PRIVILEGED AND CONFIDENTIAL — ATTORNEY WORK PRODUCT

CALDERWOOD & HARKNESS LLP 200 Park Avenue, 38th Floor New York, New York 10166

MEMORANDUM

TO: Patrick Gallagher, Lead Associate, Litigation (General)

FROM: Simone Laroche, Working Associate, Litigation (General)

DATE: January 30, 2023

RE: Mitigation of Damages — Vantor's Obligations Under New York Law

MATTER: Vantor Holdings Corp. v. Stonefield Logistics Group Inc., Case No. 22-cv-07841 (S.D.N.Y.) — Matter No. 1012-00005

CLIENT: Stonefield Logistics Group Inc.

I. Executive Summary

The purpose of this memorandum is to analyze the duty to mitigate damages under New York law as applied to Vantor Holdings Corp. ("Vantor" or "VHC") and its wholly owned subsidiary, Vantor Transport Services LLC ("VTS," and together with VHC, "Plaintiffs"), following Stonefield Logistics Group Inc.'s ("Stonefield" or "SLG") termination of the Transportation Services Agreement (the "TSA") on March 4, 2022. This memorandum is intended to provide a comprehensive legal framework to support the litigation team's development of Stonefield's Fourth Affirmative Defense — failure to mitigate — and to identify key factual targets for the upcoming discovery phase.

Core Conclusion. Under well-established New York law, Vantor bore an affirmative obligation to take reasonable steps to minimize its losses following the termination of the TSA. The doctrine of avoidable consequences requires that a party claiming damages arising from a breach of contract — even where that party contends the termination itself was wrongful — must exercise reasonable diligence and ordinary care to reduce the quantum of its loss. The injured party may not sit idly by, allow damages to accumulate, and then seek to recover the full extent of its claimed harm from the allegedly breaching party.

The factual predicate for this defense is strong. The freight transportation market in Q1–Q2 2022 was exceptionally robust. National spot truckload rates were elevated approximately 35% above historical averages during this period, driven by post-pandemic supply chain disruptions, aggressive inventory restocking by retailers and manufacturers, sustained consumer demand, and a national truck driver shortage estimated at more than 80,000 positions. These conditions were highly favorable for carriers seeking to place available equipment: shippers were actively competing for carrier capacity, meaning VTS could have commanded premium rates for the tractors, trailers, and drivers it claims were left idle by Stonefield's termination.

Based on the information currently available to the defense team — which is necessarily limited at this pre-discovery stage — there is no indication that Vantor made any meaningful effort to secure replacement freight for the capacity previously dedicated to the Stonefield account. Vantor's Amended Complaint identifies no specific mitigation steps, and pre-discovery correspondence from Vantor's counsel has been conspicuously silent on the subject. The only reference to mitigation in Vantor's pleadings is a claimed $1.4 million in "mitigation costs," a figure that, as discussed below, raises more questions than it answers and, if anything, suggests the inadequacy of whatever effort was made.

Strategic Relevance. Failure to mitigate is Stonefield's Fourth Affirmative Defense, as pled in the Answer and Affirmative Defenses filed on January 13, 2023. This memorandum provides the legal framework and preliminary factual analysis necessary to develop that defense. The factual record will be developed through discovery, including Defendant's First Set of Interrogatories (served March 6, 2023), Interrogatory No. 14 of which specifically targets Vantor's mitigation efforts, and Defendant's First Request for Production of Documents (RFP Nos. 22–26), which seek all communications with alternative shippers, replacement freight documentation, fleet utilization reports, and financial records bearing on Vantor's post-termination efforts to replace the Stonefield volume.

Damages Impact. Vantor claims approximately $95.4 million in total damages in this action. The failure-to-mitigate defense, if successful, could substantially reduce or eliminate several categories of those damages. In particular:

• Lost profits ($18.7 million): Vantor's claimed lost profits are predicated on the assumption that VTS could not replace the Stonefield revenue stream. If VTS could have — and should have — replaced that revenue through reasonable mitigation, the lost profits claim collapses.

• Stranded assets ($5.2 million): Vantor claims that tractors and trailers acquired for the SLG contract became "stranded" following termination. If those assets could have been redeployed to other accounts, they were not stranded, and the associated depreciation and lease termination costs are not recoverable.

• Workforce reduction costs ($2.87 million): Vantor claims severance and unemployment costs for approximately 180 drivers and support staff. In a market characterized by an acute driver shortage, the decision to lay off drivers rather than reassign them to other accounts reflects a failure to mitigate.

• Mitigation costs ($1.4 million): This claim, which implicitly acknowledges some mitigation effort, invites scrutiny of the scope and adequacy of that effort.

• Liquidated damages ($67.23 million): While the duty to mitigate may not directly reduce an enforceable liquidated damages award, the failure-to-mitigate analysis is relevant to the separate question of whether the liquidated damages clause is an unenforceable penalty. If Vantor's actual damages were minimal because replacement freight was readily available, the $67.23 million formula-based amount is grossly disproportionate to any reasonably anticipated or actual harm, supporting a finding of unenforceability.

In total, the mitigation defense directly targets $28.17 million in actual damages claims and indirectly bears on the enforceability analysis for the $67.23 million liquidated damages claim. The defense therefore has the potential to affect the disposition of substantially all of Vantor's claimed damages.

II. Factual Background Relevant to Mitigation Analysis

A. The Transportation Services Agreement and Termination

The Transportation Services Agreement ("TSA," Contract Reference No. SLG-VTS-2019-0315) was executed on March 15, 2019, between Stonefield Logistics Group Inc., in its capacity as "Shipper-Broker," and Vantor Transport Services LLC, in its capacity as "Carrier-Provider." The TSA was a comprehensive, multi-year contract governing VTS's provision of trucking and transportation services for freight tendered by Stonefield and its shipper clients across the Northeast and Mid-Atlantic corridors.

