CALDERWOOD & HARKNESS LLP

LITIGATION OUTCOME REPORT

CONFIDENTIAL — ATTORNEY WORK PRODUCT / ATTORNEY-CLIENT PRIVILEGED

Date: December 2, 2024

Prepared By:

Douglas Carmichael, Responsible Partner Francesca Morano, Billing Partner

C&H Matter No.: 1044-00006

Report Distribution:

Firm Management Committee Litigation Department Chair Finance Department

This Litigation Outcome Report is prepared solely for internal firm management purposes and constitutes attorney work product and attorney-client privileged material. It is not intended for distribution to any person or entity outside of Calderwood & Harkness LLP without the express written authorization of the Responsible Partner. Unauthorized disclosure, reproduction, or dissemination of this report or any portion thereof is strictly prohibited.

Right-click to update Table of Contents

I. Matter Identification

Matter Name: Defense of Charter-Party Breach Claim — Thalassa Shipping & Logistics SA

C&H Matter No.: 1044-00006

Case Caption: Northwind Maritime Corporation v. Thalassa Shipping & Logistics SA and Aegean Fortuna Shipholding Ltd., Index No. 655421/2023, Supreme Court of the State of New York, New York County, Commercial Division

Court / Part: Part 49, before the Honorable Lorraine K. Chen, J.S.C., 60 Centre Street, New York, NY 10007

Matter Open Date: October 16, 2023

Matter Status: Closing — Settlement Agreement and Mutual General Release executed November 20, 2024; awaiting final installment payment and filing of Stipulation of discontinuance with Prejudice. The Court has entered a Stipulation and Order retaining jurisdiction for 180 days to enforce the settlement terms.

Practice Area: Litigation — General

Staffing:

The matter was staffed in accordance with the firm's lean-staffing model for mid-market commercial litigation. Mr. Espinoza served as the primary day-to-day case manager, with Ms. Brinkley providing support on discovery, motion practice, and expert coordination. Both partners were actively involved in depositions, motion briefing, mediation preparation, and settlement negotiations. No additional associates, counsel, or paralegals were assigned to the matter.

II. Client Information

Client: Thalassa Shipping & Logistics SA ("TSL"), a Société Anonyme organized under the laws of the Hellenic Republic (Greece), registered with the General Commercial Registry (G.E.MH.) of the Hellenic Republic.

Headquarters: 42 Akti Miaouli, Piraeus 185 38, Greece

Registered Agent in New York: Piraeus Global Agency Corp., 30 Broad Street, Suite 1410, New York, NY 10004

Client Contacts:

• Alexandros Stavridis, Chairman and Chief Executive Officer

• Elena Papadimitriou, Chief Financial Officer

• Markos Theodorakis, General Counsel (primary day-to-day contact)

Client Profile: TSL is an international shipping, chartering, and maritime logistics company headquartered in Piraeus, Greece. The company operates a diversified fleet of approximately 34 vessels, including dry bulk carriers, tankers, and container vessels. TSL engages in both spot and period chartering activities across global trade routes, with particular concentration in the Indian Ocean, South Atlantic, and Asia-Pacific regions. For fiscal year 2022, TSL reported annual revenue of approximately $612 million and EBITDA of approximately $98 million. TSL is privately held, with the Stavridis family maintaining a controlling interest. The company is financed in part through a $340 million senior secured credit facility provided by Meridian Capital Bank AG, secured by first-priority ship mortgages on specified fleet vessels.

Co-Defendant: Aegean Fortuna Shipholding Ltd., a corporation incorporated under the laws of the Republic of Liberia (Liberian Registration No. LR-C-20167845). Aegean Fortuna Shipholding Ltd. is a wholly owned subsidiary of TSL and serves as the registered owner of the M/V Aegean Fortuna, the vessel at issue in this litigation. TSL and Aegean Fortuna Shipholding Ltd. were represented jointly by Calderwood & Harkness LLP throughout the matter, as their interests were fully aligned and no conflict existed. The defense of both defendants was conducted on a unified basis.

III. Opposing Party and Counsel

Plaintiff: Northwind Maritime Corporation, a corporation incorporated under the laws of the Republic of the marshall Islands (Entity No. MI-94827). Northwind's principal office is located at 1700 Harbor Gateway, Suite 500, Stamford, Connecticut 06902.

Northwind's Principal: Viktor Lindgren, President and Managing Director. Mr. Lindgren is a Swedish national residing in Greenwich, Connecticut, who has operated in the international dry bulk chartering market for approximately twenty-five years. He served as the primary business decision-maker for Northwind throughout the litigation and was deposed by C&H on May 30, 2024.

Northwind's Counsel:

Hargrove, Delacroix & Stern LLP ("HD&S") 600 Lexington Avenue, 28th Floor New York, NY 10022

Lead Partner: Margaret Delacroix Senior Associate: Jason Trumbull Associate: Priya Mehta

HD&S is a mid-size New York litigation firm with a recognized practice in maritime and commercial disputes. Ms. Delacroix is a well-regarded maritime litigator with extensive experience in charter-party disputes and London arbitration. She was a capable and professional adversary throughout the matter, though HD&S's litigation strategy was, at times, hampered by overreach in damages claims and discovery positions.

