PRIVILEGED & CONFIDENTIAL — ATTORNEY-CLIENT COMMUNICATION
CALDERWOOD & HARKNESS LLP 311 South Wacker Drive, Suite 4800 Chicago, Illinois 60606
April 22, 2024
VIA EMAIL AND FIRST-CLASS MAIL
PRIVILEGED & CONFIDENTIAL ATTORNEY-CLIENT COMMUNICATION
Dr. Raymond Alcázar Executive Director Metropolitan Transit Development Corporation 550 West Adams Street, 14th Floor Chicago, Illinois 60661
Patricia Ng, Esq. General Counsel Metropolitan Transit Development Corporation 550 West Adams Street, 14th Floor Chicago, Illinois 60661
Re: Status Update — Agency-Level Bid Protest, Protest No. IDOT-BPC-2022-0047 RFP No. IDOT-TS-2022-014 — Illinois Integrated Transit Modernization Program (IITMP) Calderwood & Harkness Matter No. 1031-00003
Dear Dr. Alcázar and Ms. Ng:
I. Purpose of Letter
We write to provide the Metropolitan Transit Development Corporation ("MTDC") with a comprehensive status update on MTDC's pending agency-level bid protest challenging the award of the $247.6 million Illinois Integrated Transit Modernization Program ("IITMP") contract to Pinnacle Transit Solutions, Inc. ("Pinnacle") under Request for Proposals No. IDOT-TS-2022-014 ("RFP"). The protest, filed as Protest No. IDOT-BPC-2022-0047, remains pending before the Illinois Department of Transportation ("IDOT") Administrative Review Board.
The purpose of this letter is fourfold. First, we summarize the current posture of the protest proceedings and explain the prolonged dormancy that has characterized the matter since ALJ Odum took the protest under advisement on December 2, 2022. Second, we present the options available to MTDC for escalating its challenge beyond the administrative level, including the filing of a complaint in the Illinois Court of Claims asserting constructive denial and/or the pursuit of mandamus relief to compel agency action. Third, we provide updated information regarding fees incurred to date and estimated costs for each escalation path. Fourth, we set forth our recommendation concerning the appropriate next steps and the timeline for implementing those steps.
In light of the extraordinary delay in this matter — now exceeding sixteen months since the protest was taken under advisement with no indication that a decision is forthcoming — we respectfully request that MTDC authorize a client conference at the earliest practicable date to discuss the path forward and to provide the engagement team with the authorizations necessary to begin preparing for potential judicial escalation.
II. Summary of Protest Proceedings to Date
A. Filing and Initial Proceedings
On August 8, 2022, Calderwood & Harkness filed a formal agency-level bid protest on behalf of MTDC with the IDOT Office of Chief Counsel, pursuant to Section 20-80 of the Illinois Procurement Code, 30 ILCS 500/20-80, and the implementing regulations set forth at 44 Ill. Admin. Code § 1.5530. The protest challenges the Source Selection Decision issued on July 14, 2022, by Deputy Secretary Angela Moreau, who served as the Source Selection Authority ("SSA") for the IITMP procurement. The SSA's decision awarded the IITMP contract to Pinnacle Transit Solutions, Inc. notwithstanding MTDC's demonstrably superior aggregate evaluation score.
The evaluation results, as documented in the Source Selection Decision and the underlying Technical Evaluation Panel ("TEP") consensus scoring memorandum, are as follows. MTDC received an aggregate score of 923 out of a possible 1,000 evaluation points, reflecting superior performance across all four evaluation factors identified in RFP Section M. Pinnacle received an aggregate score of 893 out of 1,000 points. MTDC thus held a 30-point advantage over Pinnacle across the full spectrum of evaluated criteria — a meaningful and, in our view, dispositive scoring differential in a best-value procurement of this magnitude.
In addition to its superior technical score, MTDC's proposal was significantly less expensive. MTDC's total evaluated price was $234.9 million, while Pinnacle's total evaluated price was $247.6 million — a price differential of $12.7 million, meaning Pinnacle's proposal was approximately 5.4% more expensive than MTDC's. Under standard best-value tradeoff methodology, an agency may select a higher-priced, lower-scored offeror only where the record demonstrates a rational, well-documented basis for concluding that the technical advantages of the higher-priced proposal justify the additional cost. Here, the SSA selected the proposal that was both lower-scored and higher-priced, a result that we believe is fundamentally inconsistent with applicable procurement principles.
