FR EA

Extract to table

Pull the structured facts out of a document: parties, dates, amounts, obligations.

Extract to table / letter-to-krd-interconnection-counterproposal.docx
letter-to-krd-interconnection-counterproposal.docx · 1016-00005

Parties

HARKNESS LLP
Dillard LLP
Ridgeline Midstream Services LLC
Dunmore Energy Holdings Ltd
System Ridgeline Midstream Services LLC
Capitol Filings Inc
Keystone Corporate Services LLC
Tidewater Infrastructure Partners LP

Dates

November 22, 2022
August 15, 2022
October 17, 2022
September 22, 2022
November 14, 2022
December 5, 2022
October 1, 2021
December 16, 2022
September 12, 2022

Amounts

$587.2
$6.1
$22.3
$14.7
$7.6
$11.15
$0.058

Obligations

0), this counterproposal shall be deemed to supersede the earlier document for purposes of ongoing negotiations, subject to the parties' mutual agreement on final terms
All ultrasonic meters shall be multipath instruments meeting or exceeding the accuracy requirements set forth in American Gas Association Report No
The minimum accuracy requirement for each meter shall be ±0
All ultrasonic meters shall be factory-calibrated by the meter manufacturer at a recognized, accredited flow calibration facility prior to shipment
The heating value of the gas stream, as determined by the gas chromatograph analysis, shall be expressed in British Thermal Units per cubic foot (BTU/cf) at standard conditions (14
For purposes of the Dth conversion used in Ridgeline's tariff rate calculations, an assumed base heating value of 1,000 BTU/cf shall be applied, with actual measured heating values used for custody transfer settlements between the parties on a daily basis