Northwind's marshall Islands Counsel:

Pacific Maritime Legal Associates Thomas Nauru, Managing Partner Trust Company Complex, Suite 204 Ajeltake Road, Majuro, MH 96960

Pacific Maritime Legal Associates was engaged by Northwind for marshall Islands corporate matters. Their involvement in the New York litigation was limited to providing certified corporate documentation and authority confirmation for Northwind.

IV. Case Summary and Background

A. The Underlying Dispute

This matter arose out of a 36-month time charter-party for the M/V Aegean Fortuna, a Supramax dry bulk carrier. The charter-party was executed on December 3, 2020, between Aegean Fortuna Shipholding Ltd. (as disponent owner) and Northwind Maritime Corporation (as charterer), on the New York Produce Exchange Form 2015 (NYPE 2015), as amended by addenda and rider clauses. The charter-party bears reference number NW-TSL-CP-2020-1203.

The M/V Aegean Fortuna (IMO No. 9847231) is a Supramax dry bulk carrier with a deadweight tonnage of 58,200 DWT, built in 2016, registered under the flag of the Republic of Liberia, and classified by Global Maritime Classification Bureau. The vessel was delivered to Northwind on January 15, 2021, and the charter-party was scheduled to expire on January 14, 2024.

The daily hire rate under the charter-party was $14,750 per day, yielding a total charter value over the 36-month period of approximately $16,166,000 (based on 1,095 days at $14,750/day, subject to off-hire deductions).

Northwind alleged that TSL breached its maintenance and seaworthiness obligations under Clauses 2 and 6 of the charter-party and directed the vessel to deviate from agreed trade routes in violation of Clause 5. Northwind's complaint sought total damages of $18,300,000, comprised of multiple categories of loss allegedly flowing from three mechanical incidents and one route deviation. The specifics of each incident and the deviation claim are discussed below.

B. The Three Mechanical Incidents

The core of Northwind's breach claim centered on three mechanical incidents that occurred during calendar year 2022, each of which resulted in the vessel being taken off-hire for repair.

Incident 1 — Main Engine Turbocharger Failure (March 12 – April 2, 2022)

During the vessel's Paradip-to-Mombasa voyage in the Indian Ocean, the main engine turbocharger suffered a catastrophic failure on March 12, 2022, rendering the vessel unable to maintain service speed. The Master diverted the vessel to Colombo, Sri Lanka, where repairs were conducted over a period of 22 days, from March 12 through April 2, 2022. TSL's defense to this incident was that the turbocharger failure constituted a latent defect not discoverable through the exercise of due diligence. Specifically, TSL's maritime engineering expert, Dr. Henrik Sørensen, opined that a manufacturing defect in the turbocharger's bearing assembly—originating with the OEM supplier and not detectable through standard classification survey or maintenance protocols—was the proximate cause of the failure. TSL further demonstrated that it had exercised due diligence in maintaining the turbocharger in accordance with the manufacturer's recommended maintenance schedule and applicable classification society requirements.

Incident 2 — BWTS Malfunction and Auxiliary Boiler Failure (July 8 – July 29, 2022)

On July 8, 2022, while the vessel was berthed at Richards Bay, South Africa, the ballast water treatment system (BWTS) malfunctioned, and the auxiliary boiler experienced a simultaneous failure. The vessel was placed off-hire for 21 days while repairs were undertaken, from July 8 through July 29, 2022. TSL's defense to this incident rested on charterer causation: TSL contended that the BWTS malfunction was directly caused by contaminated ballast water loaded at a prior port by Northwind's agents or sub-charterers, which introduced particulate matter and chemical contaminants into the BWTS treatment modules. Documentary evidence, including the vessel's ballast water log, port state control records, and the testimony of Chief Engineer Petros Vlahos, supported TSL's position that the BWTS system had been operating within manufacturer specifications prior to the loading of contaminated ballast. The auxiliary boiler failure, while a separate mechanical event, occurred during the same off-hire period and was addressed as part of the overall repair.

Incident 3 — Main Engine Cylinder Liner Failure (November 15 – December 10, 2022)

On November 15, 2022, the vessel's main engine suffered a cylinder liner failure requiring drydocking. The vessel was taken to Keppel Verolme Shipyard in Rotterdam, the Netherlands, where repairs were conducted over 25 days, from November 15 through December 10, 2022. TSL conceded that this incident resulted from a maintenance failure attributable to the owner, specifically an inadequate cylinder liner inspection program during the vessel's most recent scheduled maintenance period. However, TSL disputed the quantum of damages claimed by Northwind, arguing that the repair costs and consequential losses claimed were excessive and that Northwind had failed to mitigate by declining to utilize available substitute tonnage in a timely manner.

Total Off-Hire Days Claimed: 68 days (22 + 21 + 25)

C. The Route Deviation Claim

In addition to the mechanical incidents, Northwind alleged that TSL directed the M/V Aegean Fortuna to deviate from its contracted Durban-to-Qingdao voyage in September 2022 in order to call at Maputo, Mozambique, to load cargo for TSL's own commercial account. Northwind claimed that this unauthorized deviation added approximately four days to the voyage and caused Northwind to miss the laycan window for discharge at Qingdao (October 1–5, 2022), resulting in demurrage charges, dead freight, and loss of the Qingdao fixture.