The protest was formally acknowledged by IDOT Chief Counsel Nadine Pryor on August 22, 2022, confirming receipt and docketing of the protest under Protest No. IDOT-BPC-2022-0047. On September 12, 2022, Pinnacle Transit Solutions, through its counsel of record, Victoria Hartley and David Nassim of Brannick, Hartley & Voss LLP, filed a timely petition to intervene as the awardee in the protest proceedings. The Administrative Review Board granted Pinnacle's intervention as a matter of course.
B. Briefing and Oral Argument
On September 30, 2022, IDOT produced the Agency Report and accompanying Protest File, comprising approximately 2,400 pages of documentation. The Agency Report and Protest File included, among other materials, the complete Source Selection Decision, the TEP consensus scoring memoranda for all evaluated proposals, the SSA's tradeoff analysis, the Independent Government Cost Estimate ("IGCE"), relevant correspondence, and the organizational conflict of interest screening records. IDOT's interests in the protest proceedings are represented by Assistant Attorney General Martin Czarnecki of the Illinois Attorney General's Office, Procurements & Contracts Division.
Calderwood & Harkness filed MTDC's Comments on the Agency Report on October 14, 2022. The Comments comprehensively addressed each of MTDC's five grounds for protest, supported by detailed analysis of the Agency Report and Protest File, citations to the applicable evaluation criteria as set forth in the RFP, and expert analysis provided by Linden Analytics Group, LLC regarding the cost-realism deficiencies in Pinnacle's proposal. Brannick, Hartley & Voss filed Pinnacle's Intervenor Response on October 28, 2022, opposing the protest on all grounds.
Oral argument was held before Administrative Law Judge Terrence Odum on November 15, 2022. All parties participated through counsel, and ALJ Odum posed detailed questions to each side regarding the SSA's tradeoff rationale, the alleged reliance on unstated evaluation criteria, and the scope and nature of the organizational conflict of interest involving Pinnacle's subcontractor. Following the conclusion of oral argument, ALJ Odum issued a brief procedural order on December 2, 2022, taking the matter "under advisement" and indicating that a decision would be forthcoming. The order did not specify a deadline or projected timeline for the Board's decision.
It is important to note that contract performance has not commenced. The RFP contemplated an October 1, 2022 start date for the IITMP contract, but that date was not met due to the automatic stay of contract performance triggered by the filing of the protest. To our knowledge, the stay remains in effect and no performance has been authorized.
C. Five Protest Grounds
For the Board's reference and for completeness of this record, we briefly recite the five grounds upon which MTDC's protest is predicated:
Ground 1 — Unreasonable Best-Value Tradeoff Decision. The SSA's best-value tradeoff determination was unreasonable, arbitrary, and unsupported by the record. The SSA failed to provide a rational explanation for why Pinnacle's proposal — which scored 30 points lower than MTDC's across all four evaluation factors and was $12.7 million more expensive — represented the best value to the State. The Source Selection Decision does not articulate a coherent basis for the tradeoff that would justify selecting a lower-scored, higher-priced offeror, and the conclusory language in the decision document fails to satisfy the requirement for a documented, reasoned analysis.
Ground 2 — Reliance on Unstated Evaluation Criteria. The SSA relied on evaluation considerations not identified in the RFP's evaluation criteria. Specifically, the Source Selection Decision references Pinnacle's "workforce integration methodology" as a distinguishing feature warranting the tradeoff, yet "workforce integration methodology" was not identified as a subfactor, element, or consideration under any of the four evaluation factors set forth in RFP Section M. The introduction of this unstated criterion prejudiced MTDC by evaluating proposals against standards that offerors were not on notice to address.
Ground 3 — Organizational Conflict of Interest. Pinnacle's subcontractor, Northlake Signal Systems, Inc. ("Northlake"), performed advisory services for IDOT's Bureau of Transit Operations under Contract No. IDOT-PSC-2020-0189, a $1.85 million professional services contract performed from June 2020 through August 2021. The scope of that advisory contract included system architecture analysis and operational requirements development for the very transit modernization initiatives that became the subject of the IITMP procurement. Northlake's prior advisory role provided Pinnacle with an unfair competitive advantage, including access to nonpublic information regarding IDOT's priorities, system requirements, and evaluation approach. IDOT failed to identify, evaluate, or mitigate this organizational conflict of interest as required by applicable procurement regulations.
