Extract to table
Pull the structured facts out of a document: parties, dates, amounts, obligations.
Extract to table / environmental-liability-cost-allocation-memo.docx
environmental-liability-cost-allocation-memo.docx
Parties
HARKNESS LLP
Dunmore Energy Holdings Ltd
Pinehill Environmental Consulting LLC
Whitfield Barr LLP
Calera Properties Group LLC
Sullivan LLP
TCEQ Inc
Dates
July 9, 2025
October 15, 2017
December 31, 2017
December 31, 2024
June 25, 2025
October 31, 2025
May 12, 2025
July 11, 2025
July 8, 2025
Amounts
$9.74
$7.81
$12.18
$4.647
$4.26
$387,000
$5.48
$750,000
$89
$347
Obligations
DEH's Own PRP Status It must be acknowledged that DEH, as successor-in-interest to DTS, is itself a PRP under CERCLA § 107(a)(2)
Even if some soil contamination can be geographically divided between the two tank farms, the groundwater treatment system — which must address the commingled plume as a whole — represents an indivisible remediation effort
The in-situ chemical oxidation and enhanced bioremediation program, the long-term monitoring network, and the institutional controls must be designed and implemented on a site-wide basis
§ 9613(g)(2), the limitations period for a cost-recovery action under § 107 depends on the type of response action: (i) For a remedial action, the claim must be brought within six years after initiation of physical on-site construction of the remedial action; (ii) For a removal action, the claim must be brought within three years after completion of the removal action
NCP Consistency (CERCLA-Specific) Under CERCLA § 107(a)(4)(B), a private-party plaintiff must demonstrate that its response costs were incurred "consistent with the National Contingency Plan
Accordingly, while NCP consistency remains a technical element that DEH must satisfy, it is not anticipated to present a significant vulnerability