MEMORANDUM

PRIVILEGED AND CONFIDENTIAL — ATTORNEY-CLIENT COMMUNICATION / ATTORNEY WORK PRODUCT

TO: David Pruitt, General Counsel & Corporate Secretary, Cascade Retail Holdings Inc.

FROM: Douglas Carmichael, Partner, and Yuki Nakamura, Senior Associate, Calderwood & Harkness LLP

DATE: September 17, 2021

RE: Preliminary Case Assessment — Vantor Holdings Corp. v. Cascade Retail Holdings Inc., Case No. 21STCV-34872, Superior Court of California, County of Los Angeles

C&H Matter No.: 1038-00007

Right-click to update Table of Contents

I. Purpose and Executive Summary

This memorandum provides an initial assessment of the complaint filed by Vantor Holdings Corp. ("Vantor" or "Plaintiff") on September 7, 2021, against Cascade Retail Holdings Inc. ("Cascade," "CRH," or the "Company") in the Superior Court of the State of California, County of Los Angeles, bearing Case No. 21STCV-34872 (the "Action"). The purpose of this memorandum is to set forth our preliminary analysis of the claims asserted, evaluate available defenses, assess exposure, and outline recommended immediate action items. This memorandum is protected by the attorney-client privilege and constitutes attorney work product.

Cascade has not yet been formally served with the summons and complaint as of the date of this memorandum; however, service is anticipated imminently, likely during the week of September 27, 2021. Our firm's engagement was opened on September 13, 2021, following receipt of a copy of the filed complaint that was obtained through the court's electronic filing system by your office. Upon service, Cascade will have thirty (30) days to file a responsive pleading.

In the Action, Vantor alleges that Cascade systematically targeted and "poached" three of Vantor's key consumer-goods suppliers — Hemsworth Consumer Products LLC ("Hemsworth"), Tridale Manufacturing Inc. ("Tridale"), and Orion Lifestyle Brands Corp. ("Orion") (collectively, the "Suppliers") — by inducing each of them to breach exclusive supply agreements with Vantor. Vantor asserts total damages of approximately $87.4 million, which it claims represent the lost value of the supply relationships across projected future periods.

The complaint asserts three causes of action: (1) tortious interference with contractual relations; (2) tortious interference with prospective economic advantage; and (3) unfair business practices under California Business and Professions Code § 17200 et seq. Vantor is represented by Kessler, Brandt & Whitfield LLP, through Martin Kessler (Senior Partner), Natalie Whitfield (Partner), and Jason Okafor (Senior Associate), with offices at 1999 Avenue of the Stars, Suite 2800, Los Angeles, California 90067. Kessler, Brandt & Whitfield is a well-regarded plaintiff-side commercial litigation firm with a strong track record in business tort cases in the Central District of California and the Los Angeles Superior Court. Their involvement indicates that Vantor intends to prosecute this matter vigorously.

Our preliminary assessment is that Cascade has strong defenses and that Vantor's damages claims are substantially overstated. In particular, we have identified the following significant weaknesses in Vantor's case:

• Each of the three exclusive supply agreements between Vantor and the Suppliers contained a termination-for-convenience clause that allowed either party to terminate the agreement upon relatively short notice (ranging from 60 to 120 days). If the Suppliers properly exercised these provisions, there was no breach of the underlying agreements, which would defeat the core tortious interference with contractual relations claim.

• Based on our preliminary discussions with you and with Annika Bergström, VP Strategic Sourcing, Cascade did not have actual knowledge of the specific exclusivity provisions in the Vantor–Supplier agreements at the time it entered into its new supply agreements. Knowledge of the contract is a threshold element of tortious interference under California law.

• The Suppliers made independent business decisions to enter into agreements with Cascade, motivated by Cascade's substantially higher purchase commitments and its superior distribution platform. No evidence of coercion, fraud, or other improper means has been identified.

• Vantor's damages calculation is highly speculative, projecting revenue streams four to six years into the future — well beyond the remaining terms of the existing exclusive supply agreements — and assumes with certainty that the Suppliers would have renewed and expanded their relationships with Vantor.

• The § 17200 unfair competition claim is duplicative of the tort claims and may be subject to early challenge.

We outline below the factual background, a detailed analysis of each claim, potential defenses, a preliminary risk assessment, and our recommended next steps. We emphasize that this assessment is preliminary and will be refined as we conduct witness interviews, review internal documents, and complete our factual investigation.

II. Parties

A. Cascade Retail Holdings Inc. (Defendant / Our Client)

Cascade Retail Holdings Inc. is a Delaware corporation, publicly traded on the Nasdaq Stock Market under the ticker symbol CRHI. The Company's principal executive offices are located at 2200 Elliott Avenue West, Suite 1400, Seattle, Washington 98119.

Cascade is a multi-channel retail and e-commerce company that operates more than 340 retail store locations across 22 states, with a particular concentration in the Pacific Northwest, Mountain West, and Sun Belt regions. In addition to its brick-and-mortar operations, Cascade operates a major proprietary e-commerce platform that accounts for a growing share of overall revenue. The Company's core product categories include home goods, consumer electronics accessories, personal care and wellness products, and general lifestyle merchandise.

For fiscal year 2021, Cascade reported annual revenue of approximately $6.8 billion, and the Company's market capitalization was approximately $14.2 billion as of September 2021. Cascade employs approximately 32,000 full-time and part-time employees nationwide.

The following Cascade personnel are relevant to this matter:

Ms. Bergström is likely to be the single most important fact witness for Cascade. She was responsible for leading the day-to-day execution of the Project Atlas initiative, including the identification, evaluation, and negotiation of new supplier relationships. Her knowledge regarding the circumstances of Cascade's outreach to the Suppliers, the negotiations leading to the execution of the new supply agreements, and Cascade's state of knowledge regarding Vantor's existing relationships with those Suppliers will be central to the defense.

