FR EA

Extract to table

Pull the structured facts out of a document: parties, dates, amounts, obligations.

Extract to table / draft-falk-industry-report.docx
draft-falk-industry-report.docx · 1014-00004

Parties

Plaintiff Optiwave Semiconductor Corp
Harkness LLP
Whitfield LLP
Market Participants Optiwave Semiconductor Corp
Associates LLP
Silverstone Capital Markets LLC
CrossPoint Networking Corp
Cruz LLP

Dates

June 15, 2025
August 8, 2024
December 12, 2022
June 15, 2018
November 5, 2024
November 19, 2024
December 10, 2024
January 7, 2025
January 15, 2023
May 15, 2023

Amounts

$650
$375,000
$34.5
$487.3
$61.4
$312.6
$780
$24.00
$37.00
$3.4

Obligations

Once a module is qualified and deployed into a data-center fabric, switching costs are substantial: qualification testing must be re-run, firmware and management-plane integration must be re-validated, and the customer must accept the risk of introducing a new supplier into a mission-critical infrastructure element
Because the polarization state of light emerging from a standard single-mode fiber is generally unknown and varies over time, approximately half of the incoming optical power is lost or must be recovered through external polarization control — an approach that increases module cost, complexity, and physical footprint