survey-review-memorandum.docx
Parties
Harkness LLP
Dates
December 5, 2025
December 3, 2025
January 30, 2026
February 15, 2026
December 9, 2025
February 23, 2021
November 25, 2025
June 14, 2024
June 22, 2024
November 15, 2025
Amounts
$54,000,000
$336,000,000
$90,000,000
Obligations
However, the easement area must remain free of permanent structures under the terms of the easement instrument, and this constraint must be observed during design development and construction
Below-grade elements (such as foundation walls, caissons, or below-grade parking structures) may extend beyond the above-grade footprint and must also comply with setback requirements
Specifically, any new construction or substantial improvement within the Zone AE area must be designed and constructed to comply with the following: (a) All new construction must have the lowest floor (including basement) elevated to or above the BFE of 9 feet NAVD88, or must be designed with adequate floodproofing measures
(b) Materials used below the BFE must be flood-resistant
(c) Construction must not reduce the flood-carrying capacity of the floodplain
(d) A development permit must be obtained from the Baltimore City Floodplain Administrator prior to any construction within the Zone AE area