Ground 4 — Failure to Conduct Adequate Cost-Realism Analysis. IDOT failed to perform an adequate cost-realism analysis of Pinnacle's cost-reimbursable line items. Pinnacle's proposed costs for the cost-reimbursable elements of the contract totaled $38.4 million, which was $10.8 million — or approximately 21.95% — below the IDOT Independent Government Cost Estimate of $49.2 million for those same line items. A cost deviation of this magnitude raises serious concerns regarding the realism and performability of Pinnacle's proposal, yet the record reflects no meaningful analysis by the evaluators or the SSA of whether Pinnacle's understated costs reflected a genuine efficiency advantage or, rather, a misunderstanding of the scope of work or an unrealistically low staffing plan that would jeopardize contract performance. The failure to conduct this analysis was prejudicial to MTDC, whose cost-reimbursable line items were priced in close alignment with the IGCE.
Ground 5 — Procedural Irregularity Regarding TEP Members. Two members of the Technical Evaluation Panel — Dr. Franklin Yee and Constance Hartigan — had prior professional relationships with Pinnacle's Chief Executive Officer, Marcus Ellerbee, through their mutual participation in the Midwest Transportation Technology Consortium ("MTTC"). These relationships, which included co-authored publications, joint conference presentations, and service on MTTC technical committees, created an appearance of bias or, at minimum, warranted disclosure and review under IDOT's conflict-of-interest protocols. No disclosure was made, and no review was conducted, constituting a procedural irregularity that taints the integrity of the evaluation process.
III. Current Dormant Status
A. Extended Delay Without Decision
As of the date of this letter, more than sixteen months have elapsed since ALJ Odum took the matter under advisement on December 2, 2022. During that entire period, the IDOT Administrative Review Board has not issued a substantive ruling, an interim order, a request for supplemental briefing, or any other action indicating that the protest is under active consideration. The matter has, for all practical purposes, remained completely dormant since the close of oral argument.
The length of this delay is extraordinary. In our firm's extensive experience representing offerors in agency-level bid protests before IDOT and other Illinois state agencies, we are not aware of a comparable instance in which a fully briefed and argued protest of this significance has remained unresolved for such an extended period. For a procurement of the magnitude of the IITMP contract — involving a potential award value of up to $310 million, significant federal funding, and a contract that directly affects transit modernization across a six-county metropolitan service area — the Board's failure to issue a timely decision is deeply troubling and, in our view, unprecedented.
B. Status Inquiries
Calderwood & Harkness has undertaken sustained and systematic efforts to obtain information regarding the status of the protest. We have submitted four formal status inquiry letters to Chief Counsel Nadine Pryor at the IDOT Office of Chief Counsel, as follows:
First Inquiry — February 17, 2023. Approximately two and one-half months after ALJ Odum took the matter under advisement, we submitted our first formal status inquiry requesting an estimated timeline for the Board's decision and noting that the protest stay was preventing the commencement of contract performance.
Second Inquiry — June 9, 2023. Approximately six months after the advisement order, we submitted a second inquiry, reiterating our request for a projected decision date and noting the growing impact of the delay on MTDC's programmatic objectives and financial position.
Third Inquiry — November 3, 2023. Approximately eleven months after the advisement order, we submitted a third, more strongly worded inquiry, expressing MTDC's serious concern regarding the extended delay and requesting that the Board prioritize the issuance of its decision.
Fourth Inquiry — March 15, 2024. Approximately fifteen months after the advisement order, we submitted a fourth inquiry that, in addition to renewing our prior requests, formally reserved MTDC's right to seek judicial review in the Illinois Court of Claims under 705 ILCS 505 and in any other applicable forum, on the ground that the Board's prolonged failure to act may constitute a constructive denial of the protest.
None of these four inquiries has produced a substantive response from the IDOT Office of Chief Counsel. We have received only formulaic acknowledgments of receipt without any indication of a projected timeline for the Board's decision, any explanation for the delay, or any assurance that the matter remains under active consideration. A copy of our most recent inquiry letter, dated March 15, 2024, is enclosed with this letter for your reference.
C. Impact of Delay on MTDC
The continued delay in resolving the protest is causing significant and compounding harm to MTDC's interests in several respects.
First, the IITMP contract, which contemplated a seven-year base performance period commencing October 1, 2022, and running through September 30, 2029, with two three-year option periods (through September 30, 2032, and September 30, 2035, respectively), remains unexecuted. The total maximum contract value, including the base period and both option periods, is up to $310 million. Every month that passes without contract execution is a month of transit modernization that is not being delivered to the public.
