E) supports proceeding with that approach. The PSA should include a Seller cooperation covenant with respect to the CEMA and obligate Seller to cooperate in the assignment of the existing Eastbridge mortgage.

Target: First draft of the PSA to be delivered to Angela Fontaine for partner review by April 1, 2026.

E. Existing Financing Review and CEMA Feasibility

Cynthia Ho is responsible for analyzing the existing mortgage encumbering the Property in favor of Eastbridge Commercial Bank, N.A. and assessing the feasibility of a Consolidation, Extension, and Modification Agreement ("CEMA") transaction to reduce the mortgage recording tax payable in connection with the Buyer's new financing.

Existing Mortgage Details:

• Lender: Eastbridge Commercial Bank, N.A.

• Original Principal Amount: $41,100,000

• Recording Date: April 14, 2011

• Estimated Current Payoff Balance: $28,700,000 (to be confirmed with Eastbridge)

Proposed New Financing:

• Lender: Pinnacle Federal Savings Bank

• Proposed Senior Mortgage Amount: $78,000,000

MRT Calculation:

• Full MRT on proposed mortgage (without CEMA): $78,000,000 × 2.80% = $2,184,000

• MRT on new money only (with CEMA): ($78,000,000 − $28,700,000) = $49,300,000 × 2.80% = $1,380,400

• Potential CEMA Savings: $803,600

Given the significance of the potential savings ($803,600), the CEMA workstream should be treated as a high priority. Cynthia Ho should:

1. Prepare a draft CEMA request letter to Eastbridge Commercial Bank, N.A. requesting confirmation of the existing mortgage payoff amount and Eastbridge's willingness to participate in a CEMA transaction (including assignment of the existing mortgage to the new lender or to Buyer's designee).

2. Coordinate with Pinnacle Federal Savings Bank (Daniel Ortega, SVP, CRE Lending, located at 245 Park Avenue, 12th Floor, New York, NY 10167) to confirm Pinnacle's willingness to participate in a CEMA structure and to identify any conditions or requirements imposed by Pinnacle in connection with the CEMA.

3. Review the existing mortgage documents (note, mortgage, and any modifications or assignments) to confirm the absence of provisions that would impede a CEMA, such as restrictions on assignment or due-on-sale clauses that cannot be accommodated within the CEMA structure.

4. Identify and address any title insurance requirements or endorsements related to the CEMA, in coordination with Martin Clearfield at Granite State.

5. Assess the Eastbridge processing fee for a CEMA transaction, which is typically in the range of $3,000 to $10,000 for commercial mortgages, and confirm whether Seller or Buyer will bear this cost.

Cynthia Ho shall prepare a CEMA Feasibility Memorandum summarizing the analysis and recommending whether to proceed with the CEMA transaction.

Target Completion: CEMA Feasibility Memorandum to be completed within ten (10) business days.

F. Property Management Agreement Review

Cynthia Ho is responsible for reviewing the existing property management agreement (the "Management Agreement") between Meridian Gateway Holdings LLC, as owner, and Atlas Urban Management Corp. ("Atlas Urban"), as manager (Gerald Fitch, Senior Property Manager, located at 330 West 42nd Street, 7th Floor, New York, NY 10036).

Based on information available from the Seller's offering materials, the key terms of the Management Agreement are as follows:

• Term: Through December 31, 2027

• Management Fee: 4.0% of effective gross income ("EGI"), which amounts to approximately $326,240 per annum based on an EGI of $8,156,000 as defined in the Management Agreement

Cynthia Ho should analyze the following provisions of the Management Agreement:

• Termination-upon-sale provisions: Does the Management Agreement terminate automatically upon a sale of the Property, or does it survive closing and bind the purchaser?

• Change-of-control triggers: Does a change of control of the owner entity constitute an event permitting termination by either party?

• Assignment rights: Can the Management Agreement be assigned to the Buyer SPV without the manager's consent?

• Post-closing obligations: What obligations, if any, survive termination, including but not limited to indemnification, return of records, transition cooperation, and compensation for the remaining term?

• Scope of management services: What services are included in the base management fee, and what services are subject to additional charges?

• Termination for convenience: Does the owner have a right to terminate the Management Agreement for convenience, and if so, what are the notice requirements and any termination fees?

• Insurance and indemnification: What insurance is the manager required to maintain, and what are the mutual indemnification obligations?

Cynthia Ho should advise the Client on Briarwood's options with respect to the Management Agreement post-closing, including: (a) retaining Atlas Urban under the existing Management Agreement for the remaining term; (b) terminating the Management Agreement at or promptly following closing (if permitted) and engaging a replacement manager; or (c) renegotiating the terms of the Management Agreement with Atlas Urban. The memorandum should include a preliminary assessment of market management fees for comparable mixed-use properties in Manhattan for context.

Target Completion: Property Management Agreement Review Memorandum to be completed within ten (10) business days of receipt of the Management Agreement.

G. Insurance Coverage Review

Cynthia Ho is responsible for coordinating with Lockhart & Pryor Insurance Advisors LLC ("Lockhart & Pryor"), the Client's insurance broker, to obtain and review the existing insurance coverage for the Property. The primary contact at Lockhart & Pryor is Nadia Kowalski, Broker, located at 100 William Street, Suite 600, New York, NY 10038.