B. Vantor Holdings Corp. (Plaintiff)

Vantor Holdings Corp. is a California corporation and privately held company. Its principal offices are located at 18500 Von Karman Avenue, Suite 600, Irvine, California 92612. Vantor operates as a wholesale distribution and specialty retail company focused on home goods, consumer accessories, and related product categories. The company operates approximately 85 retail store locations across California, Arizona, Nevada, and Oregon.

Vantor's estimated fiscal year 2021 annual revenue is approximately $1.1 billion. The company was founded by its current CEO, Richard "Rick" Ellsworth, in 1998, and has grown through a combination of organic expansion and selective acquisitions of smaller regional distributors.

The following Vantor personnel are named in the complaint or are anticipated to serve as fact witnesses:

Based on our review of the complaint, Thomas Brennecke appears to be Vantor's principal fact witness regarding the nature and history of the supply relationships, the exclusivity provisions, and the circumstances under which the Suppliers transitioned to Cascade.

C. Third-Party Suppliers at Issue

The three Suppliers whose relationships are at the center of this dispute are as follows:

Hemsworth Consumer Products LLC. Hemsworth is an Oregon limited liability company with its headquarters at 4720 NW Yeon Avenue, Portland, Oregon 97210. The company is led by CEO Janet Kohler. Hemsworth manufactures and distributes a range of home goods and kitchen accessories, including countertop appliances, cookware, and kitchen organization products. Hemsworth has been in operation since approximately 2012 and has grown into a mid-market supplier with distribution relationships across the western United States.

Tridale Manufacturing Inc. Tridale is a Nevada corporation headquartered at 6300 South Pecos Road, Suite 210, Las Vegas, Nevada 89120. The company is led by President Gregory Fontaine. Tridale manufactures consumer electronics accessories, including charging cables, power adapters, protective cases for mobile devices and tablets, and related products. Tridale is a significant supplier in the consumer electronics accessory space, with particular strength in cost-competitive, high-volume products suitable for mass-market retail distribution.

Orion Lifestyle Brands Corp. Orion is a California corporation with its headquarters at 1900 Avenue of the Stars, Suite 1050, Los Angeles, California 90067. The company is led by CEO Simone Alvarez. Orion develops and markets personal care and wellness products, including skincare items, aromatherapy and essential oil products, health supplements, and related lifestyle merchandise. Orion has developed a strong brand presence in the specialty retail channel and has been expanding its distribution footprint.

All three Suppliers are non-parties to this litigation. However, their testimony, documents, and actions will be highly relevant, and we anticipate that both sides will seek discovery from them through third-party subpoenas. The Suppliers' motivations for entering into agreements with Cascade, their exercise (or non-exercise) of termination-for-convenience rights under the Vantor agreements, and their communications with both Vantor and Cascade will be critical to the outcome of this case.

III. Factual Background

A. Vantor's Exclusive Supply Agreements

According to the complaint and our preliminary understanding of the relevant facts, Vantor entered into exclusive supply agreements with each of the three Suppliers on a staggered basis over a period from mid-2018 through early 2020. The key terms of these agreements, as alleged in the complaint, are as follows:

Orion–Vantor Exclusive Supply Agreement. This agreement was executed on July 1, 2018, for a four-year term expiring on June 30, 2022. Under this agreement, Vantor committed to a minimum annual purchase obligation of $14.6 million for Orion's personal care and wellness product lines. In return, Orion agreed to supply Vantor on an exclusive basis within specified product categories and geographic territories.

Hemsworth–Vantor Exclusive Supply Agreement. This agreement was executed on March 15, 2019, for a three-year term expiring on March 14, 2022. Vantor committed to a minimum annual purchase obligation of $12.5 million for Hemsworth's home goods and kitchen accessories product lines. The agreement included exclusivity provisions substantially similar to those in the Orion agreement.

Tridale–Vantor Exclusive Supply Agreement. This agreement was executed on January 10, 2020, for a two-year term expiring on January 9, 2022. Vantor committed to a minimum annual purchase obligation of $8.3 million for Tridale's consumer electronics accessories product lines. The agreement also contained exclusivity provisions.

Each of the three agreements reportedly contained exclusivity provisions that restricted the Supplier from entering into supply relationships with competing retailers in overlapping product categories and, in some cases, overlapping geographic territories. The precise scope and language of the exclusivity clauses will be critically important to our analysis and must be obtained through discovery. At this stage, we have not reviewed the actual text of any of the three agreements; our understanding is based solely on the allegations in the complaint and publicly available information.

Critically, each agreement also contained a termination-for-convenience clause, a feature that significantly undermines Vantor's claim that the agreements were inviolable long-term commitments. Based on the complaint's own allegations (albeit referenced somewhat obliquely), the termination-for-convenience provisions established the following notice periods:

• Hemsworth–Vantor Agreement: 90-day written notice period for termination for convenience by either party.

• Tridale–Vantor Agreement: 60-day written notice period for termination for convenience by either party.

• Orion–Vantor Agreement: 120-day written notice period for termination for convenience by either party.

The existence of these termination-for-convenience clauses is a significant factor in our preliminary defense analysis. If the Suppliers provided the required notice of termination before entering into supply agreements with Cascade, or if the termination-for-convenience clauses otherwise vitiated the exclusivity provisions upon exercise, then there may have been no subsisting contractual obligation to breach at the time the Cascade agreements were executed. We discuss this defense theory in greater detail in Section VI.C below.

