Extract to table / letter-to-ferc-partial-response-transmittal.docx
letter-to-ferc-partial-response-transmittal.docx
Parties
HARKNESS LLP
Ridgeline Midstream Services LLC
Dunmore Energy Holdings Ltd
Braswell Energy Consulting Group LLC
Tenneco Inc
Dillard LLP
Sable LLP
President Ridgeline Midstream Services LLC
Dates
March 15, 2023
January 19, 2023
May 12, 2022
June 14, 2022
June 21, 2022
August 15, 2022
July 28, 2022
August 1, 2022
September 22, 2022
November 14, 2022
Amounts
$0.2265
$0.2223
$0.0042
$97.36
$612.40
$400
$150
$22.3
$7.6
$14.7
Obligations
Item 8: Inadequate shipper-must-have-title provisions in the proposed tariff
Item 8 — Shipper-Must-Have-Title Provisions The Deficiency Letter noted that Ridgeline's proposed tariff contained inadequate provisions addressing the requirement that shippers tendering gas for transportation must hold title to the gas at the points of receipt and delivery
The Office of Energy Market Regulation directed Ridgeline to include shipper-must-have-title provisions consistent with the Commission's policy as set forth in Tenneco Inc
In response, Ridgeline provides revised tariff language for shipper-must-have-title provisions, which is enclosed as Attachment F to this filing
The proposed language requires that all shippers tendering gas for transportation on the Ridgeline Pipeline System must hold title to, or have a contractual right to, the natural gas at both the receipt point and the delivery point
8 — the shipper must hold title to or have a contractual right to the natural gas being received from the Ridgeline Pipeline System at the time such gas is redelivered by Ridgeline