Extract to table
Pull the structured facts out of a document: parties, dates, amounts, obligations.
Extract to table / letter-to-wbc-site-plan-concerns.docx
letter-to-wbc-site-plan-concerns.docx
Parties
HARKNESS LLP
Calloway LLP
Meridian Consumer Brands LLC
Dates
September 28, 2022
June 22, 2022
September 30, 2022
November 15, 2022
July 18, 2022
August 12, 2022
September 2, 2022
September 14, 2022
October 21, 2022
Amounts
$12,000,000
$1,200,000
$4.03
$15.00
$4,462,500
$4,102,500
$360,000
$1,850,000
Obligations
Adequate trailer staging capacity is essential for MCB's inbound and outbound logistics operations, particularly during peak shipping periods when trailers are pre-loaded or staged for carrier pickup and when inbound trailers must be held pending dock availability
The reconfigured building will necessarily require a revised scope of landlord's work — for example, the LED lighting plan must be redesigned for the revised warehouse footprint, the ESFR sprinkler layout must be reengineered, and the number and location of dock levelers will change
The cost and scope of landlord's work must be reassessed in light of these changes
These drawings must be stamped and sealed by a licensed professional engineer registered in the State of New Jersey and must reflect the final, as-approved configuration — not preliminary, conceptual, or schematic-level plans
Reservation of Rights / No Waiver MCB expressly states that nothing in this letter, nor MCB's continued engagement in discussions with Stonebridge or its representatives, shall be deemed a waiver of any of MCB's rights, claims, or remedies, whether arising under the LOI, at law, or in equity