Extract to table
Pull the structured facts out of a document: parties, dates, amounts, obligations.
Extract to table / draft-sampling-monitoring-plan.docx
draft-sampling-monitoring-plan.docx
Parties
DRAFT SA
Torchlight Mining Corp
Harkness LLP
Dates
February 24, 2025
February 19, 2025
September 15, 2022
February 15, 2025
December 14, 2025
June 14, 2026
December 14, 2026
June 14, 2025
June 14, 2027
June 14, 2055
Amounts
$165,000,000
$80,000,000
$198.6
$134.9
Obligations
In the event of any conflict between this Plan and the Consent Decree, the terms of the Consent Decree shall control
If the Effective Date differs from this assumption, all dates shall be adjusted accordingly
3 General Sampling Protocols All sampling activities conducted under this Plan shall be performed in accordance with the methods and procedures described in this section and in the site-specific monitoring sections (Sections 3 through 6)
Where a state regulatory agency has specified alternative or supplementary methods in a permit or corrective action order, such methods shall also be used, and any discrepancies between EPA and state methods shall be resolved through consultation with the applicable EPA Regional Project Coordinator
Prior to sampling, monitoring wells shall be purged using a low-flow pump (e
Stabilization of field parameters — pH, specific conductance, temperature, dissolved oxygen (DO), and oxidation-reduction potential (ORP) — shall be achieved before sample collection commences