Parties

Optiwave Semiconductor Corp
Harkness LLP
Morin LLP

Dates

January 9, 2023
January 10, 2022
January 10, 2023
March 15, 2023
June 22, 2023

Amounts

—

Obligations

For high-speed operation, the electrical signal driving the phase shifters must propagate along the modulator arm in a manner that maintains temporal alignment with the optical signal propagating through the waveguide
In addition, the characteristic impedance of the electrode transmission line must be matched to the impedance of the RF driver circuit (typically 50 Ω) to minimize reflections and maximize power transfer