Northwind's claimed damages for the deviation totaled $1,230,000, consisting of demurrage and dead freight charges incurred as a consequence of the missed Qingdao laycan.

TSL's defense was that the Maputo call was not a deviation within the meaning of Clause 5, but rather was necessitated by prevailing weather conditions and routing considerations that made the call at Maputo the prudent navigational choice, well within the Master's discretion under the charter-party. TSL presented meteorological data, routing records, and the Master's contemporaneous voyage reports in support of this position.

D. Northwind's Total Claimed Damages: $18,300,000

Northwind's complaint, as narrowed through motion practice, asserted total damages of $18,300,000, broken down into the following categories:

Several of these damages categories presented significant legal and factual challenges. The liquidated damages claim under Clause 28 was predicated on Northwind's interpretation that the $4,500,000 cap applied on a per-incident or per-period basis rather than as a single aggregate cap for the entire charter period—a position that TSL vigorously disputed. The third-party shipper claims ($5,634,400) were subject to TSL's motion to dismiss on the grounds that such claims were not recoverable as direct damages under the charter-party. The cargo damage claim ($3,420,000 for iron ore oxidation during Incident 2) was defended on the basis that any cargo damage was attributable to the BWTS contamination caused by Northwind's agents and, in any event, was subject to allocation under the Inter-Club Agreement.

E. TSL's Defenses

TSL asserted the following principal defenses, among others, in its Verified Answer:

1. Clause 28 Liquidated Damages Cap. The liquidated damages provision in Clause 28 of the charter-party established a single aggregate cap of $4,500,000 applicable to the entire charter period, not a per-incident or per-period cap as argued by Northwind. TSL maintained that this cap represented the parties' agreed-upon limitation on consequential and indirect damages and precluded Northwind from recovering in excess of this amount on its breach claims.

2. Latent Defect Defense (Incident 1). TSL exercised due diligence in maintaining the vessel and the turbocharger failure was caused by a latent manufacturing defect not discoverable through reasonable inspection or maintenance protocols. Under established charter-party law, an owner who exercises due diligence is not liable for off-hire arising from latent defects.

3. Charterer Causation (Incident 2). The BWTS malfunction was directly caused by Northwind's agents loading contaminated ballast water at a prior port. TSL bore no responsibility for the consequences of Northwind's or its agents' conduct.

4. Master's Discretion (Deviation Claim). The Maputo call was within the Master's reasonable navigational discretion and was justified by weather and routing conditions. No breach of Clause 5 occurred.

5. Inter-Club Agreement. Cargo damage claims were subject to allocation under the Inter-Club Agreement, and Northwind's attempt to recover the full amount of cargo damage ($3,420,000) as charter-party damages was barred.

6. Third-Party Shipper Claims Not Recoverable. Third-party shipper claims ($5,634,400) asserted against Northwind by cargo interests were not recoverable as direct damages under the charter-party. TSL moved to dismiss these claims, and the motion was granted in part.

7. Failure to Mitigate. Northwind failed to mitigate its damages by declining to arrange substitute tonnage in a timely manner, notwithstanding the availability of comparable vessels in the relevant markets during the off-hire periods.

F. TSL's Counterclaim

TSL filed its counterclaim on November 17, 2023, contemporaneously with its Verified Answer. The counterclaim sought $1,620,000 in unpaid hire for the period from October 1 through December 31, 2022, calculated as $14,750 per day for 110 days. TSL alleged that Northwind had improperly withheld hire payments during this period in excess of any legitimate off-hire deduction, effectively self-helping beyond the scope of the charter-party's off-hire provisions.

Northwind's position was that its withholding of hire was proper under Clause 11 (the off-hire clause) and that it was entitled to equitable setoff against the hire payments in light of TSL's alleged breaches and the damages sustained. The counterclaim was contested throughout discovery and remained a live claim at the time of mediation.

As part of the global settlement, TSL released the $1,620,000 counterclaim in its entirety. As discussed in Section VII below, this release was a negotiated component of the overall settlement and was factored into the economic analysis of the settlement terms.

V. Procedural History

A. Pre-Trial Proceedings

The following is a summary of the principal procedural events in this matter prior to the commencement of the discovery phase:

• October 2, 2023: Northwind Maritime Corporation filed its Verified Complaint in the Supreme Court of the State of New York, New York County, Commercial Division, asserting six causes of action for breach of charter-party, breach of the implied warranty of seaworthiness, negligent maintenance, indemnification for third-party shipper claims, unjust enrichment, and declaratory judgment. The complaint was accompanied by a Request for Judicial Intervention designating the matter for the Commercial Division.

• October 16, 2023: TSL engaged Calderwood & Harkness LLP to represent both TSL and Aegean Fortuna Shipholding Ltd. in the defense of this action. C&H Matter No. 1044-00006 was opened, with Douglas Carmichael designated as Responsible Partner and Francesca Morano as Billing Partner. An engagement letter was executed with TSL's General Counsel, Markos Theodorakis, on the same date.