The TSA provided for a five-year term commencing April 1, 2019 and expiring March 31, 2024. The core commercial terms established an Annual Committed Volume ("ACV") of $43.2 million per year, yielding a total five-year minimum commitment of $216 million. In exchange for this substantial revenue commitment, VTS was required to maintain a minimum dedicated fleet capacity of 400 tractors and 1,200 trailers exclusively or primarily allocated to Stonefield freight. The agreement also established detailed Service Level Obligations ("SLOs"), which set measurable performance benchmarks across five categories:

(i) On-time pickup: ≥ 95%

(ii) On-time delivery: ≥ 93%

(iii) Tender acceptance: ≥ 90%

(iv) Equipment availability: ≥ 85%

(v) Cargo claims ratio: ≤ 0.5%

These SLOs were not mere aspirational targets; they were contractually binding performance obligations, and sustained failure to meet them constituted a material breach of the TSA under Section 12.2(b), subject to the cure provisions of Section 13.1.

Beginning in the second half of 2021, VTS's performance under the TSA deteriorated markedly. By Q4 2021, VTS had fallen materially below every SLO benchmark. On January 18, 2022, Stonefield issued a formal Cure Notice pursuant to Section 13.1(a) of the TSA. The Cure Notice, sent by Raymond Hess (Senior Vice President, Transportation Operations, Stonefield) to Sandra Milescu (Chief Operating Officer, VTS), identified material breaches across all five SLO categories based on Q4 2021 performance data:

• On-time pickup: 78.2% (versus 95% requirement) — a shortfall of 16.8 percentage points

• On-time delivery: 81.6% (versus 93% requirement) — a shortfall of 11.4 percentage points

• Tender acceptance: 71.4% (versus 90% requirement) — a shortfall of 18.6 percentage points

• Equipment availability: approximately 62% (approximately 248 tractors available versus the contractually required 400) — a shortfall of 23 percentage points

• Cargo claims ratio: 1.07% (versus ≤ 0.5% requirement) — more than double the permitted threshold — representing 16 individual cargo claims totaling $387,400 in aggregate claim value

Under Section 13.1(a) of the TSA, VTS was afforded a thirty-day cure period following receipt of the Cure Notice. That cure period expired on February 17, 2022. On February 14, 2022, three days before the cure period lapsed, VTS submitted a written response to Stonefield. That response, signed by Sandra Milescu, acknowledged what it characterized as "operational challenges" affecting VTS's service quality, but did not provide specific remediation plans, timelines, or evidence of actual cure. Critically, VTS did not demonstrate that it had returned to compliance with any of the five SLO categories or that it had restored the required fleet capacity of 400 dedicated tractors. The response was, by any reasonable measure, insufficient to constitute a cure of the identified material breaches.

On March 4, 2022, Stonefield terminated the TSA. The termination letter was sent by Tobias Wren, General Counsel of Stonefield Logistics Group Inc., to both Vantor Holdings Corp. and Vantor Transport Services LLC. The letter cited VTS's failure to cure material breaches under Section 13.1(a) as the basis for termination and identified the specific SLO failures documented in the January 18, 2022 Cure Notice. At the time of termination, the remaining term of the TSA was approximately two years and twenty-seven days (through March 31, 2024), representing approximately $86.4 million in remaining committed volume under the ACV.

B. Vantor's Business Profile and Capacity

Vantor Transport Services LLC is a regional trucking and transportation services provider operating primarily in the Northeast and Mid-Atlantic corridors. VTS operates a fleet of approximately 650 owned tractors and 2,100 trailers, with additional capacity available through a network of owner-operator contractors. VTS provides regional distribution, dedicated contract carriage, and over-the-road truckload services. The company is a wholly owned subsidiary of Vantor Holdings Corp., which also holds interests in related logistics and warehousing businesses.

Vantor reported consolidated revenue of approximately $385 million for fiscal year 2021 and approximately $310 million for fiscal year 2022. The year-over-year revenue decline of approximately $75 million is attributed by Vantor primarily to the loss of the Stonefield contract and, secondarily, to general freight market softening that began in Q3 2022. Vantor employs approximately 1,900 individuals, including drivers, support staff, dispatchers, mechanics, and administrative personnel.

For purposes of the mitigation analysis, a critical factual point concerns VTS's fleet allocation in the months preceding termination. Under the TSA, VTS was required to maintain a minimum of 400 dedicated tractors and 1,200 trailers for Stonefield freight. However, by Q4 2021, VTS had unilaterally reduced the equipment available for Stonefield operations to approximately 248 tractors — only 62% of the contractually required minimum. The remaining 152 tractors had been redeployed to other uses. In a November 12, 2021 email from Sandra Milescu (COO, VTS) to Nikolai Vantorovich (CEO, VHC), Milescu stated: "We've pulled 85 tractors off the SLG dedicated lanes to cover [redacted] commitments." Supplemental fleet records obtained from publicly available DOT filings and broker partner disclosures indicate that a significant portion of the redeployed equipment was directed to service Northwind Distribution Co. and at least two other shipper accounts.

This pre-termination redeployment is significant for two reasons. First, it was itself a material breach of VTS's obligations under the TSA and contributed directly to the SLO failures that justified Stonefield's termination. Second, and more pertinent to the mitigation analysis, it demonstrates that VTS had the operational capacity, logistical infrastructure, and existing customer relationships to absorb freed capacity into other revenue-generating activities. If VTS could redeploy 85 tractors to other accounts before termination — while still nominally under an obligation to dedicate those tractors to Stonefield — there is no reason VTS could not have redeployed the remaining tractors after termination, when the obligation to maintain dedicated Stonefield capacity no longer existed.

C. Vantor's Claimed Damages Categories Affected by Mitigation

Vantor's Amended Complaint, filed November 8, 2022, claims total damages of approximately $95.4 million, broken down across the following categories:

The duty to mitigate bears on each of these categories, although with differing degrees of directness. The lost profits, stranded assets, workforce reduction, and mitigation costs categories — totaling $28.17 million — are subject to direct reduction based on Vantor's failure to take reasonable steps to minimize losses. The liquidated damages claim, while potentially insulated from the mitigation defense if the clause is found enforceable, is indirectly affected because Vantor's failure to mitigate is relevant evidence supporting Stonefield's argument that the clause is an unenforceable penalty.

