Parties

HARKNESS LLP
Stonefield Logistics Group Inc
Vantor Holdings Corp
Vantor Transport Services LLC
Kensington Analytics Group LLC
Parties Stonefield Logistics Group Inc
Shapiro LLP
Ashford Meridian LLP

Dates

September 20, 2023
September 1, 2022
March 15, 2019
November 12, 2021
August 4, 2023
September 22, 2021
October 3, 2023
April 1, 2019
March 31, 2024
January 18, 2022

Amounts

$95.4
$8.2
$67.23
$4.5
$5.5
$7.2
$4.42
$1.28
$118
$680

Obligations

The TSA imposed five Service Level Obligations on VTS, each measured on a quarterly basis: • On-Time Pickup: ≥ 95% of all tendered loads must be picked up within the designated pickup window
• On-Time Delivery: ≥ 93% of all tendered loads must be delivered within the designated delivery window
• Tender Acceptance: ≥ 90% of all load tenders must be accepted by VTS
• Equipment Availability: ≥ 85% of the committed fleet capacity — defined as 400 tractors and 1,200 trailers — must be available and operational for SLG-dedicated freight at all times during the measurement period
Under New York law, a breaching party's damages recovery must be offset by the economic impact of its own non-performance
At minimum, one of these two categories must be eliminated