• November 17, 2023: TSL's Verified Answer and Counterclaim were filed. The Answer asserted seven affirmative defenses, including the Clause 28 liquidated damages cap, latent defect, charterer causation, Master's discretion, Inter-Club Agreement, failure to mitigate, and failure to join indispensable parties. The counterclaim sought $1,620,000 in unpaid hire.

• December 15, 2023: TSL filed a Motion to Dismiss Counts III (indemnification for third-party shipper claims) and V (unjust enrichment) of the complaint pursuant to CPLR 3211(a)(1) and (a)(7). The motion was fully briefed by February 9, 2024.

• March 8, 2024: Justice Chen issued a written decision on the Motion to Dismiss. The motion was granted in part:

(a) Count V (Unjust Enrichment) was dismissed in its entirety. Justice Chen held that the unjust enrichment claim was duplicative of the breach of contract claims and could not stand where the parties' rights were governed by a detailed written charter-party.

(b) Count III (Third-Party Shipper Claims) was narrowed. Justice Chen dismissed the claim insofar as it sought indemnification for third-party shipper claims arising from Incidents 1 and 3, finding that the shipper claims at issue were too remote and speculative. However, the Court permitted the claim to proceed with respect to Incident 2 (the BWTS malfunction and associated cargo damage), where the nexus between the alleged breach and the third-party claims was more direct.

The partial dismissal was a significant early victory for TSL, as it eliminated Northwind's unjust enrichment theory and substantially reduced the exposure associated with the third-party shipper claims from $5,634,400 to a significantly narrower subset of claims.

B. Discovery. The discovery period ran from approximately January 2024 through August 2024. The following is a summary of principal discovery events:

• January 22, 2024: TSL served its First Set of Interrogatories (Nos. 1–25) and First Request for Production of Documents (Nos. 1–58) on Northwind. These discovery requests targeted, among other things, Northwind's damages calculations, the Eastbourne Bulk Carriers Ltd. sub-charter arrangement, the circumstances of the ballast water loading at the port prior to Richards Bay, Northwind's mitigation efforts, and the third-party shipper claims.

• February 28, 2024: Northwind served responses and objections to TSL's first set of discovery requests. The responses were generally adequate, though certain categories of documents—most notably, the Eastbourne Bulk Carriers sub-charter documents and related correspondence—were produced in incomplete or redacted form, prompting a subsequent discovery dispute.

• April 5, 2024: C&H sent a detailed meet-and-confer letter to HD&S regarding Northwind's deficient production of the Eastbourne Bulk Carriers sub-charter documents. TSL contended that full production of the sub-charter agreement, fixture recap, hire invoices, and related correspondence was necessary to evaluate Northwind's lost sub-charter profit claim ($166,600) and to test Northwind's mitigation defense. HD&S initially resisted, asserting that certain documents were protected by commercial confidentiality obligations. After an exchange of correspondence and a telephonic meet-and-confer session, the dispute was resolved without the necessity of a discovery motion. Northwind produced the sub-charter documents subject to a confidentiality stipulation and protective order entered by the Court on April 22, 2024.

• Depositions Completed:

The depositions of Viktor Lindgren and Sandra Chow were particularly productive for TSL's defense. Mr. Lindgren acknowledged under examination that Northwind had not contacted any shipbroker to arrange substitute tonnage during the off-hire period for Incident 1, undermining Northwind's damages claim for substitute charter costs and supporting TSL's failure-to-mitigate defense. Ms. Chow's testimony regarding Northwind's internal accounting for the off-hire periods was inconsistent with the damages model presented in the complaint and was used effectively during the expert phase and mediation.

Additionally, the deposition of Chief Engineer Vlahos provided detailed testimony regarding the ballast water loading procedures and the condition of the BWTS prior to and after the loading of contaminated ballast, supporting TSL's charterer-causation defense for Incident 2.

• E-discovery: Electronic discovery was managed by Lighthouse Data Analytics Inc., which was engaged to collect, process, review, and produce electronically stored information from TSL's document custodians. Lighthouse processed approximately 1.2 million documents, of which approximately 48,000 were reviewed and approximately 22,000 were produced. The total cost of e-discovery services is reflected in the cost summary in Section VIII below.

C. Expert Phase

Both parties retained expert witnesses in two disciplines: maritime engineering/operations and economic damages.

TSL's Experts:

• Dr. Henrik Sørensen, Nordic Maritime Consulting Group ApS, Copenhagen, Denmark — maritime engineering expert. Dr. Sørensen is a licensed marine engineer with over thirty years of experience in vessel maintenance, classification, and failure analysis. He provided expert opinions on the latent defect defense for Incident 1 (turbocharger bearing assembly manufacturing defect), the charterer-causation defense for Incident 2 (BWTS contamination attributable to contaminated ballast loading), and the reasonableness of the Maputo deviation in light of weather and routing conditions. Dr. Sørensen's analysis was thorough and well-documented, drawing on metallurgical testing results, manufacturer records, and industry maintenance standards.