B. Project Atlas and Cascade's Supplier Diversification Initiative

In February 2021, Cascade launched an internal strategic initiative designated "Project Atlas." The purpose of Project Atlas was to identify, evaluate, and onboard approximately 25 new suppliers across three product categories that Cascade's strategic planning team had identified as high-growth priorities: (1) home goods, (2) consumer electronics accessories, and (3) personal care and wellness products. Project Atlas was motivated by Cascade's desire to diversify its supplier base, reduce concentration risk, improve product quality and pricing, and expand its private-label and branded merchandise offerings in these rapidly growing categories.

Project Atlas was led by Annika Bergström, VP Strategic Sourcing, and was overseen at the executive level by Lena Torvik, SVP Supply Chain & Procurement. The initiative received a dedicated internal budget allocation of $4.2 million to cover supplier transition costs, including due diligence, onboarding, logistics integration, and initial marketing and merchandising support. The initiative was endorsed by the executive leadership team, including CEO Margaret Prumvane and CFO Raj Subramanian, as part of Cascade's broader fiscal year 2021–2022 growth strategy.

During the course of Project Atlas, Cascade's sourcing team identified and evaluated numerous potential new suppliers. The three Suppliers at issue in this litigation — Hemsworth, Tridale, and Orion — were among the candidates identified through this process. Based on our initial understanding, the selection criteria used by the Project Atlas team focused on product quality, manufacturing capacity, pricing competitiveness, brand recognition, supply chain reliability, and the potential for long-term strategic partnership. There is no indication from our preliminary review that the Suppliers were targeted because of their existing relationships with Vantor, or that disrupting Vantor's business was in any way a motivating factor.

Cascade ultimately entered into new supply agreements with each of the three Suppliers during the spring and summer of 2021. The key terms of these agreements are as follows:

Cascade–Orion Supply Agreement. Executed on May 10, 2021, for a four-year term. Annual purchase commitment of $31.0 million. This represents a purchase commitment more than double Vantor's existing $14.6 million annual commitment to Orion, offering Orion a significantly larger and more diversified distribution channel.

Cascade–Hemsworth Supply Agreement. Executed on June 1, 2021, for a five-year term. Annual purchase commitment of $28.0 million. This represents a purchase commitment more than double Vantor's existing $12.5 million annual commitment to Hemsworth, with a longer contract term providing Hemsworth with greater revenue visibility and certainty.

Cascade–Tridale Supply Agreement. Executed on August 15, 2021, for a three-year term. Annual purchase commitment of $19.5 million. This represents a purchase commitment more than double Vantor's existing $8.3 million annual commitment to Tridale, with a longer contract term than the original two-year Vantor–Tridale agreement.

The disparity between Cascade's and Vantor's respective purchase commitments is substantial and is likely the primary economic factor motivating the Suppliers' decisions to transition from Vantor to Cascade. The following table illustrates the comparative purchase commitments:

These figures demonstrate that Cascade was offering the Suppliers an economic opportunity that was fundamentally superior to what Vantor was providing. Cascade's ability to offer higher-volume purchase commitments is a natural consequence of its significantly larger retail footprint (340+ locations versus Vantor's approximately 85 locations) and its major e-commerce platform. The Suppliers' decisions to pursue relationships with Cascade were, in our preliminary view, rational business decisions driven by legitimate economic considerations, not the product of any improper inducement by Cascade.

C. Filing of the Complaint

Vantor filed its complaint in the Superior Court of the State of California, County of Los Angeles, on September 7, 2021, through its counsel at Kessler, Brandt & Whitfield LLP. The case was assigned Case No. 21STCV-34872. The complaint is a verified complaint, signed under penalty of perjury by Richard Ellsworth in his capacity as CEO of Vantor.

As of the date of this memorandum, Cascade has not yet been formally served with the summons and complaint. Based on the California Code of Civil Procedure, service must be effectuated within sixty (60) days of the filing of the complaint or as otherwise ordered by the court, and we anticipate that service will occur imminently, likely during the week of September 27, 2021. Once served, Cascade will have thirty (30) days to file a responsive pleading — either an answer or a demurrer — pursuant to California Code of Civil Procedure § 412.20.

We are monitoring the matter closely and have alerted all relevant internal stakeholders to be prepared for receipt of service. Upon service, we will immediately confirm the responsive pleading deadline and begin preparation of Cascade's answer.

IV. Summary of Claims

The complaint asserts three causes of action against Cascade. We summarize each below, along with our preliminary observations regarding the legal elements and the strength of Vantor's allegations.

A. First Cause of Action: Tortious Interference with Contractual Relations

Vantor's primary claim alleges that Cascade knowingly and intentionally induced Hemsworth, Tridale, and Orion to breach their respective exclusive supply agreements with Vantor. Under California law, the elements of a claim for tortious interference with contractual relations are: (1) the existence of a valid contract between the plaintiff and a third party; (2) the defendant's knowledge of the contract; (3) the defendant's intentional acts designed to induce a breach or disruption of the contractual relationship; (4) actual breach or disruption of the contractual relationship; and (5) resulting damages. See Pacific Gas & Electric Co. v. Ridgeline Trust Bank, 50 Cal. 3d 1118, 1126 (1990); Camberwell Corporation, 19 Cal. 4th 26, 55 (1998).

Vantor asserts that Cascade was aware of the exclusivity provisions contained in each of the three Vantor–Supplier agreements and that Cascade deliberately pursued the three Suppliers with the knowledge and intent that doing so would cause the Suppliers to breach those agreements. The complaint alleges that Cascade's conduct was "willful, intentional, and calculated to disrupt and destroy Vantor's established supply relationships" and that Cascade engaged in a "coordinated supplier-poaching campaign" designed to undermine Vantor's competitive position in the marketplace.