It is worth noting that Vantor's $1.4 million "mitigation costs" claim presents a logical tension with its other damages claims. If Vantor in fact incurred $1.4 million in costs seeking replacement freight, the obvious questions are: what did those efforts yield, and why did they not result in meaningful volume replacement? In a market where spot rates were 35% above historical averages and shippers were competing aggressively for carrier capacity, a carrier with 248 to 400 available tractors should have been able to place substantial capacity through a $1.4 million expenditure. If it did not, the inference is either that the effort was inadequate or misdirected, or that Vantor made affirmative business decisions that undercut its own mitigation obligations.

D. Freight Market Conditions — Q1–Q2 2022

The state of the U.S. trucking and freight transportation market during the relevant mitigation window — approximately March through June 2022, and extending through Q3 2022 — is a central factual issue in the mitigation analysis. The market conditions prevailing during this period were exceptionally favorable for carriers seeking to place available equipment and generate revenue.

Demand and Rates. The U.S. trucking and freight market in Q1 2022 and Q2 2022 was characterized by historically elevated demand and tight capacity. National spot truckload rates were approximately 35% above historical averages during this period, reflecting sustained upward pressure from multiple converging factors. Truckload volumes remained elevated due to ongoing post-pandemic supply chain disruptions, aggressive inventory restocking by retailers and manufacturers (the so-called "bullwhip effect"), and continued strong consumer spending supported by fiscal stimulus and savings accumulated during the pandemic period. The Brightmoor Software index, the Dunmore Systems, and other widely followed freight market benchmarks all showed sustained elevated demand through at least mid-2022.

Capacity Constraints. On the supply side, carrier capacity remained constrained by a severe and persistent driver shortage. The American Trucking Associations estimated the national truck driver shortage at more than 80,000 positions as of early 2022, a figure that had grown substantially from pre-pandemic levels. Equipment availability was further limited by supply chain disruptions affecting the production of new Class 8 tractors, which were subject to extended lead times due to semiconductor shortages and other component supply issues. These capacity constraints meant that shippers were actively competing for available carrier services, creating a seller's market in which carriers could command premium pricing and had substantial leverage in selecting freight opportunities.

Implications for VTS. These market conditions were, by any reasonable measure, highly favorable for a carrier in VTS's position. A fleet operator with 248 to 400 tractors and corresponding trailer capacity available for redeployment — along with an experienced driver workforce — should have faced no difficulty in finding replacement freight during this period. VTS is an established, mid-size carrier with a diversified customer base, existing relationships with multiple shippers, and operational infrastructure across the Northeast and Mid-Atlantic corridors. The suggestion that VTS could not have replaced the Stonefield volume in this market strains credulity.

Market Softening. It is important to note that the favorable market conditions described above began to moderate in Q3 2022 and softened more significantly in Q4 2022 and into 2023, as consumer spending patterns shifted, inventory levels normalized, and new carrier capacity entered the market. However, the relevant mitigation window for Vantor commenced on March 4, 2022, the date of termination. The duty to mitigate required Vantor to act promptly following termination, and the most critical period for mitigation efforts was March through June 2022, when market conditions remained robust. Even accounting for a reasonable ramp-up period, VTS had at least three to four months of highly favorable market conditions in which to pursue replacement freight.

Stonefield's own revenue declined from approximately $1.42 billion in fiscal year 2021 to approximately $1.28 billion in fiscal year 2022, reflecting the later freight market softening. However, this decline was concentrated in the second half of 2022 and does not undermine the conclusion that Q1–Q2 2022 presented ample mitigation opportunities for VTS. If anything, Stonefield's experience confirms the trajectory: the market was strong in the first half of 2022 and weakened thereafter, making prompt mitigation efforts all the more important.

III. Legal Framework — Duty to Mitigate Under New York Law

A. General Doctrine

Under well-settled New York law, a party injured by a breach of contract has an affirmative duty to take reasonable steps to minimize — that is, to mitigate — its damages. This principle, sometimes referred to as the "doctrine of avoidable consequences," is a fundamental limitation on the recovery of contract damages and has been recognized by New York courts for well over a century. See Wilmot v. State, 32 N.Y.2d 164, 169 (1973) (describing the duty to mitigate as a "fundamental principle" of damages law); Losei Realty Corp. v. City of New York, 254 N.Y. 41, 47 (1930) (injured party "cannot recover for loss which it might have prevented by reasonable efforts"); Hadley v. Baxendale, 9 Exch. 341, 156 Eng. Rep. 145 (1854) (foundational articulation of foreseeability and mitigation principles in contract damages).

The rule is straightforward in principle: the non-breaching party may not recover damages that it could have avoided through the exercise of reasonable diligence and ordinary care. A party may not passively allow its losses to accumulate when reasonable steps are available to reduce or eliminate those losses and then seek to charge the full extent of the unchecked harm to the breaching party. As the Court of Appeals stated in Losei Realty, the injured party must act "with a view to keeping damages down, as every prudent person is expected to do." 254 N.Y. at 47.

The standard is one of reasonableness, not perfection. The injured party is not required to make extraordinary efforts, incur substantial additional expense, accept undue risk, or sacrifice its own business interests in order to protect the breaching party from the consequences of its breach. See LKQ Corp. v. Gen. Motors LLC, 2019 WL 2372825, at 6 (S.D.N.Y. June 5, 2019); Restatement (Second) of Contracts § 350(1) (1981) ("damages are not recoverable for loss that the injured party could have avoided without undue risk, burden or humiliation"). However, the injured party must make reasonable, good-faith efforts to minimize its losses when the opportunity to do so presents itself. The party may not "sit idly by and allow damages to accumulate" where reasonable alternatives exist. Wilmot*, 32 N.Y.2d at 169.

Several additional principles warrant emphasis:

Affirmative Defense. Failure to mitigate is an affirmative defense. The burden of proving that the injured party failed to mitigate rests on the party asserting the defense — here, Stonefield. See Holy Properties Ltd., Inc. v. Kenneth Cole Prods., Inc., 87 N.Y.2d 130, 133 (1995); Wilmot, 32 N.Y.2d at 169. This allocation of the burden is significant for litigation strategy, as discussed in Section III.D below.

Objective Standard. The reasonableness of the injured party's mitigation efforts is evaluated under an objective standard. The question is not whether the injured party acted in subjective good faith, but whether a reasonable person in the same circumstances would have taken the steps that the injured party failed to take. See LKQ Corp., 2019 WL 2372825, at 6; Restatement (Second) of Contracts* § 350 cmt. b.

