FR EA

Extract to table

Pull the structured facts out of a document: parties, dates, amounts, obligations.

Extract to table / claim-construction-analysis-memo.docx
claim-construction-analysis-memo.docx · 1037-00004

Parties

Solstice Biomedical Devices Ltd
Lau LLP
AWH Corp
See Festo Corp
Under Festo Corp
Norian Corp
Raytek Corp
Under Kestrel Partners LLC

Dates

October 15, 2024
November 18, 2024
October 22, 2024
November 4, 2024
October 28, 2024
September 30, 2024
September 5, 2024
November 14, 2017
June 22, 2035
April 30, 2019

Amounts

$74.6
$12.1

Obligations

The intrinsic record — comprising the claim language itself, the specification (including the written description and drawings), and the prosecution history — is the primary source for claim construction and must be considered in every case
The seal must incorporate a structural feature — such as a cam ring, a detent, a snap-fit tab, or the like — that affirmatively locks the seal into a fixed position
This construction limits the term in two important respects: (i) the retraction must be automatic (i
occurring upon release of the actuating force, without the need for a separate user action to initiate retraction), and (ii) the retraction must be driven by a stored-energy element (i
The key requirement of this construction is that the proximal end of the cannula must include a defined mechanical interface — a specifically configured surface that mates with the seal assembly through a defined coupling mechanism
" The addition of "interface" must carry independent meaning, and that meaning, informed by the specification, is a defined mechanical coupling structure