Vantor contends that each Supplier breached its respective exclusive supply agreement by entering into a supply contract with Cascade while the Vantor agreement remained in effect and the exclusivity obligations were still binding. The complaint alleges that Hemsworth, Tridale, and Orion each "abandoned" their exclusive supply obligations to Vantor and began diverting product supply to Cascade in advance of, or concurrent with, the execution of the Cascade supply agreements.

Preliminary Observations. This is Vantor's strongest claim, but it faces several significant hurdles. As discussed in Section VI below, the threshold knowledge element is a vulnerability for Vantor, and the termination-for-convenience provisions in the Vantor agreements may eliminate the required element of actual breach. Moreover, even if the elements are otherwise satisfied, the "competition privilege" recognized under California law provides a defense where a defendant's actions are motivated by legitimate competitive interests rather than improper purposes. See della Penna v. Crowne Albany Industries, 11 Cal. 4th 376, 392–393 (1995).

B. Second Cause of Action: Tortious Interference with Prospective Economic Advantage

Vantor's second claim alleges that Cascade disrupted Vantor's reasonable expectation of renewed and expanded supply relationships with the three Suppliers beyond the initial contract terms. Under California law, the elements of a claim for tortious interference with prospective economic advantage are: (1) an economic relationship between the plaintiff and a third party, with the probability of future economic benefit to the plaintiff; (2) the defendant's knowledge of the relationship; (3) intentional acts by the defendant designed to disrupt the relationship; (4) actual disruption of the relationship; and (5) economic harm to the plaintiff proximately caused by the defendant's wrongful conduct. See Glenrock Corporation, 29 Cal. 4th 1134, 1153 (2003).

Critically, the California Supreme Court has held that this tort requires proof that the defendant engaged in conduct that is independently wrongful — that is, wrongful apart from the interference itself. della Penna v. Crowne Albany Industries, 11 Cal. 4th 376, 393 (1995). The independently wrongful conduct requirement distinguishes this claim from the contractual interference claim and imposes a significantly higher burden on the plaintiff. Mere competitive solicitation of a business partner's suppliers does not, standing alone, constitute independently wrongful conduct. The plaintiff must demonstrate that the defendant engaged in conduct that would be actionable as an independent tort or violation of statute, such as fraud, misrepresentation, defamation, or violation of a statutory prohibition.

Vantor alleges that it had a "reasonable expectation" that each of the three Suppliers would renew or extend its exclusive supply agreement upon expiration of the initial term, and that Cascade's actions "destroyed" that prospective business relationship. The complaint further alleges that Vantor had invested "substantial time, resources, and relationship capital" in developing the supply relationships and that Cascade's interference deprived Vantor of the benefits of those investments.

Preliminary Observations. This claim presents significant legal vulnerabilities for Vantor. The complaint does not identify any conduct by Cascade that is independently wrongful beyond the alleged competitive solicitation of the Suppliers. There are no allegations of fraud, misrepresentation, defamation, bribery, or any other tortious or unlawful conduct by Cascade. Offering a supplier a better deal — higher purchase commitments, longer contract terms, and access to a larger distribution network — is legitimate competitive activity, not wrongful conduct. We believe this claim is vulnerable to a dispositive motion on the independently wrongful conduct element. Additionally, Vantor's expectation of contract renewal is inherently speculative, particularly given the termination-for-convenience provisions that allowed either party to end the relationships at any time with relatively short notice.

C. Third Cause of Action: Unfair Business Practices (Cal. Bus. & Prof. Code § 17200)

Vantor's third cause of action invokes California's Unfair Competition Law ("UCL"), codified at California Business and Professions Code § 17200 et seq. The UCL prohibits any "unlawful, unfair, or fraudulent business act or practice." The statute is broad in scope and provides for injunctive relief and restitution but does not authorize the recovery of compensatory damages.

Vantor alleges that Cascade's "supplier-poaching campaign" constitutes an "unfair" or "unlawful" business practice within the meaning of § 17200. Specifically, the complaint contends that Cascade's conduct in systematically targeting and inducing the breach of Vantor's exclusive supply agreements was "unfair" in that it violated established norms of competitive behavior, and "unlawful" in that it constituted tortious interference with contractual relations.

Preliminary Observations. The § 17200 claim appears to be entirely derivative of the tortious interference claims. Vantor does not allege any separate or independent business practice that would give rise to UCL liability apart from the conduct underlying the tort claims. This raises questions about the independent viability of the UCL claim. Under California law, a UCL claim predicated on an "unlawful" business practice must be grounded in a violation of some other law; if the underlying tort claims fail, the UCL claim fails with them. See Cel-Tech Communications, Inc. v. Los Angeles Cellular Telephone Co., 20 Cal. 4th 163, 182 (1999). Moreover, the UCL claim is limited to equitable remedies (injunction and restitution) and cannot serve as a basis for the compensatory damages Vantor seeks. We believe this claim is vulnerable to demurrer or, at minimum, to summary adjudication.

V. Damages Alleged

Vantor claims total damages of $87.4 million, purportedly representing the full economic value of the three supplier relationships that Vantor alleges it lost as a result of Cascade's conduct. The complaint breaks down the damages claim as follows:

The complaint references the engagement of Meridian Forensic Economics LLC as Vantor's damages expert. The expert identified in the complaint is Dr. Harold Pryce, Managing Director, with offices at 2049 Century Park East, Suite 1200, Los Angeles, California 90067. Dr. Pryce is a well-known forensic economist who has provided expert testimony in numerous commercial disputes in California state and federal courts. His involvement suggests that Vantor intends to present a detailed economic damages analysis to support its claims.

Preliminary Observations on Damages.