Failure to Act. The duty to mitigate encompasses both affirmative action (taking steps to reduce loss) and forbearance (refraining from actions that would increase loss). In the context of a lost contract, the primary obligation is affirmative: the injured party must seek replacement business, redeploy assets, and reduce unnecessary costs. See Kenford Co. v. County of Erie, 73 N.Y.2d 312, 319–20 (1989) (discussing foreseeability and mitigation in the context of a lost-contract claim).

B. Application in Commercial Contract / Transportation Context

The duty to mitigate is particularly well-developed in the context of commercial service contracts, including transportation and logistics agreements. In this context, courts have regularly required the non-breaching party to seek substitute performance or replacement business opportunities when a major contract is terminated or breached.

For a carrier that loses a significant contract, reasonable mitigation may include any or all of the following steps:

(i) Actively seeking replacement shippers to fill the freed capacity, including through direct outreach to existing and prospective customers, participation in freight brokerage platforms, and submission of bids and proposals for new contract freight;

(ii) Entering the spot market to generate revenue from available equipment during the period required to secure replacement contract freight;

(iii) Redeploying fleet assets — tractors, trailers, and associated equipment — from the terminated contract to other existing accounts or new lanes;

(iv) Retaining and reassigning the driver workforce to other revenue-generating activities rather than undertaking unnecessary layoffs; and

(v) Reducing fixed costs where replacement revenue is genuinely unavailable — for example, by returning leased equipment, downsizing facilities, or reducing administrative overhead — to minimize the ongoing losses attributable to the terminated contract.

The availability of substitute opportunities is a key factual inquiry in any mitigation analysis. Where the market for the injured party's services is robust and replacement business is readily available, courts are more likely to find that the injured party could and should have mitigated its losses. Conversely, where market conditions are depressed and replacement opportunities are scarce, a party's failure to replace lost business may be excused. See, e.g., Sutherland v. Gross, 105 Misc.2d 1068, 1071 (N.Y. Sup. Ct. 1980) (evaluating availability of substitute opportunities as a factor in mitigation analysis).

In the transportation and logistics sector, courts have recognized that a carrier's ability to place equipment in the freight market is a function of prevailing supply-and-demand conditions. When demand for carrier services is high and capacity is tight — as was the case in Q1–Q2 2022 — the carrier is in a strong position to replace lost business, and the failure to do so is difficult to justify. See, e.g., Great Lakes Dredge & Dock Co. v. City of Chicago, 3 N.E.3d 1 (Ill. 2013) (analogous case involving duty to mitigate by seeking replacement contracts in a favorable market; while an Illinois decision, the court's reasoning is instructive and consistent with New York law); see also Indu Craft, Inc. v. Bank of Baroda, 47 F.3d 490, 496 (2d Cir. 1995) (applying New York law; the availability of substitute arrangements is relevant to the assessment of mitigation).

New York courts have consistently reduced damages awards where the evidence shows that the injured party failed to pursue readily available replacement business. See, e.g., Holy Properties, 87 N.Y.2d at 133–34 (landlord-tenant context; duty to mitigate by seeking replacement tenant); LKQ Corp., 2019 WL 2372825, at *6–7 (commercial supply contract; duty to seek replacement supplier). While the specific transportation-contract context does not appear to have generated a New York appellate decision directly on point, the general principles are clear and have been applied in analogous commercial settings.

C. Interaction with Liquidated Damages Provisions

An important and somewhat complex question arises regarding the interaction between the duty to mitigate and Vantor's claim for liquidated damages under Section 14.2 of the TSA. Vantor claims $67.23 million in liquidated damages — the single largest component of its damages claim — calculated by applying the TSA's formula to the remaining contract term. Whether the duty to mitigate applies to reduce an enforceable liquidated damages award is a question that warrants careful analysis.

General Rule. Under New York law, if a liquidated damages clause is found to be enforceable — that is, if the stipulated amount is a reasonable pre-estimate of the probable loss and not a penalty — the liquidated amount generally represents the parties' agreed-upon measure of damages, and the duty to mitigate does not operate to reduce it below the agreed figure. This is because the very purpose of a liquidated damages clause is to establish a fixed quantum of recovery in advance, dispensing with the need to prove actual damages. To require mitigation as a reduction of liquidated damages would effectively convert the liquidated amount back into an actual-damages inquiry, undermining the purpose of the clause. See, e.g., Kestrel Corporation, 4 N.Y.3d 373, 380 (2005) (discussing the purpose and enforceability of liquidated damages provisions); Northpoint Holdings v. Purdy Corp., 41 N.Y.2d 354 (1977) (landmark New York liquidated damages case).

Strategic Implications. This principle, however, cuts both ways for Vantor, and the mitigation analysis is relevant to the liquidated damages claim in several important respects:

(i) If the clause is enforceable: Vantor's failure to mitigate may be irrelevant to the $67.23 million liquidated damages component, because the parties agreed to a pre-set quantum regardless of actual loss. However, Stonefield's other defenses to the liquidated damages claim — principally, that the clause is an unenforceable penalty — remain available and are addressed in the separate Memorandum re Enforceability of Liquidated Damages Clause Under NY Law (September 19, 2022).

(ii) If the clause is unenforceable (as Stonefield argues): If the liquidated damages clause is struck down as an unenforceable penalty, Vantor's recovery on this component reverts to actual damages, which must be proven with reasonable certainty. In that scenario, the duty to mitigate applies with full force, and the analysis presented in this memorandum directly governs the recoverability and quantum of Vantor's actual losses.

(iii) Mitigation evidence supports the penalty argument: Perhaps most importantly for strategic purposes, Vantor's failure to mitigate is itself powerful evidence supporting Stonefield's contention that the liquidated damages clause is an unenforceable penalty. The enforceability of a liquidated damages provision under New York law turns on whether the stipulated amount is a "reasonable measure of the anticipated probable harm" at the time of contracting. JMD Holding, 4 N.Y.3d at 380. If Vantor could have readily replaced the lost Stonefield volume in the prevailing market — as the evidence strongly suggests — then Vantor's actual damages would have been minimal: some transition costs, perhaps a short-term revenue gap, and the difference (if any) between Stonefield contract rates and replacement rates. Against that backdrop of minimal actual harm, a $67.23 million liquidated damages formula is grossly disproportionate to any reasonably anticipated loss, strongly supporting a finding that the clause is a penalty and therefore unenforceable.

