Extract to table / epc-exhibit-a-scope.docx
epc-exhibit-a-scope.docx
Parties
STONEBRIDGE CAMPUS HOLDINGS LLC
Ironhaven Data Centers LLC
Me Rooms
Dunmore Partners LLC
Scope Inc
Dates
October 20, 2025
November 1, 2025
August 1, 2027
November 1, 2027
Amounts
$412,000,000
$103,000,000
$858.33
$4,291,667
$18,500,000
Obligations
All capitalized terms used but not otherwise defined in this Exhibit A shall have the meanings ascribed to such terms in the Agreement
In the event of any conflict or inconsistency between the provisions of this Exhibit A and the body of the Agreement, the provisions of the Agreement shall control and govern, unless this Exhibit A expressly provides otherwise with respect to a specific technical requirement or specification set forth herein
For the avoidance of doubt, the technical specifications and performance criteria set forth in this Exhibit A are intended to supplement and detail the general scope of work described in the Agreement, and Contractor's obligations under this Exhibit A are coextensive with, and shall be performed in accordance with, all other terms and conditions of the Agreement and the Contract Documents
(d) Utility Power Supply: Utility power for the Campus shall be supplied by Vantage Power Cooperative ("VPC") under a Large Load Service Agreement entered into between Owner (or its affiliate) and VPC
Any increase in design capacity beyond 96 MW total critical IT load or 120 MVA total contracted utility demand shall require a modification to this Exhibit A and may constitute a change to the Work under the Agreement
Final GFA for each building will be confirmed upon completion of the construction document phase and shall be reflected in the as-built documentation