Second, the contract is funded through a combination of three sources: a Federal Transit Administration ("FTA") Capital Investment Grant in the amount of $148.5 million, representing approximately 60% of the base award value; State of Illinois General Revenue Fund appropriations in the amount of $74.3 million, representing approximately 30% of the base award value; and IDOT Transit Modernization Fund bond proceeds in the amount of $24.8 million, representing the remaining 10% of the base award value. The continued delay creates risk with respect to the availability and durability of these funding sources, particularly the FTA Capital Investment Grant, which may be subject to time-limited availability or reallocation to other projects if the IITMP contract does not proceed within a reasonable timeframe.
Third, MTDC's proposal development costs of approximately $3.2 million remain unrecovered. These costs were incurred in reliance on the reasonable expectation that the procurement would be conducted fairly and decided within a reasonable time. MTDC is a public entity with a responsibility to steward its resources prudently, and the prolonged immobilization of $3.2 million in sunk proposal costs without resolution is an unjustifiable burden.
Fourth, MTDC's estimated lost profits on the contract, as analyzed by our expert consultant, Dr. Alicia Fernwood of Linden Analytics Group, LLC, are approximately $18.7 million over the seven-year base performance period. This estimate was calculated by applying an 8% profit margin — consistent with industry norms for contracts of this type and scale — to MTDC's total proposed price of $234.9 million. The loss of this revenue stream has material implications for MTDC's financial planning, workforce retention, and ability to invest in the technical capabilities that would be deployed under the IITMP contract.
Fifth, the continued delay erodes MTDC's ability to deploy the transit modernization technologies contemplated in its proposal across its six-county service area, which encompasses Cook, DuPage, Kane, Lake, McHenry, and Will Counties. The transit systems and riding public in these counties are the ultimate beneficiaries of the IITMP program, and every month of delay is a month in which those communities are deprived of the modernization improvements that Congress and the State of Illinois have funded.
IV. Options for Escalation
In light of the foregoing, Calderwood & Harkness has identified three principal options available to MTDC for advancing its challenge, which we present below with an assessment of the advantages, disadvantages, estimated costs, and our recommendation for each.
Option 1: Continue to Await Agency Decision
Description. Under this option, MTDC would maintain the current status quo and continue to wait for ALJ Odum and the IDOT Administrative Review Board to issue a decision on the pending protest. Calderwood & Harkness would continue to submit periodic status inquiries and monitor the docket for any developments.
Advantages. This approach preserves MTDC's administrative remedies in their entirety and avoids any argument by IDOT or Pinnacle that MTDC prematurely bypassed the agency process. It also avoids the significant additional litigation expense that would be associated with judicial escalation. There remains a possibility, however difficult to assess, that the Board will issue a decision in MTDC's favor on one or more of the five protest grounds, rendering further action unnecessary.
Disadvantages. There is no indication of when, if ever, the Administrative Review Board will issue a decision. Sixteen months of inaction, coupled with the absence of any substantive response to four formal status inquiries, suggests that the protest may have been effectively shelved. Continued delay prejudices MTDC's programmatic interests, financial position, and ability to recover its proposal development costs and lost profits. The passage of time also creates the risk that the evidentiary record may grow stale, that key witnesses may become unavailable, and that the relevance of the underlying procurement may diminish. Additionally, there is a risk — however remote under the current protest stay — that the procuring agency may attempt to proceed with contract performance notwithstanding the pending protest, particularly if political or programmatic pressures mount.
Incremental Cost. Minimal — primarily limited to the preparation and submission of periodic status inquiry letters and ongoing monitoring of the docket by the Calderwood & Harkness engagement team.
Assessment. This is a passive approach that, in our professional judgment, is not recommended as a sole strategy given the extraordinary length of the delay and the absence of any indication that a resolution is imminent. While MTDC should not foreclose the possibility that the Board may act, relying exclusively on that possibility is imprudent under the circumstances.
Option 2: File a Complaint in the Illinois Court of Claims Asserting Constructive Denial
Description. Under this option, MTDC would file a complaint in the Illinois Court of Claims, located at 630 South College Street, Springfield, Illinois 62756, challenging the contract award to Pinnacle and asserting that the Administrative Review Board's failure to act on the protest for more than sixteen months constitutes a constructive denial of the protest. The complaint would present MTDC's substantive challenges to the award on all five protest grounds and seek both injunctive and monetary relief.