Recommendation. We recommend that the mitigation argument be deployed in both contexts: (a) as an independent affirmative defense to all non-liquidated damages categories (lost profits, stranded assets, workforce reduction, and mitigation costs), seeking to eliminate or substantially reduce the $28.17 million claimed under those headings; and (b) as supporting evidence for the enforceability-as-penalty argument with respect to the $67.23 million liquidated damages claim. The two arguments are complementary and mutually reinforcing.

D. Burden of Proof

As noted above, failure to mitigate is an affirmative defense, and the burden of proof rests on the party asserting it. Holy Properties, 87 N.Y.2d at 133. In this case, Stonefield bears the burden of establishing two elements:

(i) That Vantor failed to make reasonable efforts to mitigate its damages following the termination of the TSA; and

(ii) That such efforts, if made, would have reduced Vantor's losses — that is, that reasonable mitigation opportunities existed and would have yielded replacement revenue or cost savings sufficient to reduce the claimed damages.

Stonefield does not need to prove that mitigation would have eliminated all of Vantor's damages. It is sufficient to show that reasonable efforts would have reduced the claimed amount. See id. at 134; see also Restatement (Second) of Contracts § 350(1) (damages not recoverable "to the extent" they could have been avoided). The question is one of degree: to what extent could Vantor's losses have been reduced through the exercise of reasonable diligence?

Once Stonefield satisfies its burden on these two elements, the burden effectively shifts to Vantor to demonstrate either (a) that it did in fact take reasonable steps to mitigate, or (b) that no reasonable mitigation alternatives were available — that is, that despite the exercise of ordinary care, Vantor could not have reduced its losses. See, e.g., Holly Properties, 87 N.Y.2d at 133–34 (discussing the burden-shifting framework). At this stage, Vantor must come forward with evidence of its actual efforts — or the absence of available opportunities — to rebut Stonefield's showing.

This burden allocation has important implications for litigation strategy. During discovery, Stonefield should focus on developing the affirmative case for failure to mitigate — principally by demonstrating the favorable market conditions, the availability of replacement freight, and VTS's existing capacity and customer relationships — while simultaneously using targeted discovery to uncover (or confirm the absence of) Vantor's actual mitigation efforts. As discussed in Section V below, the discovery plan is designed to accomplish both objectives.

IV. Application to Vantor's Specific Damages Claims

A. Lost Profits ($18.7 Million)

Vantor claims $18.7 million in lost profits, representing the profit VTS would have earned on the remaining committed volume under the TSA had the contract not been terminated. The calculation is based on a 12% average operating margin applied to the remaining ACV of approximately $86.4 million (2 years × $43.2 million per year), as set forth in the expert report of Dr. Philip Trask of Trask Greystone & Associates. The lost profits claim is, by its nature, entirely dependent on the assumption that VTS could not have replaced the Stonefield revenue with equally or more profitable substitute freight.

The duty to mitigate applies directly and with particular force to a lost profits claim. Under New York law, the injured party cannot recover lost profits attributable to a period during which it could have earned comparable profits through the exercise of reasonable diligence. See Wilmot, 32 N.Y.2d at 169; Kenford Co., 73 N.Y.2d at 319. The analysis requires a comparison between (a) the profits VTS would have earned under the TSA and (b) the profits VTS could reasonably have earned through replacement freight during the same period.

The freight market conditions prevailing in Q1–Q2 2022 strongly support the conclusion that VTS could have obtained replacement freight at rates equal to or exceeding the Stonefield contract rates. National spot truckload rates were approximately 35% above historical averages during this period. Contract rates, while typically lower than spot rates, were also elevated, reflecting the general tightness of the freight market. In these conditions, VTS — an established carrier with a fleet of 650 tractors, 2,100 trailers, and existing relationships with numerous shippers — should have been able to place the capacity previously dedicated to the Stonefield account without significant difficulty, and potentially at higher margins than the 12% assumed in Vantor's damages model.

If VTS had redeployed the 248 tractors it still had available at the time of termination — or, for that matter, the full 400 tractors previously committed under the TSA — to other shippers, it could have generated comparable or greater revenue, eliminating or substantially reducing the claimed lost profits. The replacement revenue would have offset the Stonefield revenue stream, and any operating margin earned on replacement freight would directly reduce the lost profits calculation.

The fact that VTS had already pulled 85 tractors off the SLG-dedicated lanes and was servicing other accounts before the TSA was terminated is particularly probative. The November 12, 2021 email from Sandra Milescu to Nikolai Vantorovich — "We've pulled 85 tractors off the SLG dedicated lanes to cover [redacted] commitments" — together with supplemental fleet records indicating diversion to Northwind Distribution Co. and other accounts, demonstrates that VTS had existing customer relationships and operational channels through which to place capacity. If VTS could divert 85 tractors to alternative revenue-generating activities while still nominally bound by the TSA's capacity requirements, it could certainly have done so — and on a larger scale — after the obligation to dedicate capacity to Stonefield no longer existed.

Vantor's failure to identify any specific mitigation steps in its Amended Complaint or in pre-discovery correspondence with Stonefield's counsel is a significant red flag. The Amended Complaint does not allege that VTS sought replacement shippers, entered the spot market, or took any other steps to replace the lost revenue. The only reference to mitigation is the $1.4 million "mitigation costs" claim, which, as discussed below, raises more questions than it answers. Interrogatory No. 14, served as part of Defendant's First Set of Interrogatories, is specifically designed to compel Vantor to disclose what, if anything, it did to find replacement freight following the termination.

Discovery should focus on obtaining internal Vantor communications from March through September 2022 regarding efforts (or the absence of efforts) to find replacement shippers. Business development records, sales pipeline reports, outbound proposals, and RFP submissions will be critical. If these records show that VTS made little or no effort to replace the Stonefield volume during the most favorable market conditions, the lost profits claim should be substantially reduced or eliminated on mitigation grounds.