The current annual insurance cost for the Property is reported to be approximately $312,000. Cynthia Ho should request copies of all existing insurance policies from Seller's counsel and arrange for Lockhart & Pryor to review the following:

• Property/Casualty Insurance: Coverage limits, deductibles, named insureds, valuation basis (replacement cost vs. actual cash value), and scope of covered perils

• General Liability Insurance: Coverage limits, additional insured endorsements, and any exclusions relevant to the mixed-use nature of the Property

• Umbrella/Excess Liability Insurance: Coverage limits and attachment points

• Rent Loss/Business Interruption Insurance: Indemnity period, coverage amount, and any applicable waiting periods

• Flood Insurance: Coverage limits and whether the Property is located in a FEMA-designated flood zone requiring mandatory flood insurance

• Other Coverages: Workers' compensation (if applicable to property management staff), boiler and machinery, terrorism risk insurance (TRIA), and any other specialized coverages

Cynthia Ho should identify any coverage gaps in the existing insurance program, review the insurance requirements that will be imposed by Pinnacle Federal Savings Bank as part of its loan documentation, and advise the Client on post-acquisition coverage needs, including any adjustments to coverage limits to reflect the $120,000,000 acquisition price and the replacement cost of the building.

Target Completion: Insurance Coverage Review Memorandum to be completed within ten (10) business days of receipt of the existing insurance policies.

V. WORKSTREAM ASSIGNMENTS — GRACE NAKAMURA

A. Zoning and Land Use Analysis

Grace Nakamura is responsible for analyzing the zoning compliance of the Property within the C6-4 zoning district, as designated on the New York City Zoning Map. The C6-4 district is a high-density commercial district that permits a wide range of commercial and residential uses as-of-right, which is consistent with the current mixed-use configuration of the Property.

Key Zoning Data:

• Zoning District: C6-4

• Floor Area Ratio (FAR): 10.0 (for both commercial and residential uses)

• Lot Area: 20,125 SF

• Maximum Allowable Buildable Area: 20,125 SF × 10.0 FAR = 201,250 SF

• Existing Built Area: 186,400 SF

• Unused Development Rights (Air Rights): 201,250 SF − 186,400 SF = 14,850 SF

Grace Nakamura should analyze and address the following issues in the Zoning and Land Use Analysis Memorandum:

1. Air Rights Value and Transferability: The Property has approximately 14,850 SF of unused development rights. Grace Nakamura should assess the potential value of these air rights and the feasibility of transferring them to an adjacent or contiguous lot pursuant to the New York City Zoning Resolution, including any applicable zoning lot merger or development rights transfer mechanisms. This analysis should consider whether the air rights represent a material component of the Property's value and whether Briarwood should retain, monetize, or restrict the disposition of these rights.

2. Use Group Compliance: Confirm that the current mixed-use configuration of the Property (retail on Floors 1–2, office on Floors 3–9, and residential on Floors 10–14) is consistent with the permitted use groups under the C6-4 zoning designation. Identify any use group conflicts or non-conforming use issues.

3. Non-Conforming Use Considerations: Determine whether any aspect of the current building use, configuration, or bulk constitutes a legal non-conforming use, a non-complying bulk condition, or a violation of the Zoning Resolution. If any non-conformities are identified, assess the implications for continued use, renovation, and potential future development.

4. Certificate of Occupancy Review: Obtain and review the current Certificate of Occupancy for the Property to confirm that the permitted uses, occupancy classifications, and occupant loads are consistent with the actual use of the building and the information provided by Seller.

5. Special District or Overlay Considerations: Confirm whether the Property is located within any special purpose district, historic district, or zoning overlay that may impose additional requirements or restrictions.

Grace Nakamura should coordinate with Halcyon Planning Associates LLC ("Halcyon"), a land use consulting firm, for a detailed zoning analysis and certificate of occupancy review. The primary contact at Halcyon is Mark Espinoza, AICP, Principal, located at 250 West 57th Street, Suite 1430, New York, NY 10107. An initial conference call with Mr. Espinoza should be scheduled within five (5) business days of this memorandum.

Target Completion: Zoning and Land Use Analysis Memorandum to be completed within fifteen (15) business days. Initial conference call with Halcyon to be scheduled within five (5) business days.

B. Violations and Compliance Search

Grace Nakamura is responsible for conducting comprehensive violation and compliance searches for the Property with the following New York City agencies:

• Department of Buildings ("DOB"): Search for open building permits, violations, stop work orders, and complaints

• Environmental Control Board ("ECB"): Search for open ECB violations and outstanding fines

• Housing Preservation and Development ("HPD"): Search for open housing code violations (particularly relevant given the 38 residential units on Floors 10–14)

• Fire Department of the City of New York ("FDNY"): Search for fire code violations, inspection records, and any outstanding compliance orders

The searches should be conducted for 450 West 34th Street, Block 754, Lot 42, Borough of Manhattan. Grace Nakamura should utilize the New York City Buildings Information System ("BIS"), the ECB violation search portal, the HPD Online system, and any other publicly available databases, supplemented by formal information requests as necessary.

For each identified violation, Grace Nakamura should determine:

• Whether the violation is open or resolved

• The nature and severity of the violation (immediately hazardous, hazardous, or non-hazardous for HPD violations; Class 1, 2, or 3 for DOB violations)

• Any pending administrative actions, hearings, or litigation

• Outstanding fines and penalties, including any accruing penalties for unresolved violations

• Required remediation work and estimated costs

Based on the results of the violation searches, Grace Nakamura should recommend Seller cure obligations to be negotiated as part of the PSA, including whether Seller should be required to cure all open violations prior to closing, indemnify Buyer for the cost of curing post-closing, or provide a credit against the Purchase Price. Grace Nakamura should also recommend appropriate representations and warranties to be included in the PSA regarding the violation status of the Property.