We believe Vantor's damages claims are substantially inflated and vulnerable to significant challenge on multiple grounds:

(1) Projection Period Far Exceeds Remaining Contract Terms. Vantor's damages model projects revenue streams of five, four, and six years for the Hemsworth, Tridale, and Orion relationships, respectively. However, at the time of the alleged interference, the remaining terms of the three exclusive supply agreements were significantly shorter:

• Hemsworth: The agreement was set to expire on March 14, 2022. The Cascade–Hemsworth agreement was executed on June 1, 2021, leaving approximately 9 months on the exclusive term. Yet Vantor projects a 5-year revenue stream.

• Tridale: The agreement was set to expire on January 9, 2022. The Cascade–Tridale agreement was executed on August 15, 2021, leaving approximately 5 months on the exclusive term. Yet Vantor projects a 4-year revenue stream.

• Orion: The agreement was set to expire on June 30, 2022. The Cascade–Orion agreement was executed on May 10, 2021, leaving approximately 13 months on the exclusive term. Yet Vantor projects a 6-year revenue stream.

The vast majority of Vantor's claimed damages — likely in excess of 80% — is attributable to projected revenue streams after the expiration of the existing exclusive supply agreements. These projections assume with certainty that the Suppliers would have renewed and expanded their agreements with Vantor, which is inherently speculative and unsupported by any contractual guarantee. The presence of the termination-for-convenience clauses further undermines any assumption of long-term continuity, as either party could have terminated the relationship at any time with as little as 60 days' notice.

(2) Speculative Assumption of Renewal. There is no contractual right of renewal in any of the three Vantor–Supplier agreements (at least based on the complaint's own allegations). Vantor's damages model assumes that each Supplier would have voluntarily renewed and expanded its agreement with Vantor — an assumption that is fundamentally speculative and not compensable as a matter of law. Under California law, damages for breach of contract or tortious interference must be proven with reasonable certainty and cannot be based on speculation or conjecture. See Sargon Enterprises, Inc. v. University of Southern California, 55 Cal. 4th 747, 774 (2012).

(3) discount Rate. Vantor uses an 8.5% discount rate, which may not be appropriate for the risk profile of these projected revenue streams. The selection of the discount rate will require expert analysis, but we note that a higher discount rate — which would be appropriate given the speculative nature of the projected revenue streams — would materially reduce the present value of the claimed damages.

(4) Failure to Account for Mitigation. The damages model does not appear to account for Vantor's obligation to mitigate its losses by seeking alternative suppliers. Given the breadth of the consumer goods supply market, substitute suppliers were available to Vantor in each of the three product categories, and any reasonable mitigation efforts would significantly reduce the actual damages incurred.

(5) Section 17200 Remedies Limited to Restitution. To the extent Vantor seeks damages under the UCL, its recovery is limited to restitution and injunctive relief; compensatory damages are not available under § 17200. See Glenrock Corporation, 29 Cal. 4th 1134, 1148–1149 (2003).

VI. Preliminary Defense Theories

Based on our initial review of the complaint, our preliminary discussions with David Pruitt and Annika Bergström, and our analysis of the applicable law, we have identified the following principal defense theories. These theories will be refined and supplemented as our factual investigation progresses.

A. Lack of Knowledge of Exclusivity Provisions

A threshold element of tortious interference with contractual relations under California law is that the defendant had knowledge of the existence of the contract that was allegedly interfered with. See Reeves v. Hanlon, 33 Cal. 4th 1140, 1148 (2004). While the precise contours of the knowledge requirement are subject to some nuance — constructive knowledge or willful ignorance may suffice in some circumstances — the plaintiff must, at a minimum, demonstrate that the defendant was aware of the contractual relationship and its material terms.

Our preliminary understanding, based on initial discussions with David Pruitt and Annika Bergström, is that Cascade did not have actual knowledge of the specific exclusivity provisions in the Vantor–Supplier agreements at the time the new supply agreements were executed. In particular:

• Project Atlas was a broad-based supplier diversification initiative targeting approximately 25 potential new suppliers across three product categories. The three Suppliers at issue in this litigation were among many candidates identified and evaluated through an industry-wide screening process.

• Cascade's outreach to the Suppliers was based on product quality, manufacturing capacity, pricing competitiveness, and strategic fit with Cascade's growth objectives. The selection criteria did not include any consideration of the Suppliers' existing relationships with other retailers, including Vantor.

• Ms. Bergström has indicated in our initial discussions that she was not aware that the Suppliers had exclusive supply agreements with Vantor or any other retailer at the time she initiated discussions with them. She states that the Suppliers did not disclose the existence of exclusivity provisions during initial negotiations.

• Cascade did not conduct any investigation into the Suppliers' existing contractual commitments with other parties, as there was no reason to believe that such commitments existed or would be relevant to Cascade's procurement decisions.

If these facts are confirmed through document review and witness interviews, the absence of knowledge presents a significant obstacle for Vantor's primary tortious interference claim. We note, however, that this defense requires careful development. We must conduct a thorough review of all internal Project Atlas communications — including emails, memoranda, meeting minutes, presentations, and any due diligence materials — to confirm that there are no documents suggesting that any Cascade personnel had knowledge of the Vantor exclusivity provisions. Any internal communication referencing Vantor's supply relationships with the Suppliers, or suggesting that Cascade was aware that it was competing for suppliers that were exclusively committed to another retailer, could undermine this defense.

Early interviews with Ms. Bergström and Ms. Torvik will be essential to developing and confirming this defense theory. We recommend conducting these interviews within the next two weeks.

B. Independent Supplier Decision-Making

Even if knowledge of the contractual relationship is established, Vantor must also demonstrate that Cascade engaged in intentional acts designed to induce a breach of the Vantor–Supplier agreements. The mere act of making a competitive offer to a supplier does not, without more, constitute tortious interference. The suppliers are independent business entities that are free to make their own decisions regarding their commercial relationships.