B. Stranded Assets ($5.2 Million)

Vantor claims $5.2 million in damages for so-called "stranded assets" — consisting of accelerated depreciation on tractors and trailers allegedly acquired specifically for the SLG contract and lease termination costs for equipment leased in connection with that contract. The premise of this claim is that the termination of the TSA rendered certain fleet assets unproductive, forcing VTS to absorb depreciation and lease costs on equipment that could no longer generate revenue.

The mitigation analysis substantially undermines this claim. If VTS redeployed the equipment in question to other accounts — as it had already begun doing before the termination — the assets would not have been "stranded," and VTS would not have incurred the accelerated depreciation or lease termination costs it now claims. The equipment at issue — tractors and trailers of standard commercial specification — is fungible. These are not custom-built, purpose-specific assets that could only serve the Stonefield account; they are standard Class 8 tractors and dry-van or refrigerated trailers that can be deployed on any lane, for any customer, hauling any compatible freight. VTS's fleet of 650 tractors and 2,100 trailers represents a diversified asset base, and the SLG-dedicated equipment was fully interchangeable with the remainder of the fleet.

The fact that VTS was already diverting SLG-dedicated equipment to Northwind Distribution Co. and other accounts before the termination directly contradicts the "stranded assets" narrative. If those tractors could serve other customers while still nominally allocated to the Stonefield contract, they could certainly do so after the Stonefield obligation was extinguished. The equipment was not stranded; it was available for redeployment, and VTS had a duty to redeploy it.

Under the duty to mitigate, VTS was obligated to redeploy its equipment to revenue-generating uses rather than allow it to sit idle and claim the resulting depreciation and carrying costs against Stonefield. To the extent that VTS chose not to redeploy the equipment — or affirmatively chose to terminate leases rather than reassign the leased equipment to other accounts — those decisions represent a failure to mitigate, and the resulting costs should not be recoverable.

Discovery should seek fleet utilization reports for March through December 2022, showing the deployment status of each tractor and trailer previously allocated to the Stonefield account. If those assets were in fact redeployed (generating revenue that Vantor has not disclosed), the stranded assets claim is directly contradicted. If they were not redeployed despite the availability of replacement freight opportunities, the failure to redeploy constitutes a failure to mitigate.

C. Workforce Reduction Costs ($2.87 Million)

Vantor claims $2.87 million in severance payments and unemployment insurance costs associated with the termination of approximately 180 drivers and support staff allegedly laid off as a consequence of the TSA termination. This claim rests on the premise that the loss of the Stonefield contract left VTS with excess personnel for whom no work was available.

The mitigation analysis challenges this premise on two fronts. First, the U.S. trucking industry in Q1–Q2 2022 was experiencing an acute and well-documented driver shortage, estimated at more than 80,000 positions nationally. In this environment, experienced commercial truck drivers were in exceptionally high demand, and carriers were competing aggressively for driver talent — offering signing bonuses, wage increases, and enhanced benefits packages. Any drivers released by VTS would have been highly marketable and should have been able to find alternative employment relatively quickly. The suggestion that VTS's decision to lay off 180 drivers was an unavoidable consequence of the TSA termination, rather than a voluntary business decision, is undermined by the prevailing labor market conditions.

Second, and more fundamentally, if VTS had fulfilled its duty to mitigate by redeploying its equipment to other accounts and securing replacement freight, the drivers could have been retained and assigned to the replacement freight activities. The decision to lay off drivers, rather than reassign them, reflects either a failure to secure replacement freight (itself a mitigation failure) or an affirmative corporate decision to downsize the workforce for reasons unrelated to the TSA termination. In either case, the resulting severance and unemployment costs should not be charged to Stonefield.

Discovery should probe several specific issues: (i) the timing of the layoffs relative to the March 4, 2022 termination date — were drivers laid off immediately, or were they retained for a reasonable period while replacement freight was sought?; (ii) whether drivers were offered reassignment to other VTS accounts or lanes; (iii) the average time required for laid-off drivers to find new employment, which bears on the reasonableness of VTS's decision to terminate rather than retain and reassign; and (iv) whether VTS subsequently hired new drivers for other accounts during the same period, which would suggest that the layoffs were a function of internal allocation decisions rather than an unavoidable consequence of the termination.

D. Mitigation Costs ($1.4 Million)

Vantor claims $1.4 million in costs allegedly incurred in efforts to seek replacement freight following the termination of the TSA. This claim is notable because it implicitly acknowledges that Vantor recognized its obligation to mitigate and undertook some effort to do so. The question, however, is the scope, diligence, and effectiveness of that effort.

If Vantor spent $1.4 million seeking replacement freight and obtained no meaningful replacement volume — as suggested by the simultaneous claim for $18.7 million in unmitigated lost profits — that outcome raises serious questions. There are two possible explanations:

(a) The mitigation efforts were inadequate, misdirected, or not genuinely pursued. A $1.4 million expenditure over a period of months for a carrier with 248–400 available tractors and annual revenue of $385 million is modest by any measure. If the expenditure consisted primarily of nominal administrative costs — perhaps the salary of a single business development executive and some incidental expenses — rather than a genuine, full-scale effort to place capacity, the effort was likely insufficient to satisfy the duty of reasonable diligence.

(b) Market conditions were so unfavorable that even a genuine effort could not yield replacement volume. This explanation is flatly contradicted by the objective evidence of market conditions in Q1–Q2 2022, including elevated spot rates, tight capacity, and strong shipper demand.

Discovery must probe the composition and results of the $1.4 million expenditure in detail. What specific activities comprised the $1.4 million cost? Were these salaries, consulting fees, broker commissions, marketing expenses, or something else? What replacement volume, if any, was obtained? If some replacement freight was secured, what revenue did it generate, and why was it not sufficient to offset a meaningful portion of the Stonefield volume? If the effort was genuinely diligent but unsuccessful, why did it fail in a historically favorable market? These questions will be central to the development of the mitigation defense.

E. Liquidated Damages ($67.23 Million) — Indirect Relevance

As discussed at length in Section III.C, the duty to mitigate may not directly reduce an enforceable liquidated damages award under New York law. If the TSA's liquidated damages clause (Section 14.2) is found to be an enforceable pre-estimate of anticipated harm, the $67.23 million amount represents the parties' agreed measure of damages, and Vantor's failure to seek replacement freight may not reduce the recovery below that amount.