• Dr. Constance Albright, Clearwater Economics LLC, Washington, D.C. — damages expert. Dr. Albright provided expert opinions on the proper interpretation and application of the Clause 28 liquidated damages cap (opining that the $4,500,000 cap was a single aggregate cap for the entire charter period), the reasonableness of Northwind's damages calculations, the availability and cost of substitute tonnage, and Northwind's failure to mitigate. Dr. Albright's alternative damages model reduced Northwind's recoverable damages to a range of $3,200,000 to $5,800,000 under various scenarios.

Northwind's Experts:

• Captain Julian Blackmore (Ret.), Blackmore Maritime Advisory Ltd., London, United Kingdom — maritime operations expert. Captain Blackmore, a retired master mariner, provided opinions on the seaworthiness of the M/V Aegean Fortuna, the adequacy of TSL's maintenance program, and the characterization of the Maputo call as an unauthorized deviation.

• Dr. Rajesh Anand, Pinnacle Valuation Partners LLP, New York, New York — damages expert. Dr. Anand provided opinions supporting Northwind's $18,300,000 damages claim, including the per-incident interpretation of the Clause 28 liquidated damages cap.

Expert Report Schedule:

• TSL's opening expert reports served: August 5, 2024

• Northwind's opening expert reports served: August 19, 2024

• Rebuttal reports served by both parties: September 9, 2024

No motions to exclude expert testimony (Frye motions) were filed by either party, though C&H considered and prepared a draft motion challenging certain aspects of Dr. Anand's damages methodology, which was ultimately rendered moot by the settlement.

D. Summary Judgment

On September 20, 2024, TSL filed a Motion for Partial Summary Judgment pursuant to CPLR 3212, seeking adjudication of two discrete issues:

Issue 1: That Clause 28 of the charter-party establishes a single aggregate liquidated damages cap of $4,500,000 applicable to the entire charter period, and that Northwind's interpretation—under which the cap would apply on a per-incident or per-period basis, effectively permitting recovery well in excess of $4,500,000—was contrary to the plain language of the charter-party and established principles of contract interpretation.

Issue 2: Dismissal of the deviation claim on the grounds that the Maputo call fell within the Master's reasonable navigational discretion as a matter of law, based on the undisputed meteorological evidence and routing records.

The motion was supported by the declarations of Carlos Espinoza, Dr. Henrik Sørensen, and Dr. Constance Albright, together with a comprehensive Rule 19-a Statement of Undisputed Material Facts. Northwind filed its opposition on October 18, 2024, and TSL's reply was served on November 1, 2024. Oral argument was scheduled for December 6, 2024.

The motion was withdrawn with prejudice by joint stipulation dated November 25, 2024, as part of the settlement. As discussed in Section VII below, the pendency of the motion and the strength of TSL's arguments on both issues were significant factors in the mediation and contributed to Northwind's willingness to negotiate a favorable settlement.

E. Mediation and Settlement

On October 15, 2024, Justice Chen entered an order directing the parties to engage in mediation prior to the scheduled summary judgment argument. The parties jointly selected the Honorable Gerald K. Fitzpatrick (Ret.), a former Justice of the Commercial Division, as mediator. The mediation was conducted under the auspices of Bayside Dispute Resolution Services LLC.

The mediation was held over two days on October 28 and 29, 2024, at the offices of Bayside Dispute Resolution Services LLC, 140 Broadway, Suite 3200, New York, NY 10005. Both days involved full-day sessions, with Judge Fitzpatrick conducting shuttle diplomacy between the parties' respective caucus rooms. TSL's mediation team included Messrs. Carmichael and Espinoza from C&H, Markos Theodorakis (TSL General Counsel), and Elena Papadimitriou (TSL CFO). Northwind's mediation team included Ms. Delacroix and Mr. Trumbull from HD&S and Viktor Lindgren.

Settlement in principle was reached on the evening of October 29, 2024. The material terms were memorialized in a one-page mediator's term sheet signed by counsel for both parties. The term sheet was expressly stated to be binding and enforceable pending the execution of a comprehensive settlement agreement.

Following six rounds of drafting and negotiation between C&H and HD&S, the Settlement Agreement and Mutual General Release was executed on November 20, 2024 (the "Effective Date"). The principal terms of the settlement are set forth in Section VI below.

F. Post-Settlement Court Filings

Following execution of the Settlement Agreement, the following filings were made or are pending:

• November 25, 2024: Stipulation withdrawing TSL's Motion for Partial Summary Judgment with prejudice, executed by counsel for both parties and filed with the Court.

• November 25, 2024: Joint letter from C&H and HD&S to Justice Chen advising the Court that the matter has been resolved by settlement and requesting that the December 6, 2024 conference and argument be vacated.

• November 26, 2024: Stipulation and Order Retaining Jurisdiction for 180 Days, so-ordered by Justice Chen. This order provides that the Court retains jurisdiction over the matter for a period of 180 days from the date of the order for the purpose of enforcing the terms of the Settlement Agreement, in accordance with Teitelbaum Holdings, Ltd. v. Gold, 48 N.Y.2d 51 (1979).