Legal Basis. The complaint would be brought pursuant to the Illinois Court of Claims Act, 705 ILCS 505, which provides jurisdiction over claims against the State of Illinois. MTDC's theory of jurisdiction rests on the constructive denial / exhaustion doctrine, under which a state agency's prolonged failure to act on a pending administrative matter may be treated as a final agency action amenable to judicial review. The rationale for this doctrine is straightforward: a party cannot be held hostage to an administrative process that the agency has effectively abandoned. The agency's prolonged inaction deprives the aggrieved party of the very administrative remedy that would otherwise need to be exhausted before seeking judicial relief, and the doctrine treats this functional denial of a remedy as equivalent to a formal denial for purposes of judicial review.
Standing. MTDC, as the highest-scored disappointed offeror in the IITMP procurement, has a direct and substantial economic interest in the outcome of the procurement and the resolution of the protest. MTDC invested approximately $3.2 million in proposal development costs, holds an estimated $18.7 million in potential lost profits, and would be the contract awardee but for the challenged Source Selection Decision. MTDC's standing to challenge the award is, in our view, beyond reasonable dispute.
Statute of Limitations. We have carefully analyzed the applicable statutes of limitation and time bars that could affect MTDC's ability to bring a Court of Claims action. Because the IDOT Administrative Review Board has not issued a formal final decision on the protest, no limitations clock has commenced running from a final agency action. The constructive denial theory preserves MTDC's timeliness precisely because the agency's failure to act has prevented the ripening of a final, appealable decision. Nevertheless, prudence dictates that MTDC file its complaint sooner rather than later in order to avoid any argument by IDOT or Pinnacle that MTDC's delay in seeking judicial relief — separate from the agency's delay in deciding the protest — constitutes laches or an unreasonable delay that should bar the claim. The longer MTDC waits after it becomes apparent that the agency is unlikely to act, the greater the risk that such an argument could gain traction.
Scope of Judicial Review. The Court of Claims will review IDOT's best-value tradeoff determination and the related procurement decisions under the well-established arbitrary-and-capricious / abuse-of-discretion standard. Under this standard, MTDC is not required to prove that its proposal was objectively superior — although the evaluation record strongly supports that conclusion — but rather that the SSA's decision to select Pinnacle lacked a rational basis, was unsupported by the record, or violated applicable procurement statutes, regulations, or the terms of the RFP. Given the 30-point scoring differential, the $12.7 million price premium of Pinnacle's proposal, the reliance on unstated evaluation criteria, the unmitigated organizational conflict of interest, and the cost-realism deficiency, we believe MTDC's challenge presents a compelling case on this standard.
Potential Relief. The Court of Claims may award a range of remedies, including: (i) injunctive relief to prevent IDOT from executing the IITMP contract with Pinnacle or from authorizing Pinnacle to commence performance; (ii) a declaratory judgment that the SSA's award to Pinnacle was unlawful and must be set aside; and (iii) monetary damages, including MTDC's proposal preparation costs of approximately $3.2 million and, potentially, lost profits of approximately $18.7 million, subject to the applicable standards for proving lost profits with reasonable certainty.
Preliminary Injunction. In conjunction with filing the complaint, MTDC may seek a preliminary injunction to prevent Pinnacle from commencing performance during the pendency of the litigation. To obtain a preliminary injunction, MTDC must demonstrate: (i) a likelihood of success on the merits of its substantive claims; (ii) that MTDC will suffer irreparable harm absent injunctive relief; (iii) that the balance of hardships favors MTDC; and (iv) that the issuance of an injunction is in the public interest. We believe MTDC can make a strong showing on all four factors, particularly in light of the evaluation scoring and pricing differentials and the significant public investment in the IITMP program.
Advantages. Filing a Court of Claims complaint moves the matter forward decisively after sixteen months of administrative inaction. It engages a neutral judicial decision-maker with the authority to adjudicate MTDC's claims on the merits and to award the full range of injunctive and monetary relief. It signals to IDOT that MTDC is serious about protecting its rights and will not acquiesce to indefinite delay. It also creates a formal, enforceable timeline for the resolution of the dispute through the court's case management procedures.
Disadvantages. This option entails significant additional legal costs, as detailed below. The litigation timeline, while more predictable than the current administrative limbo, is likely to extend over a period of twelve to twenty-four months, depending on the scope of discovery, motion practice, and the court's docket. IDOT and Pinnacle may argue that MTDC has failed to exhaust its administrative remedies, though the constructive denial doctrine is specifically designed to address this objection in circumstances such as these.