However, Vantor's failure to mitigate is highly relevant — indeed, potentially dispositive — to the separate question of whether the liquidated damages clause is enforceable or constitutes an unenforceable penalty. The enforceability analysis under New York law requires a determination of whether the stipulated amount bears a reasonable relationship to the anticipated probable harm at the time of contracting. JMD Holding, 4 N.Y.3d at 380. If Vantor's actual damages were minimal because replacement freight was readily available in the market — as the evidence suggests — then the $67.23 million formula-based amount is grossly disproportionate to any reasonably anticipated loss, supporting a finding of unenforceability.

This analysis is developed more fully in the Memorandum re Enforceability of Liquidated Damages Clause Under NY Law, dated September 19, 2022, which concluded that there is a "moderate" probability that the clause would be found unenforceable as a penalty. The mitigation evidence strengthens that assessment: the more clearly it can be shown that Vantor could have replaced the Stonefield volume with minimal effort and cost, the more disproportionate the $67.23 million figure appears, and the stronger the penalty argument becomes.

We also note, for purposes of coordination with other defense theories, that the forthcoming Memorandum re Duplicative Damages will address the additional argument that Vantor cannot recover both liquidated damages and lost profits, as these two categories compensate for the same underlying harm — the loss of revenue from the remaining contract term. If Vantor is limited to one or the other, and if the liquidated damages clause is found unenforceable, the mitigation defense could eliminate the lost profits claim entirely, leaving Vantor with minimal actual damages.

V. Key Evidentiary Considerations and discovery Targets

The success of the mitigation defense will depend on the factual record developed through discovery. While the legal framework strongly supports Stonefield's position, and the publicly available market data provides a favorable backdrop, the core factual question — what Vantor actually did (or failed to do) to mitigate its losses — will be answered through the documentary record and testimony obtained from Vantor. Below is a summary of the key evidentiary targets.

A. Documents to Obtain from Vantor

Defendant's First Request for Production of Documents, served March 6, 2023, includes several requests targeted specifically at mitigation-related evidence. The key requests are RFP Nos. 22 through 26. In addition, several other outstanding document requests will yield documents relevant to the mitigation analysis. The principal categories of documents to be obtained include:

1. Post-termination communications regarding replacement freight. All internal VTS and VHC communications from March 4, 2022 forward regarding efforts to find replacement freight, alternative shippers, new contract opportunities, or spot market participation. This includes emails, memoranda, meeting notes, presentations, and instant messages. (Covered by RFP Nos. 22 and 23.)

2. Business development records. All proposals, RFPs, bids, and statements of qualifications submitted by VTS to potential shippers or freight brokers following the termination of the TSA. (Covered by RFP No. 24.)

3. Fleet utilization reports. Reports, spreadsheets, and databases showing the deployment, assignment, and utilization of each tractor and trailer previously dedicated to the Stonefield account for the period March through December 2022. These records will show whether the equipment was redeployed to other accounts or left idle. (Covered by RFP No. 25.)

4. Financial statements and revenue breakdowns. Quarterly and monthly financial statements, revenue reports, and customer-level revenue breakdowns for Q1 through Q4 2022, showing revenue generated (or not generated) from replacement freight, including identification of new shipper relationships established post-termination. (Covered by RFP No. 26.)

5. Internal analyses and strategic plans. Any internal analyses, board presentations, management reports, or strategic plans prepared after March 4, 2022 regarding the impact of the TSA termination and plans for capacity redeployment, including any assessment of market conditions or replacement opportunities.

6. Northwind Distribution Co. and other shipper communications. All communications between VTS and Northwind Distribution Co. and any other shippers to whom fleet capacity was redeployed, both before and after the termination of the TSA. These documents will establish the extent of VTS's pre-existing relationships and the volume of business it directed to alternative accounts.

B. Interrogatory Responses

Two interrogatories from Defendant's First Set of Interrogatories, served March 6, 2023, are directly relevant to the mitigation defense:

Interrogatory No. 14 asks Vantor to describe in detail all steps taken to mitigate damages following the termination of the TSA, including: (a) identification of every potential shipper, freight broker, or other party contacted by VTS regarding replacement freight; (b) a description of every contract, agreement, or arrangement entered into by VTS for replacement freight services; (c) a statement of all revenue generated from replacement freight during the period March 2022 through the present; and (d) an explanation of why any mitigation efforts were unsuccessful. This interrogatory is the single most important discovery tool for the mitigation defense, and Vantor's response (or evasion) will be critical.

Interrogatory No. 9 addresses VTS's fleet redeployment decisions, asking Vantor to identify all tractors and trailers previously dedicated to the Stonefield account and to describe the disposition of each unit following termination — whether redeployed, idled, sold, returned to lessor, or otherwise disposed of, and the date and reason for each disposition.

Vantor's responses to these interrogatories should be reviewed carefully and, if incomplete or evasive, should be the subject of a meet-and-confer followed, if necessary, by a motion to compel. Based on patterns observed in other areas of the case, we anticipate the possibility that Vantor may provide vague, conclusory, or overly broad responses. Specificity and completeness should be demanded.

C. Deposition Targets

The following Vantor witnesses should be deposed with a focus on mitigation-related testimony:

Derek Pruitt, Vice President, Business Development, Vantor. Pruitt was the primary relationship manager for the Stonefield account and the logical person within Vantor to have led any post-termination effort to secure replacement freight. He should be questioned regarding: every potential shipper contacted by VTS following the termination; every proposal, bid, or RFP submitted; every contract or agreement entered into; the reasons for any failure to secure replacement volume; and the extent and results of VTS's participation in the spot freight market. Pruitt's testimony will be central to establishing whether VTS made a genuine, diligent effort to mitigate.

Sandra Milescu, Chief Operating Officer, Vantor/VTS. Milescu is the author of the November 12, 2021 email documenting the pre-termination diversion of 85 tractors to other accounts and is the senior operational executive responsible for fleet management and deployment decisions. She should be questioned regarding: fleet redeployment decisions following termination; the disposition of each tractor and trailer previously dedicated to the Stonefield account; workforce retention and reassignment decisions; the rationale for any driver layoffs; and VTS's operational capacity to absorb replacement freight.