• Pending — Stipulation of discontinuance with Prejudice: A proposed Stipulation of discontinuance with Prejudice has been drafted and exchanged between counsel. Per Section 10.1 of the Settlement Agreement, the Stipulation is to be filed within 10 business days of TSL's final settlement payment (Payment 3, due on or before April 19, 2025).

• Pending — Proposed Consent Judgment: Per Section 7.3 of the Settlement Agreement, a proposed Consent Judgment has been prepared and is held in escrow. The Consent Judgment is to be filed only in the event of a TSL payment default and provides for the entry of judgment against TSL for the unpaid balance of the settlement amount, plus interest at the rate of 9% per annum (the New York statutory rate).

VI. Case Disposition — Settlement Terms

A. Settlement Amount

The total settlement amount is $7,850,000. This figure represents approximately 42.9% of Northwind's total claimed damages of $18,300,000. Considering that TSL simultaneously released its $1,620,000 counterclaim as part of the global settlement, the net economic cost to TSL is $6,230,000 ($7,850,000 settlement payment minus $1,620,000 waived counterclaim), representing approximately 34.0% of Northwind's asserted claim.

B. Payment Structure

The settlement amount is payable in three installments as follows:

The three-installment payment structure was a negotiated accommodation of TSL's cash flow considerations. TSL's CFO, Elena Papadimitriou, confirmed that the payment schedule is aligned with TSL's anticipated cash flows from vessel employment and hire receipts during Q4 2024 and Q1/Q2 2025.

C. Funding Sources

The $7,850,000 settlement will be funded from the following sources:

• TSL corporate funds: $5,350,000

• Oceanus Mutual Protection & Indemnity Club contribution: $2,500,000

The P&I Club contribution is made pursuant to TSL's Protection & Indemnity insurance coverage under Policy No. OCE-P&I-2020-TSL-0047. The Oceanus Club's Board of Directors approved the $2,500,000 contribution on November 22, 2024, as confirmed by David Okafor, Claims Handler, Oceanus Mutual Protection & Indemnity Club. The Club's contribution is allocated to the charter-party liability exposure arising from Incidents 2 and 3, consistent with the scope of P&I cover. Early and proactive engagement with the Club's claims department was instrumental in securing timely Board approval.

D. Escrow Arrangements

All settlement payments are to be deposited into an escrow account maintained at:

Atlantic Fiduciary Trust Company 60 Wall Street, Suite 2800 New York, NY 10005

Contact: Martin Schreiber, Vice President, Escrow Services Escrow Account No.: ESC-2024-NYK-08831

Funds held in escrow will be released to Northwind upon joint written instruction of counsel for TSL and Northwind. In the event of a dispute regarding the release of escrowed funds, the escrow agent is authorized to interplead the funds with the Court.

E. Key Settlement Terms

The material terms of the Settlement Agreement and Mutual General Release, executed November 20, 2024, are summarized as follows:

1. Mutual General Release. Both parties, together with their respective affiliates, subsidiaries, officers, directors, employees, agents, successors, and assigns, exchange a mutual general release of all claims, counterclaims, cross-claims, and third-party claims arising out of or relating to the charter-party, the M/V Aegean Fortuna, and the subject matter of the litigation.

2. Release of Counterclaim. TSL's $1,620,000 counterclaim for unpaid hire is released in full as part of the global settlement. The net economic cost to TSL is $6,230,000 ($7,850,000 settlement minus $1,620,000 waived counterclaim).

3. Confidentiality. The terms of the Settlement Agreement, including the settlement amount and payment schedule, are strictly confidential. Permitted disclosures are limited to (a) the parties' respective insurers, lenders, and auditors; (b) the parties' respective legal and financial advisors; and (c) disclosures required by applicable law, regulation, or court order.

4. No Admission of Liability. The settlement does not constitute an admission of liability, fault, or wrongdoing by either party.

5. Consent Judgment. In the event that TSL fails to make any installment payment within five business days of the applicable due date, Northwind is entitled, without further notice to TSL, to enter a consent judgment against TSL and Aegean Fortuna Shipholding Ltd. for the unpaid balance of the settlement amount, plus interest at the rate of 9% per annum (the New York statutory rate) accruing from the date of default.

6. Return/Destruction of discovery Materials. Within 60 days of TSL's final settlement payment, both parties are required to return or destroy all discovery materials, including documents, electronically stored information, deposition transcripts, and expert reports produced by the other party, and to certify compliance in writing.

7. Stipulation of discontinuance. A Stipulation of discontinuance with Prejudice is to be filed within 10 business days of TSL's final settlement payment.

F. Lender Notification

Section 8.14 of TSL's Credit Agreement dated April 1, 2019 with Meridian Capital Bank AG requires TSL to provide written notice to the lender within five business days of the execution of any settlement agreement or consent to the entry of any judgment in an amount exceeding $5,000,000. The $7,850,000 settlement exceeds this threshold.