The facts here strongly support the conclusion that the Suppliers made independent business decisions to enter into agreements with Cascade, motivated by the significantly superior economic terms offered by Cascade. As summarized above, Cascade's annual purchase commitments to each Supplier were more than double the corresponding Vantor commitments — $28.0 million versus $12.5 million for Hemsworth; $19.5 million versus $8.3 million for Tridale; and $31.0 million versus $14.6 million for Orion. In addition, Cascade offered longer contract terms and access to a retail distribution network more than four times larger than Vantor's.

No evidence has been identified to suggest that Cascade used any form of inducement, coercion, or improper means to cause the Suppliers to transition. Cascade did not offer the Suppliers above-market pricing, improper incentives, or side payments. Cascade did not disparage Vantor to the Suppliers or otherwise engage in conduct designed to undermine the Vantor–Supplier relationships. Cascade simply offered the Suppliers a better deal — one that any rational business would find attractive — and the Suppliers accepted.

Under California law, legitimate competitive activity that results in the disruption of a plaintiff's business relationships is not actionable as tortious interference, even if the defendant benefits from the disruption. See della Penna v. Crowne Albany Industries, 11 Cal. 4th 376, 392–393 (1995) (recognizing a "competition privilege" that shields defendants engaged in legitimate competitive behavior). The right to compete for suppliers is a fundamental aspect of a free market economy, and the law does not penalize a company for being a more attractive business partner than its competitors.

C. Termination-for-Convenience Clauses

Perhaps the most powerful defense available to Cascade is the existence of termination-for-convenience clauses in each of the three Vantor–Supplier agreements. As noted above, each agreement allowed either party to terminate the agreement upon written notice of 90 days (Hemsworth), 60 days (Tridale), or 120 days (Orion).

The significance of these provisions cannot be overstated. If the Suppliers properly exercised their termination-for-convenience rights prior to contracting with Cascade — or if the Suppliers exercised those rights in connection with their transition to Cascade — then there was no breach of the Vantor agreements. Absent a breach, the tortious interference with contractual relations claim fails as a matter of law, because one of the essential elements — actual breach or disruption of the contractual relationship — cannot be established.

This defense requires us to establish the precise timeline of events:

• When did each Supplier provide notice of termination to Vantor (if at all)?

• Did the notice comply with the contractual notice requirements (written notice, proper delivery, adequate notice period)?

• Was the termination effective before or after the execution of the Cascade supply agreements?

• Did the Suppliers begin performing under the Cascade agreements before the termination of the Vantor agreements became effective?

If the termination notices were provided before the Cascade agreements were executed and the notice periods had elapsed (or were on track to elapse) before performance under the Cascade agreements began, the defense is strongest. Even if the timeline is less clean — for example, if the Cascade agreements were executed during the notice period but before the termination became effective — there is a strong argument that the Suppliers' exercise of their contractual right to terminate for convenience is not a "breach" of the agreement and cannot support a tortious interference claim.

We must obtain copies of the actual termination notices and confirm the timeline of notice vis-à-vis the execution dates of the Cascade agreements. This will be a priority item in discovery. We also recommend requesting these documents directly from the Suppliers' counsel, if feasible, to expedite the analysis.

D. Failure to Mitigate Damages

Under California law, a party who suffers damages has an obligation to take reasonable steps to mitigate those damages. See Valle de Oro Bank v. Gamboa, 26 Cal. App. 4th 1686, 1691 (1994). A plaintiff cannot recover damages that could have been avoided through reasonable mitigation efforts.

Even if Vantor establishes some interference and resulting damages, Vantor had an obligation to mitigate its losses by seeking alternative suppliers. The consumer goods supply market is a competitive and well-developed marketplace with numerous potential suppliers in each of the three product categories at issue — home goods, consumer electronics accessories, and personal care and wellness products. Vantor, as a $1.1 billion annual revenue company with approximately 85 retail locations, is a significant enough buyer to attract interest from alternative suppliers. Its failure to pursue alternative supply relationships, or any unreasonable delay in doing so, would reduce its recoverable damages.

Discovery into Vantor's mitigation efforts — or lack thereof — will be a critical component of our defense strategy. We will seek to identify what steps, if any, Vantor took to identify and engage alternative suppliers after learning that the three Suppliers intended to transition to Cascade, the timeline of those efforts, and the results. Any evidence that suitable alternative suppliers were available and that Vantor failed to pursue them will significantly reduce Cascade's damages exposure.

We preliminarily estimate that a successful mitigation defense could reduce Vantor's recoverable damages by approximately 40% to 55%, though this estimate will need to be refined through discovery and expert analysis.

E. Section 17200 Claim Is Duplicative / Preempted

As noted above, Vantor's § 17200 claim is based entirely on the same conduct underlying the tortious interference claims. The complaint does not identify any separate or independent business practice that would give rise to UCL liability apart from the alleged tortious interference. This raises several vulnerabilities:

• Duplicativeness. The § 17200 claim is duplicative of the tort claims and adds no independent basis for relief. Courts have expressed skepticism toward UCL claims that merely repackage underlying tort claims without alleging additional or distinct wrongful conduct.

• Unlawful Prong. To the extent the § 17200 claim is predicated on the "unlawful" prong of the statute, it is entirely dependent on the viability of the underlying tort claims. If the tortious interference claims fail, the § 17200 "unlawful" claim fails with them.

• Unfair Prong. To the extent the claim is predicated on the "unfair" prong, the California Supreme Court has held that business conduct is "unfair" under § 17200 only if it "threatens an incipient violation of an antitrust law, or violates the policy or spirit of one of those laws because its effects are comparable to or the same as a violation of the law, or otherwise significantly threatens or harms competition." Cel-Tech Communications, Inc. v. Los Angeles Cellular Telephone Co., 20 Cal. 4th 163, 187 (1999). Cascade's competitive solicitation of suppliers does not meet this standard.

