FR EA

Extract to table

Pull the structured facts out of a document: parties, dates, amounts, obligations.

Extract to table / solstice-claim-construction-brief.docx
solstice-claim-construction-brief.docx · 1037-00004

Parties

HARKNESS LLP
AWH Corp
Micro Int'l Ltd
Adriatic Partners LLC
Festo Corp
Pemberton Partners LLC
Solstice Biomedical Devices Ltd
See Aldermere Partners LLC

Dates

October 28, 2024
May 9, 2024
November 14, 2017
June 22, 2035
April 30, 2019
September 15, 2036
March 2, 2021
January 10, 2038
November 18, 2024
October 22, 2024

Amounts

—

Obligations

At the same time, the Federal Circuit has cautioned that courts must be careful not to read limitations from the specification into the claims
In bladed trocar designs, the safety of the obturator blade is a critical design consideration, as the blade must penetrate the abdominal wall but must not injure internal organs or structures upon entering the peritoneal cavity
The seal must accommodate instruments of varying diameters while preventing the escape of insufflation gas (typically carbon dioxide)
The insufflation valve must manage gas flow effectively while allowing instruments to be inserted, removed, or exchanged without significant loss of intra-abdominal pressure
First, independent Claim 1 must include a "locking interface" of some kind — otherwise, Claim 3's further limitation of the "locking interface" to a "snap-fit detent" would be nonsensical
" This is contrary to the plain meaning of the term and violates the well-established principle that every word of a claim must be given meaning