cwa-npdes-compliance-review-memo.docx · 1006-00003

Parties

HARKNESS LLP
Crestline Packaging Solutions LLC
Speer LLP
TerraVerde Environmental Consulting LLC

Dates

October 22, 2022
September 8, 2022
October 12, 2022
October 5, 2022
October 11, 2022
July 25, 2022
August 22, 2022
September 15, 2022
March 15, 2019
March 14, 2024

Amounts

$94.5
$4,500
$1.2
$2.8
$75,000
$250,000
$1.925
$4.345
$65

Obligations

ACC is required to submit DMRs to PA DEP on a quarterly basis
ACC is required to collect representative stormwater samples from Outfall 001 during qualifying storm events (defined as precipitation events of at least 0
Records of visual inspections must be maintained on-site and made available to PA DEP upon request
In the event that any monitored parameter exceeds the applicable effluent limitation, ACC is required to report the exceedance to PA DEP in the DMR for the applicable reporting period
For exceedances of numeric effluent limitations that may result in a threat to public health or the environment, ACC is required to provide oral notification to PA DEP within twenty-four (24) hours of becoming aware of the exceedance, followed by a written notification within five (5) days
Best Management Practices (BMPs) The NPDES permit requires ACC to implement and maintain the following categories of BMPs at the Facility: • Containment of Outdoor Storage Areas: All outdoor storage of raw materials, intermediates, finished products, and waste containers must be within areas equipped with secondary containment or equivalent measures to prevent the migration of spilled materials to stormwater conveyances