• Remedies. Even if the UCL claim survives, the available remedies under § 17200 are limited to injunctive relief and restitution. The statute does not authorize compensatory damages, which means the UCL claim would not expand Vantor's potential recovery beyond what is available under the tort claims.

We believe the § 17200 claim is vulnerable to demurrer or, at a minimum, to summary adjudication. We recommend preserving our challenge to this claim and raising it at the appropriate procedural stage.

F. Prospective Advantage Claim Requires Independently Wrongful Conduct

As discussed in Section IV.B, Vantor's claim for tortious interference with prospective economic advantage requires proof that Cascade engaged in conduct that is independently wrongful — that is, wrongful apart from the interference itself. See della Penna v. Crowne Albany Industries, 11 Cal. 4th 376, 393 (1995); Glenrock Corporation, 29 Cal. 4th 1134, 1153 (2003).

The complaint does not identify any independently wrongful conduct by Cascade. It does not allege fraud, misrepresentation, defamation, bribery, threats, or violation of any statute. The complaint's allegations amount to nothing more than the assertion that Cascade competed for the Suppliers' business — which is lawful commercial activity. Offering suppliers better terms, higher purchase commitments, and access to a larger distribution network is the essence of lawful competition, not wrongful conduct.

This claim is vulnerable to dispositive motion — potentially at the demurrer stage, and certainly at the summary judgment stage — based on the absence of independently wrongful conduct. We will evaluate the appropriate timing for such a motion as the case progresses.

VII. Preliminary Exposure Assessment

Based on our initial analysis, we provide the following preliminary assessment of Cascade's potential financial exposure in this matter. We emphasize that this assessment is preliminary and will be refined as additional facts are developed through discovery, witness interviews, and expert analysis.

Vantor's Claimed Exposure: $87.4 million. As discussed in Section V, we believe this figure is substantially overstated because it projects revenue streams well beyond the remaining terms of the exclusive supply agreements, assumes certainty of contract renewal, and does not account for mitigation.

Our Preliminary Assessment of Actual Provable Damages. Limiting the damages calculation to the remaining exclusive terms of the Vantor–Supplier agreements at the time of the alleged interference — which we believe is the legally appropriate measure — produces a significantly lower damages range:

These figures represent our estimate of the maximum provable damages based on the remaining exclusive terms, before any reduction for failure to mitigate. Applying an estimated mitigation offset of 40%–55%, which reflects the availability of substitute suppliers and Vantor's obligation to take reasonable steps to replace the lost supply relationships, the adjusted exposure range would be approximately:

Adjusted exposure range (after mitigation): $2.7 million – $6.8 million

If the termination-for-convenience defense is successful — that is, if we can establish that the Suppliers properly exercised their contractual right to terminate before performing under the Cascade agreements — the exposure on the primary tortious interference claim could be reduced to zero or near zero.

These figures are preliminary and subject to significant revision. They will be refined once we retain a damages expert, complete our document review, and develop a full understanding of the factual record. We will provide a more detailed exposure assessment in a follow-up memorandum once we have completed our initial investigation.

VIII. Insurance Coverage

Cascade maintains a commercial general liability ("CGL") insurance policy with Pinnacle National Insurance Co. The policy details are as follows:

Insurer: Pinnacle National Insurance Co.

Policy Number: PNG-CGL-2021-04487

Claims Contact: Leonard Furman, Senior Claims Adjuster, 120 Broadway, Suite 3500, New York, NY 10271

We recommend prompt notification to Pinnacle National Insurance Co. of this claim and a request for a coverage determination addressing both defense costs and potential indemnity obligations. Timely notification is important both to preserve Cascade's rights under the policy and to comply with any notice requirements that may be conditions of coverage.

We are currently preparing a formal coverage notification letter for submission to Pinnacle by September 20, 2021. The letter will provide Pinnacle with a copy of the complaint, a summary of the claims and alleged damages, and a request for acknowledgment of coverage and assignment of the claim to a claims handler.

The CGL policy may provide coverage for the claims asserted in this action. In particular, tortious interference claims may fall within the policy's coverage for "personal and advertising injury," which typically includes coverage for interference with business relationships, wrongful eviction, and other enumerated offenses. The availability of coverage will depend on the specific language of the policy, including any applicable exclusions, endorsements, and sublimits.

We note that the coverage analysis for this matter is sufficiently complex to warrant a separate memorandum, which we will prepare and deliver upon completion of our review of the full policy and any relevant endorsements. We have requested a complete copy of the policy from Cascade's risk management department and expect to receive it within the next several business days.

IX. Recommended Next Steps and Immediate Action Items

Based on our preliminary assessment, we recommend the following immediate action items. We have organized these in approximate order of priority and urgency.

A. Responsive Pleading

Cascade must file a responsive pleading within 30 days of service of the summons and complaint. Assuming service occurs during the week of September 27, 2021, the answer deadline will fall in approximately late October 2021 (on or about October 27–29, 2021, depending on the exact date of service).

We recommend filing an answer with comprehensive affirmative defenses rather than a demurrer at this stage. While we have identified potential grounds for demurrer on the § 17200 and prospective advantage claims, we believe the more prudent strategic approach at this early juncture is to answer the complaint, preserve all available defenses, and reserve our right to challenge the weaker claims through summary judgment or summary adjudication motions at a later stage — after we have had the benefit of discovery to develop the factual record. Filing a demurrer at this stage would delay the proceedings and invite amended pleading, without meaningfully advancing our defense position.