Estimated Incremental Fees. We estimate that Calderwood & Harkness's fees for the Court of Claims litigation phase will range from $750,000 to $1,200,000, depending on the complexity of discovery, the extent of motion practice (including any preliminary injunction proceedings), and whether the matter proceeds to trial. In addition, Linden Analytics Group, LLC has provided an authorized fee estimate of $85,000 for litigation-phase consulting support, including the preparation of Dr. Fernwood's expert report on cost realism, lost profits, and damages quantification.
Assessment. This is our recommended approach if no agency decision is received within sixty (60) days of this letter. The Court of Claims complaint provides the most comprehensive and effective remedy available to MTDC and is proportionate to the magnitude of MTDC's financial exposure and the significance of the IITMP contract.
Option 3: Seek Mandamus or Other Judicial Relief to Compel Agency Action
Description. Under this option, MTDC would file a mandamus petition or similar extraordinary writ action in an appropriate Illinois court to compel the IDOT Administrative Review Board to issue a decision on the pending protest within a time certain. This approach does not seek to bypass the administrative process but instead seeks to enforce the agency's obligation to act within a reasonable time.
Legal Basis. Under Illinois mandamus principles, a court may issue a writ of mandamus to compel a public officer or body to perform a ministerial duty that is clearly imposed by law. MTDC would argue that the Administrative Review Board has a clear legal duty to render a decision on a duly filed protest within a reasonable time, that the Board has failed to perform this duty for more than sixteen months despite a fully briefed and argued record, and that MTDC has no other adequate remedy at law to compel the Board's action.
Advantages. A mandamus action is a narrower and potentially faster proceeding than a full Court of Claims complaint. It may be filed and adjudicated on a relatively expedited basis. It preserves the administrative remedy by compelling the Board to act rather than bypassing the administrative process, which may reduce the risk of an exhaustion defense in any subsequent judicial review. If successful, it could result in the Board issuing a decision on the merits — potentially in MTDC's favor — without the need for full-scale litigation.
Disadvantages. A mandamus action does not guarantee a favorable outcome on the merits of the protest. Even if the court compels the Board to act, the Board's decision could sustain the award to Pinnacle, requiring MTDC to pursue further judicial review. The action may be rendered moot if the Board issues a decision shortly after the mandamus petition is filed. Additionally, while narrower in scope, a mandamus proceeding may be perceived as confrontational by the agency without independently resolving the underlying substantive challenge to the award.
Estimated Incremental Fees. We estimate that Calderwood & Harkness's fees for the mandamus proceeding would range from $100,000 to $200,000, significantly lower than the estimated cost of a full Court of Claims complaint.
Assessment. Mandamus may be pursued in conjunction with, or as a precursor to, Option 2. It is a viable interim step that may produce a faster result, but it does not independently resolve MTDC's substantive claims. If the Board issues an unfavorable decision in response to a mandamus order, MTDC would still need to seek judicial review of that decision, potentially in the Court of Claims.
Combined Approach. We note that Options 2 and 3 are not mutually exclusive, and MTDC may pursue both in parallel or in sequence. MTDC could, for example, seek mandamus to compel the Board's decision while simultaneously preparing the Court of Claims complaint as a backstop in the event that the Board fails to act or issues an unfavorable decision.
After careful consideration, Calderwood & Harkness recommends the following staged approach:
1. Allow sixty (60) days from the date of this letter — i.e., through June 21, 2024 — for the Administrative Review Board to respond to our March 15, 2024 status inquiry or to issue a decision on the pending protest.
2. During that sixty-day period, authorize the Calderwood & Harkness engagement team to begin preparation of the Court of Claims complaint and supporting filings so that they are ready for prompt filing if the deadline passes without agency action.
3. If no decision is forthcoming by June 21, 2024, proceed directly with Option 2 — the filing of a complaint in the Illinois Court of Claims asserting constructive denial — as the primary vehicle for resolving MTDC's challenge.
4. Reserve the mandamus alternative for deployment if circumstances warrant, such as if the Court of Claims raises threshold questions regarding exhaustion that might be addressed by first obtaining a mandamus order compelling the Board to act.
We believe this staged approach appropriately balances MTDC's interest in obtaining a prompt resolution against the need to preserve all available administrative and judicial remedies.
V. Financial Summary and Fee Estimates
A. Fees Incurred to Date
As of December 31, 2023, the total fees incurred by Calderwood & Harkness in connection with this matter are $487,350. This amount reflects all work performed from the commencement of the engagement through the filing of the protest, preparation of MTDC's Comments on the Agency Report, oral argument before ALJ Odum, and the four formal status inquiry letters submitted during the dormancy period.
