Pull the structured facts out of a document: parties, dates, amounts, obligations.

Extract to table / answer-to-atpc-protest.docx
answer-to-atpc-protest.docx · 1016-00005

Parties

COMMISSION Ridgeline Midstream Services LLC
OF RIDGELINE MIDSTREAM SERVICES LLC
HARKNESS LLP
Ridgeline Midstream Services LLC
STATEMENT Ridgeline Midstream Services LLC
Dunmore Energy Holdings Ltd
Tidewater Infrastructure Partners LP
Keystone Corporate Services LLC

Dates

October 17, 2022
August 15, 2022
September 22, 2022
May 12, 2022
June 14, 2022
October 1, 2021
June 17, 2022
July 28, 2022
August 1, 2022

Amounts

$14.7
$7.6
$22.3
$3.55
$587.2
$0.2265
$0.2223
$0.0042
$612.40
$97.36

Obligations

These facilities are required due to the physical characteristics and operational requirements of ATPC's existing system and must be constructed to ATPC's specifications
These modifications are necessitated by ATPC's existing system configuration and are properly charged to ATPC as the operator of the existing system that must be modified to accommodate the interconnection
• The Metering Station must be constructed to conform to ATPC's measurement specifications for the receipt of gas into the ATPC System
These facilities include modifications to ATPC's existing 30-inch mainline, ATPC-side piping and transition facilities, the Metering Station (which must conform to ATPC's measurement specifications), the pig receiver, and ATPC's SCADA interface equipment