Nikolai Vantorovich, Chief Executive Officer, Vantor Holdings Corp. As the CEO of the parent company, Vantorovich is responsible for overall corporate decision-making and capital allocation. He should be questioned regarding: the board-level and management-level response to the TSA termination; any strategic decisions regarding mitigation, capacity redeployment, or workforce adjustment; communications with investors, lenders, or board members regarding the impact of the termination; and the overall corporate direction taken following the loss of the Stonefield contract.

Gregory Fielding, Chief Financial Officer, Vantor. Fielding is responsible for the financial impact assessment and should be questioned regarding: the financial analysis underlying the damages calculations; the revenue replacement achieved (or not achieved) following termination; the basis for the $5.2 million stranded assets claim, including the depreciation methodology applied; the treatment of replacement revenue in the damages model; and any internal financial projections or analyses regarding the expected and actual impact of the termination on VTS's financial performance.

D. Expert Analysis

Kensington Analytics Group LLC ("KAG"), led by Dr. Evelyn Rosser, was retained on October 28, 2022 to serve as Stonefield's damages and economics expert. The scope of KAG's engagement, as outlined in the Expert Scope Memorandum dated November 14, 2022, already includes mitigation analysis. Dr. Rosser should be directed to prepare a comprehensive analysis addressing the following issues:

(i) Freight market conditions, Q1–Q2 2022. A detailed, data-driven analysis of the U.S. trucking and freight market conditions prevailing during the relevant mitigation window, including spot and contract truckload rates, truckload volume indices, carrier capacity utilization, and driver availability, with particular emphasis on the Northeast and Mid-Atlantic corridors in which VTS operates.

(ii) Revenue replacement potential. A quantitative estimate of the revenue VTS could reasonably have generated through redeployment of 248–400 tractors (and corresponding trailers and drivers) to replacement freight in the prevailing market, including both spot market and contract freight opportunities.

(iii) Damages reduction analysis. A category-by-category analysis of the extent to which each of Vantor's damages claims would have been reduced by reasonable mitigation, including lost profits, stranded assets, workforce reduction costs, and mitigation costs.

(iv) Liquidated damages reasonableness. An assessment of the impact of reasonable mitigation on the reasonableness of the liquidated damages formula, including a comparison of the $67.23 million formula-based amount to the estimated actual damages after mitigation.

Dr. Rosser's analysis should be grounded in publicly available market data (Brightmoor Software, Dunmore Systems, ATA tonnage data, Bureau of Labor Statistics employment data for the trucking sector) supplemented by documents obtained in discovery regarding VTS's actual post-termination operations and revenue. The mitigation analysis should be a central component of KAG's rebuttal expert report.

VI. Anticipated Vantor Counter-Arguments and Responses

Based on a review of Vantor's pleadings, the arguments advanced by Vantor's counsel (Renwick & Sayers LLP) in pre-discovery correspondence, and the general landscape of mitigation defense arguments, we anticipate the following counter-arguments from Vantor and recommend the following responses.

A. "Stonefield Caused the Need to Mitigate"

Anticipated Argument. Vantor is likely to contend that Stonefield's own alleged volume shortfalls, pretextual invocation of the cure-and-termination provisions, and wrongful termination of the TSA caused the harm for which Vantor now seeks damages. Vantor may argue that a wrongdoer should not benefit from its own wrongful conduct, and that imposing a duty to mitigate on Vantor effectively rewards Stonefield for its breach.

Response. This argument fundamentally mischaracterizes the nature of the duty to mitigate. Under New York law, the duty to mitigate applies to the injured party regardless of fault and regardless of whether the termination was wrongful or justified. Even if Stonefield breached the TSA — a contention Stonefield vigorously disputes — Vantor was still required to take reasonable steps to minimize its losses. The mitigation doctrine does not excuse the breaching party's wrongful conduct; it merely limits the damages the injured party may recover to those that could not have been reasonably avoided. See Wilmot, 32 N.Y.2d at 169; Losei Realty, 254 N.Y. at 47. The duty to mitigate is not a reward to the breaching party; it is a recognition that the law does not permit the injured party to passively accumulate avoidable losses and charge them to the other side. This principle is settled and should not present a serious obstacle at summary judgment or trial.

B. "Market Conditions Did Not Permit Replacement"

Anticipated Argument. Vantor may argue that the Stonefield contract provided dedicated, long-term, stable, and predictable revenue that cannot be fairly compared to the transactional, variable, and uncertain revenue available on the spot market or through short-term contract freight. Vantor may contend that it is unreasonable to expect a carrier to replace a major multi-year contract with ad hoc spot freight and that the quality and reliability of the revenue stream cannot be replicated through mitigation.

Response. While there is a conceptual distinction between long-term contract revenue and spot market revenue, this distinction does not excuse VTS from its duty to mitigate. Several points are responsive:

First, spot market revenue was abundantly available at premium rates in Q1–Q2 2022. While spot revenue is inherently less predictable than contract revenue, the sheer volume of available freight and the elevated rate environment meant that a carrier with 248–400 available tractors could have generated substantial revenue — potentially exceeding the Stonefield contract rates — through aggressive participation in the spot market.

Second, VTS was not limited to the spot market. VTS is an established, mid-size carrier with a diversified customer base and relationships with numerous shippers and freight brokers. In a market characterized by intense shipper demand for carrier capacity, VTS could have pursued and secured new contract-based relationships with other shippers, not just spot freight. The tight market conditions meant that shippers were actively seeking reliable carriers and were willing to offer favorable contract terms to secure capacity commitments.

Third, VTS's own pre-termination conduct demonstrates its ability to place capacity with other customers. The diversion of 85 tractors to Northwind Distribution Co. and other accounts — while still nominally under the TSA — shows that VTS had the operational capability, business relationships, and market knowledge to redirect equipment to alternative revenue sources.

Fourth, the duty to mitigate does not require that the injured party find a perfect substitute. It requires only reasonable efforts to reduce losses. Even if replacement revenue was somewhat less profitable or less stable than the Stonefield contract, VTS was obligated to pursue