The current billing rates for the Calderwood & Harkness engagement team members are as follows:
In addition, Linden Analytics Group, LLC, retained as MTDC's expert consultant on cost-realism analysis and damages quantification, has fully incurred its protest-phase flat fee of $145,000. This fee covered Dr. Alicia Fernwood's preparation of the cost-realism analysis supporting Protest Ground 4, her review of the Agency Report and Protest File, and her preparation of the preliminary lost-profits analysis.
We also note that MTDC separately engaged Strickland & Associates CPAs for cost-realism certifications and pricing backup in connection with MTDC's proposal preparation. Those costs are not reflected in the figures above as they were incurred directly by MTDC outside of the Calderwood & Harkness engagement.
B. Estimated Additional Fees for Litigation Escalation
Should MTDC elect to proceed with the Court of Claims litigation (Option 2), we estimate that Calderwood & Harkness's additional fees for the litigation phase will range from $750,000 to $1,200,000. The range reflects uncertainty regarding the scope of discovery that the Court of Claims may authorize, the extent of motion practice (including any preliminary injunction proceedings and dispositive motions), and whether the matter proceeds to trial or is resolved through summary judgment or settlement.
In addition, Linden Analytics Group, LLC has provided an authorized fee estimate of $85,000 for litigation-phase consulting support, including the preparation of a formal expert report, deposition preparation, and potential trial testimony by Dr. Fernwood. This fee has been authorized but has not yet been incurred.
The total estimated all-in cost for the combined protest and litigation phases (Calderwood & Harkness fees only) is therefore approximately $1,237,350 to $1,687,350, calculated as follows:
These estimates are subject to revision based on the actual scope of discovery, motion practice, and trial requirements that may arise during the litigation. We will provide updated estimates as the litigation progresses and will seek MTDC's authorization before incurring fees materially in excess of these estimates.
C. MTDC's Financial Exposure and Recovery Potential
We summarize below MTDC's financial exposure and recovery potential in connection with this matter:
• Proposal Development Costs: Approximately $3.2 million. These costs are potentially recoverable as damages in a Court of Claims action, representing the out-of-pocket expenditure that MTDC incurred in reasonable reliance on the expectation that the procurement would be conducted fairly and in accordance with applicable law.
• Estimated Lost Profits: Approximately $18.7 million over the seven-year base performance period, calculated by applying an 8% profit margin to MTDC's $234.9 million proposal price. Lost profits are potentially recoverable, subject to proof of causation and reasonable certainty of the profit amount, as supported by Dr. Fernwood's expert analysis.
• MTDC's Annual Operating Budget: $1.82 billion. The litigation investment contemplated herein, even at the high end of the estimated range, represents a small fraction of MTDC's annual operating budget and is proportionate to the amounts at stake.
• Contract Value at Stake: $234.9 million (base period); up to $310 million (including option periods). The magnitude of the contract value underscores the significance of this matter to MTDC and the importance of pursuing all available remedies to protect MTDC's interests.
In our assessment, the litigation investment is proportionate to the amounts at stake and to the strength of MTDC's claims. The potential recovery of $3.2 million in proposal preparation costs alone would substantially offset the cumulative legal fees, and the potential recovery of $18.7 million in lost profits would provide a significant return on the litigation investment.
VI. Recommendation
Based on the foregoing analysis, Calderwood & Harkness makes the following recommendations:
First, we recommend that MTDC authorize the filing of a complaint in the Illinois Court of Claims asserting constructive denial of the bid protest if the IDOT Administrative Review Board does not issue a decision on the pending protest within sixty (60) days of the date of this letter — that is, by no later than June 21, 2024. This deadline provides the Board with a final, reasonable opportunity to act while establishing a clear trigger for judicial escalation.
Second, in the interim, we recommend that MTDC authorize the engagement team to begin preparation of the Court of Claims complaint and supporting filings — including the complaint itself, the motion for a preliminary injunction, and the supporting declarations and memoranda of law — so that these documents are finalized and ready for prompt filing if the sixty-day period expires without agency action. This preparatory work will enable MTDC to act decisively and without further delay once the deadline passes.