A notification letter was prepared by C&H in coordination with TSL's General Counsel and was sent to Lukas Brandt, Relationship Manager at Meridian Capital Bank AG, on November 22, 2024. The notification described the nature of the litigation, the principal terms of the settlement (including the payment schedule and funding sources), and confirmed that the settlement does not constitute a default or event of default under the Credit Agreement or any related loan document.

Meridian Capital Bank AG holds a $340,000,000 senior secured credit facility with TSL, secured by first-priority ship mortgages on specified fleet vessels. As of the date of this report, no adverse reaction or follow-up inquiry has been received from Meridian in response to the notification.

G. Insurance Notifications

The following insurance notifications were made in connection with the settlement:

1. Oceanus Mutual Protection & Indemnity Club: Formal claim notice was provided to the Club at the inception of the litigation. A settlement contribution request was submitted in connection with the mediation, and the Club's Board of Directors approved a $2,500,000 contribution on November 22, 2024, as confirmed by David Okafor, Claims Handler.

2. Fortis Marine Underwriters Ltd. (Hull & Machinery Insurer): Catherine Allsworth, Claims Manager, was notified of the settlement on November 21, 2024, in connection with H&M Policy No. FMU-HM-2020-4892. Fortis confirmed that the settlement does not impair or waive any subrogation rights that Fortis may hold against third parties (including the turbocharger OEM manufacturer) in connection with Incident 1.

3. Castellan Professional Liability Insurers Ltd. (D&O Insurer): Notified on November 25, 2024, as a precautionary measure. No D&O claim is anticipated, and the notification was made solely for compliance with the D&O policy's reporting obligations.

VII. Assessment of Outcome

A. Litigation Risk Analysis

The settlement at $7,850,000 represents, in the judgment of the undersigned partners, a favorable outcome for TSL relative to the litigation risks presented by the case. The following analysis supports this assessment.

TSL's defense posture was strongest with respect to the following issues:

1. Clause 28 Liquidated Damages Cap. TSL's interpretation of the Clause 28 cap—that it established a single aggregate cap of $4,500,000 for the entire charter period—was well-supported by the plain language of the provision, the negotiation history, and applicable precedent. Dr. Albright's expert analysis reinforced this reading. Had the Court adopted TSL's interpretation on summary judgment, Northwind's maximum recovery on the breach claims (exclusive of off-hire deductions, which are mechanically separate) would have been capped at $4,500,000 regardless of the number of incidents. Northwind's competing per-incident or per-period interpretation, while not frivolous, was a stretch of the contractual language and would have required the Court to read additional terms into the provision that were not present.

2. Latent Defect Defense (Incident 1). The latent defect defense for the turbocharger failure was well-supported by Dr. Sørensen's metallurgical analysis, the manufacturer's records, and TSL's maintenance logs. The defense had a strong probability of success, which would have eliminated Northwind's recovery for the 22 days of off-hire attributable to Incident 1.

3. Charterer Causation (Incident 2). The evidence supporting TSL's position that the BWTS malfunction was caused by contaminated ballast loaded by Northwind's agents was substantial, including the vessel's ballast water log, Chief Engineer Vlahos's testimony, and Dr. Sørensen's analysis. This defense, if accepted, would have eliminated Northwind's recovery for the 21 days of off-hire attributable to Incident 2 and, critically, the $3,420,000 cargo damage claim.

TSL's defense was weakest with respect to the following issues:

1. Incident 3 (Cylinder Liner Failure). TSL conceded that the cylinder liner failure was a maintenance failure attributable to the owner. The dispute was limited to quantum. TSL's exposure on this incident—including 25 days of off-hire, repair costs, and some measure of consequential damages—was real and could not be eliminated through dispositive motion practice.

2. Deviation Claim. The Maputo deviation presented mixed facts. TSL's weather and routing justification was supportable but not overwhelming. The meteorological data showed that weather conditions in the Mozambique Channel were adverse but not necessarily so severe as to require the Maputo call. Justice Chen's ruling on the summary judgment motion would have been uncertain, and the issue could well have gone to trial.

The pending Motion for Partial Summary Judgment, filed on September 20, 2024, had reasonable prospects of success on both issues. However, the outcome was uncertain, particularly on the deviation claim, and the risk of an adverse ruling on either or both issues counseled in favor of settlement at a favorable figure.

The TSL Board of Directors, at its meeting on October 18, 2024, authorized the settlement of this litigation at an amount not to exceed $8,500,000. The final settlement of $7,850,000 was within and below the Board-authorized ceiling by $650,000.

B. Counterclaim Offset

The waiver of TSL's $1,620,000 counterclaim for unpaid hire was a negotiated component of the global settlement and was expressly factored into the settlement calculus. The counterclaim was a legitimate claim, but it carried litigation risk: Northwind asserted that its withholding of hire was proper under Clause 11 (the off-hire clause) and that it was entitled to equitable setoff against the hire payments in light of TSL's breaches. While TSL believed its counterclaim had merit, the risk of a partial or complete adverse determination on the setoff defense was meaningful.

The net economic cost to TSL of the settlement—$6,230,000 ($7,850,000 minus $1,620,000)—reflects the value of the waived counterclaim as an implicit offset. On a net basis, the settlement represents approximately 34.0% of Northwind's $18,300,000 claim.

