Extract to table
Pull the structured facts out of a document: parties, dates, amounts, obligations.
Extract to table / second-motion-extension-of-time.docx
second-motion-extension-of-time.docx
Parties
OF RIDGELINE MIDSTREAM SERVICES LLC
STATEMENT Ridgeline Midstream Services LLC
Dunmore Energy Holdings Ltd
Harkness LLP
Braswell Energy Consulting Group LLC
Ridgeline Midstream Services LLC
Dillard LLP
Sable LLP
Dates
August 25, 2023
August 28, 2023
February 23, 2024
January 19, 2023
May 12, 2022
May 10, 2023
October 1, 2021
June 14, 2022
June 17, 2022
August 15, 2022
Amounts
$0.2265
$0.2223
$0.0042
$97.36
$612.40
$0.2560
$14.7
$22.3
$11.15
$7.6
Obligations
Inadequate shipper-must-have-title provisions; 9
The deficiency items ranged from relatively straightforward tariff drafting matters (such as the EBB posting requirements and shipper-must-have-title provisions) to complex and novel regulatory questions (such as greenhouse gas emission cost recovery and Order No
The capacity release program must be consistent with the Commission's open-access policies under 18 C
Ridgeline is required to conduct a full gap analysis of its proposed tariff against NAESB WGQ Version 3
For example, the capacity release provisions (Item 5) must be consistent with the NAESB standards (Item 6); the segmentation and flexible point provisions (Item 12) affect the billing determinants and rate design, which in turn are affected by the GHG cost recovery provisions (Item 13); and the creditworthiness provisions (Item 11) must account for the credit implications of capacity release transactions (Item 5) and GHG cost obligations (Item 13)
Accordingly, the tariff redesign cannot proceed in a piecemeal fashion but must be developed as an integrated, internally consistent whole