Extract to table
Pull the structured facts out of a document: parties, dates, amounts, obligations.
Extract to table / backup-power-strategy-memo.docx
backup-power-strategy-memo.docx
Parties
Harkness LLP
Ironhaven Data Centers LLC
Stonebridge Campus Holdings LLC
Harborview Corp
Scope Inc
Insurance Corp
Cascade Commercial Lending Corp
Dates
May 19, 2025
June 1, 2027
August 1, 2027
May 30, 2025
June 1, 2025
July 1, 2025
November 1, 2025
Amounts
$412,000,000
$18,500,000
$8.42
$12,124,800
$103,000,000
$8,200,000
$12,400,000
$33,000,000
$50,000,000
$137,500
Obligations
a utility outage without concurrent generator failure), only one side is required to carry the full building load; the second side provides complete redundancy and is available as a backup to the backup
Generator Sizing Per Building The generator sizing for each building is driven by the total electrical load that the generators must support during a utility outage
Under the 2N architecture, each "N" side (A-side and B-side) must independently provide generator capacity of approximately 30 MW
The ATS systems are the critical interface between the utility power feed and the generator plant and must be designed, procured, and commissioned as an integrated system with the generators and the broader electrical distribution infrastructure
All diesel generators installed at the Campus must comply with EPA Tier 4 Final emission standards for compression-ignition internal combustion engines, as codified in 40 CFR Part 1039
This start-to-load time is a critical performance parameter that directly affects the duration for which the UPS battery systems must bridge the gap between utility power loss and generator power availability