C. Settlement vs. Continued Litigation

The decision to settle was informed by the following considerations:

• Trial Timeline and Additional Costs. Trial was estimated for late Q1 or Q2 2025, assuming resolution of the pending summary judgment motion. Additional C&H fees and costs through trial were estimated at $800,000 to $1,200,000, inclusive of trial preparation, trial testimony (including expert testimony), and post-trial motions.

• Range of Trial Outcomes. Based on the litigation team's assessment of the strengths and weaknesses of each party's positions, the estimated range of trial outcomes was an adverse judgment of $4,500,000 to $12,000,000. The low end of this range assumed favorable rulings on the Clause 28 cap, the latent defect defense, and the charterer causation defense, with exposure limited primarily to Incident 3 and some component of the deviation claim. The high end assumed adverse rulings on the Clause 28 cap interpretation and the deviation claim, with partial success for Northwind on the cargo damage and third-party shipper claims.

• Elimination of Execution Risk. A settlement eliminates the risk of an adverse judgment that could exceed the settlement amount, as well as the risk of post-judgment enforcement proceedings and potential appeals.

• Management Distraction. Continued litigation, including trial preparation and trial, would have required significant time commitments from TSL's senior management, including Chairman Stavridis and General Counsel Theodorakis, diverting their attention from TSL's core business operations.

• Reputational Considerations. A public trial involving allegations of vessel maintenance failures and unseaworthiness—even if ultimately unsuccessful—could have adverse reputational consequences for TSL in the chartering market and with classification societies.

• Certainty. The settlement provides TSL with a fixed, certain economic outcome, payable over a manageable installment schedule, with the benefit of a mutual general release.

On balance, the settlement at $7,850,000—or $6,230,000 on a net basis after the counterclaim offset—represents a favorable resolution that falls at the lower end of the estimated range of trial outcomes while eliminating substantial additional fees, costs, and risks.

VIII. Financial Summary — Fees and Costs

A. Fee Summary

The following table summarizes C&H's fees for the matter:

Variance: $32,375 under estimate, representing approximately 1.5% under the original fee budget. The variance is attributable primarily to the resolution of the Eastbourne sub-charter discovery dispute without motion practice (saving approximately $20,000–$30,000 in associate time) and the cancellation of the December 6, 2024 summary judgment argument due to the settlement.

B. Cost Summary

The following table summarizes disbursements and third-party costs incurred by C&H on behalf of the client:

Variance: $6,080 under estimate, representing approximately 0.9% under the original cost budget. The modest savings were realized primarily in e-discovery costs (Lighthouse's actual charges came in below the initial scoping estimate due to a lower-than-projected volume of custodian data requiring processing) and expert fees (both experts' actual invoiced amounts were marginally below the initial engagement estimates).

C. Total Client Spend (C&H Fees + Costs)

Under budget by approximately $38,455. The matter was managed within the original budget parameters throughout, with no material overruns or budget revisions requested. The litigation team maintained regular budget tracking and reporting to the client and to firm management on a monthly basis.

D. Coordinated Counsel Costs

Greek Local Counsel: Konstantinou & Rizos Law Offices (Dimitrios Konstantinou, Managing Partner), 15 Vasilissis Sofias Avenue, Athens 106 74, Greece. K&R was engaged by TSL directly for advice on Greek corporate authority, preparation and authentication of board resolutions authorizing the defense and settlement, and Hellenic maritime regulatory matters. K&R's fees were billed directly to the client and are not reflected in C&H's fee and cost totals. C&H coordinated closely with K&R throughout the matter, particularly in connection with the preparation of corporate authority documents for the Verified Answer and Counterclaim, the Board resolution authorizing settlement, and the execution formalities for the Settlement Agreement.

IX. Key Takeaways and Lessons Learned

A. Litigation Strategy

The following strategic observations are offered for the benefit of the firm's litigation practice:

1. Value of Early Dispositive Motions. The early motion to dismiss Counts III and V (filed December 15, 2023, decided March 8, 2024) was a high-value strategic investment. The complete dismissal of Count V (unjust enrichment) eliminated a potentially expansive equitable theory that could have complicated the damages analysis. More importantly, the narrowing of Count III (third-party shipper claims) substantially reduced Northwind's effective claim by removing or limiting the $5,634,400 in third-party shipper claims to a narrow subset relating to Incident 2. This narrowing significantly altered the parties' respective negotiating positions and was a recurring theme in the mediation.

2. Expert Selection and Preparation. The selection of Dr. Henrik Sørensen and Dr. Constance Albright as TSL's testifying experts proved to be a significant strength of the defense. Dr. Sørensen's metallurgical analysis of the turbocharger failure provided compelling support for the latent defect defense, and his opinions on the BWTS contamination were grounded in detailed technical analysis that was difficult for Northwind's experts to rebut. Dr. Albright's economic analysis of the Clause 28 liquidated damages cap, drawing on contract interpretation principles and industry custom, provided a rigorous framework for limiting Northwind's damages. The quality and credibility of TSL's experts were acknowledged by the mediator during settlement discussions and were a factor in Northwind's willingness to negotiate.