FR EA

Extract to table

Pull the structured facts out of a document: parties, dates, amounts, obligations.

Extract to table / h1b-cap-petition-strategy-memo-fy2026.docx
h1b-cap-petition-strategy-memo-fy2026.docx · 1014-00002

Parties

Harkness LLP
Optiwave Semiconductor Corp
Parekh LLP
Pendleton Accounting Group LLP
Sentinel Background Verification Corp
Halcyon Services Inc
Severin Partners LLC

Dates

May 28, 2025
April 1, 2025
March 7, 2025
June 30, 2025
June 25, 2025
October 1, 2025
September 30, 2025
April 30, 2025
May 20, 2025
May 22, 2025

Amounts

$2,805
$5,650
$780
$215
$500
$750
$600
$6,500
$187.4
$1,935

Obligations

We must verify the underlying I-20 and EAD validity to ensure that Mr
OPT Bridge: We must confirm that Mr
OWS must ensure continued compliance with STEM OPT reporting obligations, including the annual validation report
We must confirm whether Mr
We must confirm Mr
The Photonics Process Engineer must independently develop and optimize PIC fabrication processes; the Analog Design Engineer must design complex analog circuits for PIC driver applications; the Verification Engineer must develop sophisticated UVM testbenches and apply formal verification techniques; the Thermal Engineer must perform advanced thermal simulations using FEA tools; and the EDA Tools Developer must design algorithms for photonic-specific design rule checking