Parties

STONEBRIDGE CAMPUS HOLDINGS LLC
Ironhaven Data Centers LLC
Virginia State Corp
Army Corp
Cascade Commercial Lending Corp

Dates

October 15, 2025
June 1, 2027
August 1, 2027
November 1, 2027
November 1, 2025

Amounts

$18,500,000
$3,700,000
$5,550,000
$390,000,000

Obligations

In order to provide electric service at the capacity and voltage levels required by the LLSA, Cooperative must design, engineer, permit, and construct certain electric distribution and transmission infrastructure improvements, including a dedicated 230kV/34
"Contracted Demand" means 120 MVA, as set forth in the LLSA, representing the aggregate electric demand that the Line Extension Facilities must be designed and constructed to deliver to the Campus Site
(d) The words "include," "includes," and "including" shall be deemed to be followed by the phrase "without limitation
(h) Headings and captions are for convenience of reference only and shall not affect the interpretation of this Agreement
(j) In the event of a conflict between the body of this Agreement and any exhibit or schedule, the body of this Agreement shall control
Cooperative shall design, engineer, procure, permit, and construct (through Cooperative's Contractor) the Line Extension Facilities, which shall consist of the following: (a) High-Voltage Transmission Line Extension