Our answer will assert, at a minimum, the following affirmative defenses:

1. Failure to state a cause of action.

2. Lack of knowledge of the exclusive supply agreements and their terms.

3. Privilege to compete (competition privilege).

4. Independent decision-making by the Suppliers.

5. Exercise of termination-for-convenience rights by the Suppliers.

6. Failure to mitigate damages.

7. Speculative and unproven damages.

8. Unclean hands.

9. Statute of limitations (to the extent applicable to any pre-2020 conduct).

10. Preemption / duplicativeness of § 17200 claim.

We will circulate a draft answer for your review prior to filing.

B. Document Preservation

It is imperative that Cascade promptly implement a comprehensive litigation hold to preserve all documents and electronically stored information ("ESI") that may be relevant to this matter. Under California law, a party has an obligation to preserve potentially relevant evidence upon the reasonable anticipation of litigation, and the failure to do so can result in spoliation sanctions.

We recommend issuing litigation hold notices to all relevant Cascade custodians, including at a minimum:

• Annika Bergström, VP Strategic Sourcing

• Lena Torvik, SVP Supply Chain & Procurement

• David Pruitt, General Counsel & Corporate Secretary

• Margaret Prumvane, CEO & President

• Raj Subramanian, CFO

• Any other personnel involved in Project Atlas or communications with the three Suppliers

The litigation hold should cover all documents and ESI related to Project Atlas, the three Supplier relationships, communications with or concerning Vantor, and any documents related to supplier sourcing strategy in the home goods, consumer electronics accessories, and personal care product categories. We will prepare a draft litigation hold notice for your review and distribution by September 22, 2021.

C. Key Witness Interviews

We recommend conducting detailed interviews with the following key Cascade personnel as soon as practicable:

Annika Bergström, VP Strategic Sourcing. Ms. Bergström is the most important fact witness for Cascade. She led the Project Atlas initiative and had direct involvement in the identification, evaluation, and negotiation of the new supply agreements with Hemsworth, Tridale, and Orion. Her testimony regarding the timeline of supplier outreach, the selection criteria used, and Cascade's state of knowledge regarding Vantor's existing supply relationships will be central to our defense. We recommend scheduling this interview during the week of September 27, 2021.

Lena Torvik, SVP Supply Chain & Procurement. Ms. Torvik provided executive oversight of Project Atlas and approved the budget allocation and strategic direction of the initiative. Her testimony regarding the business rationale for Project Atlas and the decision-making process will be important context for the defense. We recommend scheduling this interview during the week of October 4, 2021.

David Pruitt, General Counsel & Corporate Secretary. We will interview you regarding any legal review or analysis performed before executing the new supplier agreements, including whether any diligence was conducted into the Suppliers' existing contractual commitments. We are mindful that some communications may be subject to attorney-client privilege, and we will work with you to identify and preserve any applicable privilege protections.

D. Obtain and Analyze Key Documents

Several categories of documents will be critical to the development of our defense. We recommend taking the following steps to obtain and review these documents:

(1) Vantor–Supplier Exclusive Supply Agreements. We must obtain complete copies of all three exclusive supply agreements between Vantor and the Suppliers. These documents are essential to understanding the precise scope of the exclusivity provisions, the termination-for-convenience clauses, and any other relevant terms. We will seek these documents through formal discovery (requests for production) and may also request them directly from the Suppliers' counsel through informal cooperation.

(2) Project Atlas Internal Communications. We must conduct a comprehensive review of all internal Cascade communications related to Project Atlas, including emails, memoranda, presentations, meeting minutes, and any other documents referencing the supplier identification and evaluation process. Of particular importance are any communications referencing Vantor, the Suppliers' existing business relationships, or the exclusivity provisions in the Vantor–Supplier agreements.

(3) Termination-for-Convenience Notices. We must obtain copies of any termination-for-convenience notices sent by the Suppliers to Vantor, including the date, method of delivery, and content of each notice. This information is critical to our termination-for-convenience defense and to the timeline analysis required to assess whether the Vantor agreements were still in effect at the time the Cascade agreements were executed.

(4) Cascade–Supplier Supply Agreements. We should compile and review all three Cascade supply agreements (with Hemsworth, Tridale, and Orion) to confirm the execution dates, terms, and any provisions that may be relevant to the defense.

E. Insurance Notification

As discussed in Section VIII, we recommend submitting a formal notification letter to Pinnacle National Insurance Co. by September 20, 2021. We are currently preparing this letter and will circulate a draft for your review before submission.

F. Engage Local Counsel

While Calderwood & Harkness maintains a significant presence in Los Angeles, we recommend engaging California local counsel for supplemental litigation support, including monitoring of local court procedures, assistance with Los Angeles Superior Court-specific requirements, and potential courtroom support. Based on our prior experience and our assessment of the needs of this case, we recommend Wortham & Adair LLP, through Diana Prescott, Partner, located at 611 West Sixth Street, Suite 2400, Los Angeles, California 90017. Wortham & Adair has extensive experience in the Los Angeles Superior Court and can provide valuable local knowledge and support. We will coordinate with your office before formalizing this engagement.

G. Expert Retention

Although expert retention is not yet urgent, we recommend beginning the process of identifying potential damages and economics experts for eventual retention to rebut Vantor's damages claims. Early expert involvement will be valuable in framing our discovery strategy, developing our own damages theories, and identifying the weaknesses in Vantor's damages model.

We are currently evaluating several potential experts with experience in commercial damages and economic analysis in the consumer goods and retail sectors. We will provide you with a shortlist of candidates and our recommendations by mid-October 2021.

H. Litigation Budget

We will prepare a detailed litigation budget and exposure assessment memorandum for your review. The budget will cover anticipated costs through each major phase of the litigation, including pleadings, discovery, motion practice, trial preparation, and trial. We anticipate delivering the litigation budget by mid-November 2021.