Third, we recommend that MTDC consider whether to simultaneously pursue mandamus relief to compel the Administrative Review Board to issue its decision, though we view the Court of Claims complaint as the more comprehensive and effective remedy. If MTDC determines that mandamus should be pursued, whether as a standalone action or in conjunction with the Court of Claims complaint, we are prepared to undertake that filing as well.
Fourth, we wish to reaffirm our confidence in the strength of MTDC's protest. We remain of the view that MTDC's challenge is meritorious on multiple independent grounds, and we believe that judicial review will vindicate MTDC's position. We are particularly confident in the strength of Ground 1 (unreasonable best-value tradeoff) and Ground 4 (failure to conduct adequate cost-realism analysis), both of which are supported by compelling evidence in the agency record. The SSA's decision to select a lower-scored, higher-priced offeror without a rational, documented justification for the tradeoff, coupled with the agency's failure to scrutinize a $10.8 million cost deviation from the IGCE, presents exactly the kind of procurement error that courts routinely correct. We believe that judicial review will provide MTDC the fair hearing it has been denied at the agency level.
VII. Request for Client Conference
We respectfully request that MTDC schedule a conference call or in-person meeting at MTDC's offices at 550 West Adams Street at the earliest convenient date to discuss the options presented in this letter, the fee estimates, and MTDC's preferred approach for moving forward. We suggest that the meeting include the following participants:
• Dr. Raymond Alcázar, Executive Director, MTDC
• Patricia Ng, General Counsel, MTDC
• Ian Blackwood, Partner, Calderwood & Harkness LLP
• Stephanie Okafor, Partner, Calderwood & Harkness LLP
• Sara Hendricks, Associate, Calderwood & Harkness LLP
We are available at MTDC's convenience during the weeks of April 29 and May 6, 2024, and can accommodate either an in-person meeting or a secure videoconference if that is more practical for your schedules.
In addition, we respectfully request MTDC's confirmation of its authorization for the engagement team to begin preliminary litigation preparation — including drafting of the Court of Claims complaint and preliminary injunction motion — pending the expiration of the sixty-day window. This preparatory work will ensure that MTDC is positioned to act immediately if the Board fails to respond, and the cost of this preparation will be modest relative to the overall litigation budget.
VIII. Closing
We appreciate MTDC's continued confidence in Calderwood & Harkness, and we remain fully committed to achieving a successful outcome in this matter. The IITMP procurement represents a significant opportunity for MTDC to advance its mission of delivering modern, reliable transit services to the residents and commuters of the greater Chicagoland metropolitan area, and we take seriously our responsibility to protect MTDC's rights as the highest-scored offeror in this competition.
We remind you that this letter constitutes a privileged and confidential attorney-client communication. Its contents, including the legal analysis, strategic recommendations, and fee information contained herein, are protected by the attorney-client privilege and the work product doctrine, and should not be disclosed to any third party without the prior written consent of Calderwood & Harkness. We request that you treat this letter accordingly and limit its distribution to those individuals within MTDC who have a need to know its contents.
Please do not hesitate to contact me directly at (312) 555-7800 or by email at iblackwood@calderwoodharkness.com if you have any questions or if you would like to discuss any aspect of this letter in advance of the conference.
Very truly yours,
CALDERWOOD & HARKNESS LLP
By: ________
Ian Blackwood Partner
311 South Wacker Drive, Suite 4800 Chicago, Illinois 60606 Telephone: (312) 555-7800
Email: iblackwood@calderwoodharkness.com
cc:
Stephanie Okafor, Partner, Calderwood & Harkness LLP Sara Hendricks, Associate, Calderwood & Harkness LLP Christopher Aiken, Associate, Calderwood & Harkness LLP
Enclosure:
Copy of Fourth Status Inquiry Letter to IDOT Office of Chief Counsel (March 15, 2024)
| Timekeeper | Role | Billing Rate |
| Ian Blackwood | Partner | $895/hr |
| Stephanie Okafor | Partner | $895/hr |
| Sara Hendricks | Associate | $525/hr |
| Christopher Aiken | Associate | $525/hr |
| Paralegal Staff | — | $275/hr |
| Component | Amount | |
| C&H Fees Incurred to Date (through 12/31/2023) | $487,350 | |
| C&H Estimated Litigation-Phase Fees | $750,000 – $1,200,000 | |
| Total Estimated C&H Fees | $1,237,350 – $1,687,350 | |
| Linden Analytics Protest-Phase Fee (incurred) | $145,000 | |
| Linden Analytics Litigation-Phase Fee (authorized) | $85,000 | |
| Total Estimated Expert Fees | $230,000 |