FR EA

Extract to table

Pull the structured facts out of a document: parties, dates, amounts, obligations.

Extract to table / memo-flu-tracker-mechanism.docx
memo-flu-tracker-mechanism.docx · 1016-00005

Parties

Harkness LLP
Dunmore Energy Holdings Ltd
Ridgeline Midstream Services LLC
Braswell Energy Consulting Group LLC
Dillard LLP
Sable LLP

Dates

July 14, 2023
January 19, 2023
May 12, 2022
April 15, 2023
October 1, 2021
March 31, 2023
February 21, 2025
March 4, 2024
March 15, 2023
February 6, 2023

Amounts

$97.36
$587.2
$22.3
$0.2265
$0.2223
$0.0042
$612.40
$563.71
$18.64
$12.45

Obligations

The FL&U tracker is one of several critical tariff design elements that must be resolved before the redesigned tariff is ready for filing
The Deficiency Letter described the absence of an FL&U tracker as a material deficiency that must be cured before the tariff could be accepted for filing
The consistent themes emerging from this body of precedent are: (i) FL&U trackers are strongly encouraged for interstate natural gas pipelines; (ii) in-kind percentage retention is the preferred structure; (iii) separate tracking and reporting of fuel-use and L&U components is required; (iv) periodic true-up filings — typically annual — are necessary to ensure accuracy; and (v) shippers must have access to FL&U data and audit rights to verify the pipeline's calculations
Interaction with Other Tariff Provisions The FL&U tracker mechanism does not operate in isolation; it interacts with numerous other provisions of the Ridgeline tariff, and its design must be coordinated with those provisions to ensure internal consistency and avoid unintended consequences
15 million must be adjusted to exclude fuel costs to the extent they are recovered through the FL&U tracker, to avoid double recovery
The FL&U reporting and nomination processes must comply with the applicable standards of the North American Energy Standards Board Wholesale Gas Quadrant ("NAESB WGQ") Version 3